Background: Porcelain veneers are under a great deal of stress which may lead to clinical failure as fracture or dettachment. This study examined whether different finishing lines and lingual shoulder preparations in the incisal area of the maxillary central incisor affect the bond of the porcelain veneers. Materials and methods: A two- dimensional finite element model was made. Location and magnitude of maximum Von Mises stresses were calculated in porcelain veneer. Six types of preparations were drawn as:incisal overlap of 0.5mm, 1mm and 1.5mm depth and lingual shoulder, and incisal overlap of 0.5mm, 1mm and 1.5mm depth without shoulder preparation. Results: Stress formation is maximum in the incisal edge region. All the lingual shoulder preparations presented better stress distribution than the non shoulder preparations Conclusion: Stress is distributed more evenly when the tested preparation possesses a good thickness of porcelain and the more the surface area with incisal overlap the less possibility of bond failure.
In the case where a shallow foundation does not satisfy with design requirements alone, the addition of a pile may be suitable to improve the performance of the foundation design. The lack of in-situ data and the complexity of the issues caused by lagging in the research area of pile foundations are notable. In this study, different types of piles were used under the same geometric conditions to determine the load-settlement relationships with various sandy soil relative densities. The ultimate pile capacity for each selected pile is obtained from a modified California Bearing Ratio (CBR) machine to be suitable for axial pile loading. Based on the results, the values of Qu for close-ended square pile were increased by 15
... Show MoreWaste materials might be utilized in various applications, such as sustainable roller compacted concrete pavements (RCCP), to lessen the negative environmental consequences of construction waste. The impacts of utilizing (brick, thermostone, granite, and ceramic) powders on the mechanical characteristics of RCCP are investigated in this study. To achieve this, the waste materials were crushed, grounded, and blended before being utilized as filler in the RCCP. After the mixes were prepared, compressive strength, splitting tensile strength, flexural strength, water absorption, density, and porosity were all determined. According to the research results, adding some of these powders, mainly brick and granite powder, enhances the mechanical
... Show MoreIn this study, a simulation model inside a channel of rectangular section with high of (0.16 m) containing two rectangular obstruction plates were aligned variable heights normal to the direction of flow, use six model of the obstructions height of (0.059, 0.066, 0.073, 0.08 and 0.087 m) were compared with the flow behavior of the same duct without obstructions. To predict the velocity profile, pressure distribution, pressure coefficient and turbulence kinetic energy flow of air, the differential equations which describe the flow were approximated by the finite volumes method for two dimensional, by using commercial software package (FLUENT) with standard of k-ε model two dimensions turbulence flow.
... Show MoreIn this study, 191 specimens of insects that infect species of the Fabaceae family, including:
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
Buckling and free vibration analysis of laminated rectangular plates with uniform and non uniform distributed in-plane compressive loadings along two opposite edges is performed using the Ritz method. Classical laminated plate theory is adopted. The static component of the applied in- plane loading are assumed to vary according to uniform, parabolic or linear distributions. Initially, the plate membrane problem is solved using the Ritz method; subsequently, using Hamilton’s variational principle, linear homogeneous algebraic equations in terms of unknown are generated, the set of linear algebraic equations can be solved as an Eigen-value problem. Buckling loads for laminated plates with different combinations of bounda
... Show MoreThe expansion in water projects implementations in Turkey and Syria becomes of great concern to the workers in the field of water resources management in Iraq. Such expansion with the absence of bi-lateral agreement between the three riparian countries of Tigris and Euphrates Rivers; Turkey, Syria and Iraq, is expected to lead to a substantially reduction of water inflow to the territories of Iraq. Accordingly, this study consists of two parts: first part is aiming to study the changes of the water inflow to the territory of Iraq, at Turkey and Syria borders, from 1953 to 2009; the results indicated that the annual mean inflow in Tigris River was decreased from 677 m3/sec to 526 m3/sec, after operating Turkey reserv
... Show More
