A novel demountable shear connector is proposed to link a concrete slab to steel sections in a way that resulting steel-concrete composite floor is demountable, i.e. it can be easily dismantled at the end of its service life. The proposed connectors consist of two parts: the first part is a hollow steel tube with internal threads at its lower end. The second part is a compatible partially threaded bolted stud. After linking the stud to the steel section, the hollow steel tube can be fastened over the threaded stud, which create a complete demountable shear connector. The connector is suitable for use in both composite bridges and buildings, and using cast in-situ slabs, precast solid slabs, or hollow-core precast slabs. A series of push-off tests with different parameters including wall thickness of steel tube, compressive strength of concrete slab and infilled grout were carried out to study shear strength, shear stiffness, failure modes and relative slip characteristics of demountable shear connectors. Experimental results indicated that the shear connector has a high strength and initial stiffness, also the slip capacity that is higher than the requirements of the current codes of practice. Finally, it is suggested that under applied loading, concrete slabs do not crack or crush, demountable connectors can yield into plastic state, therefore, concrete slabs and steel beams can be easily replaced, repaired or reused.
Praise be to God, Lord of the worlds, and prayers and peace be upon our master and beloved Muhammad, the wise guide and great teacher, the guide to a straight path, the one sent as a mercy to the worlds, and upon his good and chosen family, his chosen companions, the working scholars, and those who follow them in righteousness until the Day of Judgment.
And after:
One of the important controversial topics shared between the sciences of the Noble Hadith and the Fundamentals of God is the issue of the innovator in terms of accepting and rejecting his narration and testimony, and the difference in it leads to disagreement in many branches of jurisprudence that were based on texts narrated by innovated narrators or those accu
... Show MoreBackground: The bond strength of root canal sealers to dentin and gutta-percha seems to be an important property for maintaining the stability of root canal filling, which potentially influences both leakage and root strength. The objective of this, in vitro, study was to evaluate the shear bond strength of three different endodontic sealers (Gutta-Flow, AH Plus, Apexit Plus) to dentin, in the presence and absence of the smear layer and gutta percha. Material and Methods: After slicing off the occlusal 2mm of 60 extracted human maxillary premolar teeth, the exposed dentin served as the tested surfaces; the teeth were fixed with cold cure acrylic, and were divided into two groups according to the smear layer presence, group A without smear
... Show MoreThis paper aims to explain the effect of workplace respect on employee performance at Abu Ghraib Dairy Factory (AGDF). For achieving the research aim, the analytical and descriptive approach was chosen using a questionnaire tool for collecting data. It covers 22 items; ten of them for the workplace respect variable and twelve items for the employee performance variable. The research population involved human resources who work at AGDF in Baghdad within two administrative levels (top and middle). We conducted a purposive stratified sample approach. It was distributed 70 questionnaire forms, and 65 forms were received. However, six of them had missing data and did not include in the final data analysis. The main results are t
... Show MoreThe construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.
The question is, was the optimum implementation accomplished? The provision for the success of the project
... Show MoreThe increase in population resulted in an increase in the consumption of water. The present work investigates the performance of a recycling solar- powered greywater treatment system for the purposes of irrigation, used to reduce the amount of waste grey water and reduce electricity consumption and reduce the costs of constructing large scale water treatment plants. The system consumes about 3814W per hour and provides water treatment about 1.4 m3 per day. The proposed system is designed to residential, office and governmental buildings application. Tests are conducted in an office building at the Ministry of Science and Technology site in Baghdad. Laboratorial water samples testing analyses are co
... Show MoreThis study presented an endeavour to integrate the value chain activities with the Balanced Scorecard for a comprehensive evaluation of an organization’s strategic performance. It also demonstrated the connection and the integration of the activities of the value chain with the Balanced Scorecard. The financial measurement was linked with non-financial measurement by integrating these techniques to achieve an appropriate performance that supports all aspects of the organizational performance. Consequently, the research problem in this study emerged, which is due to the concentration of many organizations on the measurement of financial performance. Notably, the latter caused the decline of some organizations from the competitive market. T
... Show More