Preferred Language
Articles
/
jeasiq-128
Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jul 01 2017
Journal Name
2017 Computing Conference
Protecting a sensitive dataset using a time based password in big data
...Show More Authors

View Publication
Crossref (1)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w</p> ... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu May 07 2015
Journal Name
Journal Of Infrared, Millimeter, And Terahertz Waves
Distinguishing Gasoline Engine Oils of Different Viscosities Using Terahertz Time-Domain Spectroscopy
...Show More Authors

View Publication
Scopus (28)
Crossref (24)
Scopus Clarivate Crossref
Publication Date
Sun Sep 05 2021
Journal Name
Journal Of Arab Statistical Union (jasu)
Using Quality Control and 6-Sigma to Determine The Quality of The Treated Wastewater Discharged From Some Water Purification Plants
...Show More Authors

Publication Date
Mon Jul 01 2019
Journal Name
Journal Of Engineering
Development of Bridges Maintenance Management System based on Geographic Information System Techniques (Case study: AlMuthanna \ Iraq)
...Show More Authors

A Geographic Information System (GIS) is a computerized database management system for accumulating, storage, retrieval, analysis, and display spatial data. In general, GIS contains two broad categories of information, geo-referenced spatial data and attribute data. Geo-referenced spatial data define objects that have an orientation and relationship in two or three-dimensional space, while attribute data is qualitative data that can be counted for recording and analysis. The main aim of this research is to reveal the role of GIS technology in the enhancement of bridge maintenance management system components such as the output results, and make it more interpretable through dynamic colour coding and more sophisticated vi

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Physical Mesomechanics Of Condensed Matter: Physical Principles Of Multiscale Structure Formation And The Mechanisms Of Nonlinear Behavior: Meso2022
Optimal control strategy applied to diabetes model
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Improving Nursing process Performance based on service scheduling dimensions. ( Field research)
...Show More Authors

Abstract :

This present paper sheds the light on dimensions of scheduling the service that includes( the easiness of performing the service, willingness , health factors, psychological sides, family matters ,diminishing the time of waiting that improve  performance of nursing process including ( the willingness of performance, the ability to perform  the performance , opportunity of performance) . There is genuine problem in the Iraqi hospitals  lying into the weakness of nursing staffs , no central decision to define and organize schedules. Thus the researcher has chosen  this problem as to be his  title . The research come a to develop  the nursing service

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Sep 30 2022
Journal Name
Journal Of The Iraqi University
Exclusion optimal portfolio from outlier by using fuzzy c-means clustering - analytical research at the Iraqi Stock Exchange
...Show More Authors

This research aims to solve the problem of selection using clustering algorithm, in this research optimal portfolio is formation using the single index model, and the real data are consisting from the stocks Iraqi Stock Exchange in the period 1/1/2007 to 31/12/2019. because the data series have missing values ,we used the two-stage missing value compensation method, the knowledge gap was inability the portfolio models to reduce The estimation error , inaccuracy of the cut-off rate and the Treynor ratio combine stocks into the portfolio that caused to decline in their performance, all these problems required employing clustering technic to data mining and regrouping it within clusters with similar characteristics to outperform the portfolio

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Arabian Journal Of Geosciences
Effect of well scheduling and pattern on project development management in unconventional tight gas reservoirs
...Show More Authors

The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number

... Show More
View Publication
Crossref (2)
Crossref