The implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiveness of the results, especially with the introduction of software programs. The study concluded with a number of conclusions, including the delay of most of the projects for their specific times for several reasons, the most important of which is the lack of good planning and scheduling suitable to increase the number and variety of projects, as well as the possibility of reducing the time of completion of the project, And the most important recommendations of the research urged the departments of the municipality and government agencies and committees to prepare the drafts of guessing projects, as well as the companies and contractors, using modern methods and software in the scheduling of projects, and control the time in planning and scheduling projects to ensure that not delayed Properly on time.
The linear segment with parabolic blend (LSPB) trajectory deviates from the specified waypoints. It is restricted to that the acceleration must be sufficiently high. In this work, it is proposed to engage modified LSPB trajectory with particle swarm optimization (PSO) so as to create through points on the trajectory. The assumption of normal LSPB method that parabolic part is centered in time around waypoints is replaced by proposed coefficients for calculating the time duration of the linear part. These coefficients are functions of velocities between through points. The velocities are obtained by PSO so as to force the LSPB trajectory passing exactly through the specified path points. Also, relations for velocity correction and exact v
... Show MoreUtilizing the Turbo C programming language, the atmospheric earth model is created from sea level to 86 km. This model has been used to determine atmospheric Earth parameters in this study. Analytical derivations of these parameters are made using the balancing forces theory and the hydrostatic equation. The effects of altitude on density, pressure, temperature, gravitational acceleration, sound speed, scale height, and molecular weight are examined. The mass of the atmosphere is equal to about 50% between sea level and 5.5 km. g is equal to 9.65 m/s2 at 50 km altitude, which is 9% lower than 9.8 m/s2 at sea level. However, at 86 km altitude, g is close to 9.51 m/s2, which is close to 15% smaller than 9.8 m/s2. These resu
... Show MoreThis research deals with a unique and innovative topic, that is the study of complaint in the Quranic text. Despite its importance, it has never been studied before, because most of the complaint 's meanings in the Quranic text is: the in explicit complaint. The mentioned complaint's expressions in different contexts overlap with other purposes, in particular call method and its peripherals like mourn , ask for help , exclamation and others.
Moreover, expressions that reveal complaint are related to the complainant's emotional and psychological status, and the complaint's context.
This research deals with the topic into two sections: The first deals with the important expression of complaint such as: iff, ouah, mooing, crying. The
This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re
... Show MoreThe current research discusses “The impact of the critical factors for the transfer of knowledge on opportunities and strategic success ", the attention have been increased on knowledge transfer and strategic success subjects because on being one of the important and contemporary issues, which have a significant impact on the existence of organizations and its future. The research aims to identify the critical factors for knowledge transfer in private high education environment which enables (the college community surveyed) to achieve strategic success, also the research sought to answer questions related to research problem by testing a number of major and minor hypothes in impact, in order to test the hypotheses I used a fiel
... Show MoreSuffer most of the industrial sector companies from high Kperfi magnitude of the costs of industrial indirect, lack of equitable distribution of these costs on the objectives of cost, increased competition, and the lack of proper planning in line and changes faced by the industrial sector (general) and sample (private), as well as the difficulty in re- directing efforts to improve profitability and in-depth analysis of activities, and to identify untapped resource activities, then link these activities to the final products The research aims to apply the technology review and evaluate programs with the method (ABC) through the application stages of planning, scheduling and control and a comparison to get to the products of dev
... Show MoreThe water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not
... Show MoreThe water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met du
... Show MoreThe Research aims to investigate into reality in terms of planning and scheduling management process for sake the implementation and maintenance of irrigation and drainage projects in the Republic of Iraq, with an indication of the most important obstacles that impede the planning and scheduling management process for these projects and ways of addressing them and minimizing their effects. For the purpose of achieving the goal of the research, a sci