The basis of the personality of each individual lies in the early years of his or her life. If the personality of the child has been well organized and if the motives have been fully expressed and effectively directed, the child will have a strong will, happy self-confidence and a strong personality. If there is a failure In the early years, the individual will be unable to meet his responsibilities in life and may be the victim of many psychological disorders. The family is a learning process through which children acquire the customs, traditions, attitudes and values prevailing in their social environment. (Pre-and-after) play and its relationship to parenting methods of (democratic-bullying-overprotection- and neglect), which will be addressed in the current study as to their effective role in raising or The study aims to measure self-confidence in pre-school children (before-and-after) play, to identify parenting methods by parents and kindergarten children by sex, and to reveal the correlation Between S And the level of self-confidence (before, during and after) play with kindergartens
The polymer was used to inhibit the corrosion of copper metal in salt media in di erent concentrations at room temperature using potentiometric polarization measurement. The polymer was prepared by mixing (0.1 M) 4-Hydroxy aniline (C6H7NO) with (0.25M) of ammonium persulfate as the initiator using the electro-deposition technique. The polymer’s results showed that copper in (3.5%) NaCl had good corrosion resistance. The ndings demonstrate that the %IE for polymer-induced copper corrosion is 89.32% at 10 ppm concentration as a result of the 4-hydroxy aniline polymer’s adsorption from salt solution on the surface of copper metal. The numbers from the polarization method and the acquired standard data agree well. The coated copper by poly
... Show MoreEco-friendly concrete is produced using the waste of many industries. It reduces the fears concerning energy utilization, raw materials, and mass-produced cost of common concrete. Several stress-strain models documented in the literature can be utilized to estimate the ultimate strength of concrete components reinforced with fibers. Unfortunately, there is a lack of data on how non-metallic fibers, such as polypropylene (PP), affect the properties of concrete, especially eco-friendly concrete. This study presents a novel approach to modeling the stress-strain behavior of eco-friendly polypropylene fiber-reinforced concrete (PFRC) using meta-heuristic particle swarm optimization (PSO) employing 26 PFRC various mixtures. The cement was partia
... Show MoreThe effect of molecules intersystem crossing (Kisc) on characteristics
(energy and duration) of a Passive Q- switched Laser Pulse has been
studied by mathematical description (rate equations model) for
temporal performance of which was used as a saturable absorber
material (passive switch) with laser. The study shows that the energy
and duration pulse are decreasing while the molecules intersystem
crossing into saturable absorber energy levels is increasing.
Cr2O3 thin films have been prepared by spray pyrolysis on a glass substrate. Absorbance and transmittance spectra were recorded in the wavelength range (300-900) nm before and after annealing. The effects of annealing temperature on absorption coefficient, refractive index, extinction coefficient, real and imaginary parts of dielectric constant and optical conductivity were expected. It was found that all these parameters increase as the annealing temperature increased to 550°C.
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More