Wind farm assessment project have several steps. This paper aim on the second step which is harvesting the roads properties from the loading point to the construction point. The difficulties of examining the roads whether they are appropriate or not for transporting wind turbine components. The selected site for establishing wind farm is located at Maysan province and has 262 km distance from Um – Qaser port. The results through applying remote sensing and GIS techniques on Landsat (30 m resolution) and QuckBird (0.6 m resolution) are summarized by (2 hard turn, 18 Bridges that crossing over, and 13 Bridges passing under).
One of the most significant environmental issues facing the planet today is air pollution. Due to development in industry and population density, air pollution has lately gotten worse. Like many developing nations, Iraq suffers from air pollution, particularly in its urban areas with heavy industry. Our research was carried out in Baghdad's Al-Nahrawan neighbourhood. Recently, ground surveys and remote sensing were used to study the monitoring of air pollution. In order to extract different gaseous and particle data, Earth Data source, Google Earth Engine (GEE), and Geographic Information Systems (GIS) software were all employed. The findings demonstrated that there is a significant positive connection between data collected by ground-ba
... Show More