In any natural area or water body, evapotranspiration is one of the important outcomes in the water balance equation. As a significant method and depending on monthly average temperature, estimating of potential Evapotranspiration depending on Thornthwaite method was adopted in this research review. Estimate and discuss evapotranspiration by using Thornthwaite method is the main objectives of this research review with considerable details as well as compute potential evapotranspiration based on climatologically data obtained in Iraq. Temperature - evapotranspiration relationship can be estimated between those two parameters to reduce cost and time and facilitate calculation of water balance in lakes, river, and hydrogeological basins. The relationship was obtained using Thornthwaite method in Iraq by dividing the area into seven sectors according to geographic latitude. Each sector has multi meteorological stations where thirty two stations were used with different periods of records. A mathematical relationship was obtained between mean temperature and corrected potential evapotranspiration with (97.45) to (99.84) coefficient of determination. The mean temperature has a decreasing pattern from southern east towards northern west of Iraq affected by Mediterranean Sea climate conditions, while corrected potential evapotranspiration has the opposite direction regarding increased value because of a direct relationship with temperature.
There are many images you need to large Khneh space With the continued evolution of storage technology for computers, there is a continuing need and are required to reduce Alkhoznip space Pictures Zguet pictures in a good way, the way conversion Alamueja to Purifiers
In this paper, the Adomian decomposition method (ADM) is successfully applied to find the approximate solutions for the system of fuzzy Fredholm integral equations (SFFIEs) and we also study the convergence of the technique. A consistent way to reduce the size of the computation is given to reach the exact solution. One of the best methods adopted to determine the behavior of the approximate solutions. Finally, the problems that have been addressed confirm the validity of the method applied in this research using a comparison by combining numerical methods such as the Trapezoidal rule and Simpson rule with ADM.
Gravity and magnetic data are used to study the tectonic situation of Kut- Dewania- Fajir and surrounding areas in central Iraq. The study includes the using of window method with different spacing to separate the residual from regional anomalies of gravity and magnetic data. The Total Horizontal Derivative (THD) techniques used to identify the fault trends in the basement and sedimentary rocks depending upon gravity and magnetic data. The obtained faults trends from gravity data are (N30W), (N60W) (N80E) and (N20E) and from magnetic data are (N30W), (N70E), (N20E),(N10W),(N40E). It is believed that these faults extend from the basement to the lower layers of the sedimentary rocks except the N60W trend that observed clearly in gravity in
... Show MoreHydromorphometric analysis as a method is considered one of the most reliable and used methods in solving hydrological problems. Where it is possible to know the volume of runoff and the rest of the elements that enter into the water balance. Geographical Information System and Remote Sensing is the technique that used the hydro-morphometric analysis of the Wadi Al-Mohammadi basin. Wadi Al-Mohammadi, located in the Western Desert, is one of the main valleys that flow into the Euphrates River. It is considered an important basin, because of its many characteristics, including its relatively large area and the amount of water drained through, which is used mainly in watering livestock and agriculture, in addition to industrial purposes suc
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
This study aimed at some of the criteria used to determine the form of the river basins, and exposed the need to modify some of its limitations. In which, the generalization of the elongation and roundness ratio coefficient criterion was modified, which was set in a range between (0-1). This range goes beyond determining the form of the basin, which gives it an elongated or rounded feature, and the ratio has been modified by making it more detailed and accurate in giving the basin a specific form, not only a general characteristic. So, we reached a standard for each of the basins' forms regarding the results of the elongation and circularity ratios. Thus, circular is (1-0.8), and square is (between 0.8-0.6), the blade or oval form is (0.6-0
... Show MoreIn this research, electron coefficients such as total collision frequency (colt/N), total ionization frequency (viz/N), and Power (P/N) for different gases such as (Ar, He, N2 and O2 (in Earth’s ionosphere have been calculated by applying the Boltzmann equation utilizing BOLSIG +, and it has been discovered that there is a significant impact of reducing the electric field (E/N) on electronic coefficients under which (E/N) increases. In addition, influence of (E/N) on electronic coefficients was studied. Reducing the electric field was chosen in the restricted range (1-100) Td, and the electronic coefficients for gases in the limited range (50-2000) km of the Earth's ionosphere. A positive correlation has been explained between all the
... Show MoreLost circulation or losses in drilling fluid is one of the most important problems in the oil and gas industry, and it appeared at the beginning of this industry, which caused many problems during the drilling process, which may lead to closing the well and stopping the drilling process. The drilling muds are relatively expensive, especially the muds that contain oil-based mud or that contain special additives, so it is not economically beneficial to waste and lose these muds. The treatment of drilling fluid losses is also somewhat expensive as a result of the wasted time that it caused, as well as the high cost of materials used in the treatment such as heavy materials, cement, and others. The best way to deal with drilling fluid losses
... Show More