The seismic method depends on the nature of the reflected waves from the interfaces between layers, which in turn depends on the density and velocity of the layer, and this is called acoustic impedance. The seismic sections of the East Abu-Amoud field that is located in Missan Province, south-eastern Iraq, were studied and interpreted for updating the structural picture of the major Mishrif Formation for the reservoir in the field. The Mishrif Formation is rich in petroleum in this area, with an area covering about 820 km2. The horizon was calibrated and defined on the seismic section with well logs data (well tops, check shot, sonic logs, and density logs) in the interpretation process to identify the upper and lower boundaries of the Formation. Seismic attributes were used to study the formation, including instantaneous phase attributes and relative acoustic impedance on time slice of 3D seismic data . Also, relative acoustic impedance was utilized to study the top of the Mishrif Formation. Based on these seismic attributes, karst features of the formation were identified. In addition, the nature of the lithology in the study area and the change in porosity were determined through the relative acoustic impedance The overlap of the top of the Mishrif Formation with the bottom of the Khasib Formation was determined because the Mishrif Formation is considered as an unconformity surface.
The Tel Hajar formation in the studied area has been divided into five microfacics units:
1) Fine hiogenic dolomite facies.
2) Sandy rich dolomite facies.
3) Dolomite diagenetic facies.
4) Recrystal1ized wackestone in microfacies.
5) Mudsione facies.
Microfacics reflect shallow marine water with open Circulation in the lower part of the formation and the environment of the upper is enclosed between upper tide and tide. The most important diagenesis was recrystallization and spary calcite deposit inside fossils chambers and pores.
This research focused up on the Seismic reflection study of a 268.7 km2 area located in the central of Iraq within the Karbala province (Kifl area). The seismic data were reprocessed by Anadarko Petroleum Corporation and its partners Dome International and Vitol with OEC in 2005, the result of processing works has improved the quality of seismic sections in most of the study area. The study area was interpreted by using 3-D seismic data from the Oil Exploration Company. By studying the seismic sections and applying seismic attributes (instantaneous phase) Faults were picked across 3D seismic volume of the studied reflectors. The study area affected by a major fault and minor normal faults, Two fa
... Show MoreThis research aims to study the structural analysis of the 2D reflection seismic data for the Judaida subsurface structure located in Kirkuk province, northern Iraq. It is located 60 Km southwest of Kirkuk oil field, and 35 Km southwest of Jambur oil field, the Daquq River passes through the study area. The reflectors in the seismic section were picked and identified by using the synthetic seismograms generated from the logs data of the Jd-1 well. Three main seismic reflectors, Fatha, Jeribe, and the Euphrates were chosen. These mentioned sedimentary formations were deposited during the Middle Miocene, Lower Miocene, and Early-Mid Miocene respectively. Time and depth maps were drawn for these three reflectors by processing average data f
... Show More3D geological model for each reservoir unit comprising the Yamama Formation revealed to that the formation is composed of alternating reservoirs and barriers. In Subba and Luhais fields the formation began with barrier YB-1 and four more barriers (YB-2, YB-3, YB-4, YB-5), separated five reservoirs (YR-A, YR-B, YR-C, YR-D, YR-E) ranging in thickness from 70 to 80 m for each of them deposited by five sedimentary cycles. In the Ratawi field the formation was divided into three reservoir units (YR-A, YR-B, and YR-C) separated by two barrier units (YB-2 and YB-3), the first cycle is missing in Ratawi field.
The study involves 1 well in Luhais field (Lu-12), 3 wells in Subba field (Su-7, Su-8, and Su-9), and 5 wells in Ratawi fi
... Show MoreThe objective of this research is to select the most suitable drilling location of new groundwater exploration wells, with a decision-making tool from Geographic Information System (GIS). The optimum location will be evaluated base on the hydro-geoelectrical parameter derived from Vertical Electrical Sound (VES) including Longitudinal Conductance, the thickness of the aquifer, the apparent resistivity and Transmissivity. From the Geo-electrical method (VES) the finds shows that the aquifers in the study area have Apparent Resistivity ranging from 0.32 to 40.24 Ωm, Thickness between 0.21 m to 15.06 m, Longitudinal Conductance ranging from 0.006 to 10.246Ω-1 and Transmissivity ranging from 0.14 to
... Show MoreThis study aims at making formation evaluation for Mishrif Formation in three wells within Noor Oilfield which are: No-1, No-2 and No-5. The study includes calculations of shale volume and porosity, water saturation using Archie method, measuring the bulk volume of water (BVW) and using Buckle plot, as well as measuring the movable and residual hydrocarbons. These calculations were carried out using Interactive Petrophysics (IP) version 3.5 software as well as using Petrel 2009 software for structural map construction and correlation purposes. It was found that the Mishrif Formation in Noor Oilfield is not at irreducible water saturation, though it is of good reservoir characteristics and hydrocarbon production especially at the upper pa
... Show MoreThe reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of rese
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show More