The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional geologists and the technician who is incharge of maintaining of Mosul Dam project. By using matlab programme , acpecial programme of research was designed to estimate the fuzzy reliability of last three periods ,according to the results it was found that fuzzy reliability of Al.mosul dam in the recent time reaches to 0.5 approxmatly while the fuzzy reliability of Al.mosul dam after 20 years will reach to 0.1,ie, the danger of actual collapse of the dam will be in 2033 ,So that it is important to build a new dam making sure from chosing a suitable location with respect to soil quilty , geological and clamatic which suround the location , This is to avoid the same mistake which makes us lose 33 years from the hypothetical life time of Mosul dam according to the estimation of the company which build the dam.
The design was distinguished in Late Twenty-First Century With new and new methods Through which the ability to adapt all technical media in the formation of two-dimensional and three-dimensional figures and shapes was achieved .
Which led to the emergence of endless sets of design ideas characterized by the heterogeneity of design forms and design solutions that preceded it. The designer could not access these creations in various architectural and artistic fields only through computer programs, especially those related to the activation of mathematical logic and what is known as algorithms in the formation and construction of the form, which led to the emergence of the "parametric direction" and the problem of research is summarized
The research seeks to find out the extent of the coverage of the Mosul press to the issues of psychological and social effects of the organization "IS" on the community of Mosul, by analyzing the content of the newspapers “Economic City” and “Mosul News”. As well as to stand at the types of psychological and social effects and their repercussions on the Mosul community including figures, statistics and evidence that were covered in the theoretical study of these topics.
This study is the first scientific diagnosis to reveal the size and types of psychological and social effects of the “ISIS” organization through what was monitored by the Mosul press. The study seeks to draw the attention of officials, decision-m
... Show MoreIn this paper, we introduce the concept of cubic bipolar-fuzzy ideals with thresholds (α,β),(ω,ϑ) of a semigroup in KU-algebra as a generalization of sets and in short (CBF). Firstly, a (CBF) sub-KU-semigroup with a threshold (α,β),(ω,ϑ) and some results in this notion are achieved. Also, (cubic bipolar fuzzy ideals and cubic bipolar fuzzy k-ideals) with thresholds (α,β),(ω ,ϑ) are defined and some properties of these ideals are given. Relations between a (CBF).sub algebra and-a (CBF) ideal are proved. A few characterizations of a (CBF) k-ideal with thresholds (α, β), (ω,ϑ) are discussed. Finally, we proved that a (CBF) k-ideal and a (CBF) ideal with thresholds (α, β), (ω,ϑ) of a KU-semi group are equivalent relations.
تقدير النموذج اللوجستي باستخدام اوزان بيز المتسلسل
Estimation of the names and verbs of some letters to consider the grammatical industry
This paper shews how to estimate the parameter of generalized exponential Rayleigh (GER) distribution by three estimation methods. The first one is maximum likelihood estimator method the second one is moment employing estimation method (MEM), the third one is rank set sampling estimator method (RSSEM)The simulation technique is used for all these estimation methods to find the parameters for generalized exponential Rayleigh distribution. Finally using the mean squares error criterion to compare between these estimation methods to find which of these methods are best to the others
Productivity estimating of ready mixed concrete batch plant is an essential tool for the successful completion of the construction process. It is defined as the output of the system per unit of time. Usually, the actual productivity values of construction equipment in the site are not consistent with the nominal ones. Therefore, it is necessary to make a comprehensive evaluation of the nominal productivity of equipment concerning the effected factors and then re-evaluate them according to the actual values.
In this paper, the forecasting system was employed is an Artificial Intelligence technique (AI). It is represented by Artificial Neural Network (ANN) to establish the predicted model to estimate wet ready mixe
... Show MoreThin films were prepared from poly Berrol way Ketrrukemaaih pole of platinum concentrations both Albaarol and salt in the electrolytic Alastontrel using positive effort of 7 volts on the pole and the electrical wiring of the membrane record
Significant advances in horizontal well drilling technology have been made in recent years. The conventional productivity equations for single phase flowing at steady state conditions have been used and solved using Microsoft Excel for various reservoir properties and different horizontal well lengths.
The deviation between the actual field data, and that obtained by the software based on conventional equations have been adjusted to introduce some parameters inserted in the conventional equation.
The new formula for calculating flow efficiency was derived and applied with the best proposed values of coefficients ψ=0.7 and ω= 1.4. The simulated results fitted the field data.
Various reservoir and field parameters including late