Knowledge represents the foundation stone for the work of all organizations, are working who leads the thinking of individuals is the ability that leads to behavior based on rationality, it is the work that creates value to the organization and thus gain access to performance winning where that knowledge is a new type of capital based on the thought and experience and is the so-called intellectual capital, which is renewable and is constantly evolving. The study sought to explain the role of the climax knowledge in achieving the highest levels of performance Organizational and then access to the performance winning in educational organizations the study sample, was found to be a correlation between the climax knowledge cognitive and performance winning ,Valdhirop knowledge significant effect on performance dimensions winning .
Background: Atrophic postoperative and traumatic scarring are common cosmetic problems for patients. Combining CO2 laser ablation with a fractional photothermolysis system in a treatment known as ablative fractional resurfacing fulfilling the new demands for a lesser risk of side effects and minimal or no downtime.Objective: To assess the safety and efficacy of ablation fractional CO2 laser treatments for surgical scarring .methods: Twenty one patient ( 14 women, and 7 men ) with various skin types , I to IV , aged 3 to 48 years , presents with 24 scars between June and December 2012 , four patients excluded from study because they are not continued in follow up , the remaining 17 patient completed all 3 treatments & 6 months follow
... Show MoreThis study is concerned with the effect of Deep Cryogenic Treatment (DCT) at liquid nitrogen temperature (-196 o C) on the mechanical properties and performance of low carbon steel (A858). The tests specimens were divided in to two groups, the first group was subjected to the conventional heat treatment of normalizing, and the second group was also normalized then subjected to (DCT). The results have shown that after (DCT), the Hardness, Tensile properties and the impact energy absorbed were all slightly increased. However the fatigue test showed some positive improvement in fatigue limit by 20(N/mm2 ), and the volume wear rates at different loads were significantly decreased after (DCT). The changes in microstructure due to (DCT) were c
... Show MoreThis study evaluates 22 patients with retained foreign bodies in the maxillofacial region that were all caused by penetrating missile injuries. Surgical intervention for the retrieval of the foreign bodies was carried out in 20 patients through the existing wounds and through separate incisions; all patients were followed up for a minimum of 2 months during which all the complications were registered and managed. Preoperative imaging is a prerequisite for the accurate localization of the foreign body and the subsequent successful removal of it. All patients developed complications that were categorized in this study into those that result from the injury itself and those that occur because of the retrieval procedure, the latter category bei
... Show MoreThe photonconductor detectors CdSe:Cu was fabricated as a thin film of (1 μm) in thickness using vacuum evaporation technique. doping with copper was made using vacuum annealing at 350oC under argon atmosphere . The spectral responsivity and spectral detectivity of the detector were determined as a function of incident wavelength on the sample. A remarkable improvement in performance was absorbed for the specimen, which doping with (1-5 wt%) Cu.
The spectral response increases with increasing of wavelength for incident radiation to maximum value, after that , it reduced sharply . There is a shifting for peak responsivity indirect of higher wavelength. The detectivity was increased with doping but its decreased as the concentration in
Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected