The aim of this research is to solve a real problem in the Department of Economy and Investment in the Martyrs establishment, which is the selection of the optimal project through specific criteria by experts in the same department using a combined mathematical model for the two methods of analytic hierarchy process and goal programming, where a mathematical model for goal programming was built that takes into consideration the priorities of the goal criteria by the decision-maker to reach the best solution that meets all the objectives, whose importance was determined by the hierarchical analysis process. The most important result of this research is the selection of the second project (constructing a cultural centre in Sadr City) as the best alternative out of seven projects. Also, the possibility of applying this model to solve multi-criteria decision-making problems in many institutions and companies was reached.
The operation of production planning is a difficult operation and it's required High effect and large time especially it is dynamic activity which it's basic variables change in continuous with the time, for this reason it needs using one of the operation research manner (Dynamic programming) which has a force in the decision making process in the planning and control on the production and its direct affect on the cost of production operation and control on the inventory.
Decision making is vital and important activity in field operations research ,engineering ,administration science and economic science with any industrial or service company or organization because the core of management process as well as improve him performance . The research includes decision making process when the objective function is fraction function and solve models fraction programming by using some fraction programming methods and using goal programming method aid programming ( win QSB )and the results explain the effect use the goal programming method in decision making process when the objective function is
fraction .
The aim of this work is to provide an efficient selection technique as a part of planning process to guide the decision makers to decide the preferences of one supplier over another for purchasing lab instruments in education domain. Fuzzy Analytical Hierarchy Process has used as a multi-criteria decision process, as an industrial engineering tool with certain emphasis on the qualitative aspects required to the decision makers. While the concept of degree of possibility for each criterion is used to reach its relative weights, a specific methodology created to reach the final objective decision of supplier selection. A questionnaire form was developed and distributed to five universities located in Baghdad province with a total
... Show MoreThis Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th
... Show MoreThe Planning and Resource Development Department of the Iraqi Ministry of Health is very interested in improving medical care, health education, and village training programs. Accordingly, and through the available capabilities of the ministry, itdesires to allocate seven health centers to four villages in Baghdad, Iraq therefore the ministry needs to determine the number of health centers allocated to each of these villages which achieves the greatest degree of the overall effectiveness of the seven health centers in a fuzzy environment. The objective of this study is to use a fuzzy dynamic programming(DP) method to determine the optimal allocation of these centers, which allows the greatest overall effectiveness of these health centers
... Show MoreTerrorist crime is considered a serious act that outweighs all other crimes in terms of impact and result, because it has a wide range on societies, and it also contains a great thing of danger represented in its purpose, and here describing terrorism as a crime is a description that does not give the full right to this behavior or that it It abbreviates it and does not show its actual reality, given that terrorism contains several different crimes and the roles of its contributors, and these roles are necessary to reach the result or the end. In which each episode is complementary to the other, it is not a single act, but rather several joint and complex actions that in turn all lead to the result, and the agreement in the terrorist pro
... Show MoreIn recent years, landslides in mountainous provinces have been increasing. Whenever the rainy season comes, landslides occur, causing casualties to people and the infrastructure. Bac Can, which has suffered significant damage from landslides, is a mountainous province in the north of Vietnam. This study introduces the applying the analytic hierarchy process (AHP) to study landslides in Bac Can province, Vietnam. Currently, the earth's temperature is rising, and natural and anthropogenic hazards in the mountain are causing hazards. Integrate elements of the DEM model with component maps and different precipitation scenarios as the basis for the author to issue landslide warnings under the climate change scenario with maximum day
... Show MoreThe exploitation of all available resources and benefiting from them is one of the most important problems facing the decision makers at the present time. In order to exploit these resources, it is necessary to organize the conflicting objectives, which is the main work in the project management, which enables the development of a plan that decision makers can use to shorten the total completion time and reduce the total cost of the project. Through the use of modern scientific techniques, and therefore the researcher using the critical path method using the technology of programming goals to find more efficient ways to make appropriate decisions where the researcher worked to solve the problems in the construction of the Departm
... Show MoreMaterial Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.
The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the
... Show MoreThe researcher studied transportation problem because it's great importance in the country's economy. This paper which ware studied several ways to find a solution closely to the optimization, has applied these methods to the practical reality by taking one oil derivatives which is benzene product, where the first purpose of this study is, how we can reduce the total costs of transportation for product of petrol from warehouses in the province of Baghdad, to some stations in the Karsh district and Rusafa in the same province. Secondly, how can we address the Domandes of each station by required quantity which is depending on absorptive capacity of the warehouses (quantities supply), And through r
... Show More