Preferred Language
Articles
/
jeasiq-128
Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jul 01 2017
Journal Name
2017 Computing Conference
Protecting a sensitive dataset using a time based password in big data
...Show More Authors

View Publication
Crossref (1)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu May 07 2015
Journal Name
Journal Of Infrared, Millimeter, And Terahertz Waves
Distinguishing Gasoline Engine Oils of Different Viscosities Using Terahertz Time-Domain Spectroscopy
...Show More Authors

View Publication
Scopus (28)
Crossref (25)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w</p> ... Show More
View Publication
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Mon Dec 05 2022
Journal Name
Baghdad Science Journal
K-Nearest Neighbor Method with Principal Component Analysis for Functional Nonparametric Regression
...Show More Authors

This paper proposed a new  method to study functional non-parametric regression data analysis with conditional expectation in the case that the covariates  are functional and the Principal Component Analysis was utilized to de-correlate the multivariate response variables. It  utilized the formula of the Nadaraya Watson estimator (K-Nearest Neighbour (KNN)) for prediction with different types of the semi-metrics, (which are based on Second Derivative and Functional Principal Component Analysis (FPCA))  for measureing the closeness between curves.  Root Mean Square Errors is used for the  implementation of this model which is then compared to the independent response method. R program is used for analysing data. Then, when  the cov

... Show More
View Publication Preview PDF
Scopus (4)
Crossref (2)
Scopus Crossref
Publication Date
Sat Oct 28 2023
Journal Name
Baghdad Science Journal
Diversity Operators-based Artificial Fish Swarm Algorithm to Solve Flexible Job Shop Scheduling Problem
...Show More Authors

Artificial fish swarm algorithm (AFSA) is one of the critical swarm intelligent algorithms. In this
paper, the authors decide to enhance AFSA via diversity operators (AFSA-DO). The diversity operators will
be producing more diverse solutions for AFSA to obtain reasonable resolutions. AFSA-DO has been used to
solve flexible job shop scheduling problems (FJSSP). However, the FJSSP is a significant problem in the
domain of optimization and operation research. Several research papers dealt with methods of solving this
issue, including forms of intelligence of the swarms. In this paper, a set of FJSSP target samples are tested
employing the improved algorithm to confirm its effectiveness and evaluate its ex

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (3)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Physical Mesomechanics Of Condensed Matter: Physical Principles Of Multiscale Structure Formation And The Mechanisms Of Nonlinear Behavior: Meso2022
Optimal control strategy applied to diabetes model
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Sep 30 2022
Journal Name
Journal Of The Iraqi University
Exclusion optimal portfolio from outlier by using fuzzy c-means clustering - analytical research at the Iraqi Stock Exchange
...Show More Authors

This research aims to solve the problem of selection using clustering algorithm, in this research optimal portfolio is formation using the single index model, and the real data are consisting from the stocks Iraqi Stock Exchange in the period 1/1/2007 to 31/12/2019. because the data series have missing values ,we used the two-stage missing value compensation method, the knowledge gap was inability the portfolio models to reduce The estimation error , inaccuracy of the cut-off rate and the Treynor ratio combine stocks into the portfolio that caused to decline in their performance, all these problems required employing clustering technic to data mining and regrouping it within clusters with similar characteristics to outperform the portfolio

... Show More
View Publication Preview PDF
Publication Date
Sun Feb 22 2026
Journal Name
Pakistan Journal Of Pharmaceutical Sciences
Optimization And Development Of Ondansetron HCl Nanocrystals By Using D-Optimal Design Expert® And In-Vitro Characterization
...Show More Authors

Background: Over the last few years, nanocrystal technology has expanded to improve the bioavailability of poorly water-soluble drugs, which is challenging. Nanocrystals (NCs) exhibit many properties, such as enhancing drug solubility, dissolution, oral absorption, and high drug loading. Ondansetron hydrochloride (ONH) is an antiemetic drug that antagonizes a serotonin 5-HT3 receptor in the peripheral and central nervous system and is widely prescribed for the management of chemotherapy and radiotherapy-induced vomiting and nausea, as well as for postoperative nausea. ONH exhibits approximately 60% bioavailability due to its poor solubility and first-pass metabolism in the liver. Its solubility is pH-dependent, its precipitates abov

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (2)
Scopus