This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t
... Show MoreThe research deals with the concept of stigma as one of the important phenomena that cast a shadow over the nature of the individual, his being and his personality through the inferior view with which he confronts in society, and (Sartors) indicates in this regard that stigma may lead to negative discrimination that leads to many defects, in terms of obtaining On care, poor health, service, and frequent setbacks that can damage self-esteem. The first roots of this phenomenon go back to the Greek civilization and what the Greeks used to burn and cut off some parts of the body and then announce to the nation that the bearer of this sign is a criminal. In addition to the Arab peoples living from setbacks that contributed to the exacerbation
... Show MoreThe Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
This article focuses on identity construction and social structures within the Sāmoan community as represented in Sia Figiel’s novel Where We Once Belonged. I argue that however the post/colonial Sāmoan identity is hybridized, the essence of the individual is still connected to Fa’a Sāmoa-the Sāmoan traditions and ways. However rapid are the colonial vicissitudes, the Sāmoan literature and lifestyle are developed to be a resistance platform. This resistance platform is dedicated not only to expose the colonial impact but also to assist the social and political reconstruction of post/colonial Samoa. To this end, this article studies identity construction, and the challenges that women face within Sāmoan social structures.
The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreThe entrance process re-engineering one of the main entrances of administrative and technology appropriate to keep pace with scientific progress and the continuing changes in business environment and for the purpose of achieving the goal sought by the organizations in the pursuit of rapid developments and renewable energy in the market competition by changing its operations and activities of the radical change which contributes to an effective contribution to reducing the cost of product or service taking into account the quality improvement in the management of change to keep the increase value and speed of placing on the market to meet customer needs and desires to achieve a
... Show Moreتعد صناعة السمنت في العراق من اقدم الصناعات الحديثة واكثرها تطورا وتقدما ومن اقواها تاثيرا في الاقتصاد القومي. واذ توفر في صناعة السمنت العراقي كافة المستلزمات الناجحة من حيث توفر المواد الاولية والخبرات الفنية والتقنية واسواق ثابتة وراسخة محليا وعالميا فقد كان من المفروض ان يتم التوسع في هذه الصناعة، وان التخطيط لهذه الصناعة امرا ضروريا خاصة وان مادة السمنت هي احدى اهم المواد الرئيسة التي يؤثر توفره
... Show MoreThe problem of generated waste as a result of the implementation of construction projects, has been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom
... Show More