The main goal of this paper is to make link between the subjects of projective
geometry, vector space and linear codes. The properties of codes and some examples
are shown. Furthermore, we will give some information about the geometrical
structure of the arcs. All these arcs are give rise to an error-correcting code that
corrects the maximum possible number of errors for its length.
Machine scheduling problems (MSP) are considered as one of the most important classes of combinatorial optimization problems. In this paper, the problem of job scheduling on a single machine is studied to minimize the multiobjective and multiobjective objective function. This objective function is: total completion time, total lead time and maximum tardiness time, respectively, which are formulated as are formulated. In this study, a mathematical model is created to solve the research problem. This problem can be divided into several sub-problems and simple algorithms have been found to find the solutions to these sub-problems and compare them with efficient solutions. For this problem, some rules that provide efficient solutio
... Show MorePredicting the maximum temperature is of great importance because it is related to various aspects of life, starting from people’s lives and their comfort, passing through the medical, industrial, agricultural and commercial fields, as well as concerning global warming and what can result from it. Thus, the historical observations of maximum and minimum air temperature, wind speed and relative humidity were analyzed in this work. In Baghdad, the climatic variables were recorded on clear sky days dawn at 0300 GMT for the period between (2005-2020). Using weather station's variables multiple linear regression equation, their correlation coefficients were calculated to predict the daily maximum air temperature for any day during
... Show MoreWithin this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic
... Show MoreThe aim of this research is to use robust technique by trimming, as the analysis of maximum likelihood (ML) often fails in the case of outliers in the studied phenomenon. Where the (MLE) will lose its advantages because of the bad influence caused by the Outliers. In order to address this problem, new statistical methods have been developed so as not to be affected by the outliers. These methods have robustness or resistance. Therefore, maximum trimmed likelihood: (MTL) is a good alternative to achieve more results. Acceptability and analogies, but weights can be used to increase the efficiency of the resulting capacities and to increase the strength of the estimate using the maximum weighted trimmed likelihood (MWTL). In order to perform t
... Show MoreThe job that confronts players with the effectiveness of shooting with an air rifle is high, so it requires necessary functional adaptations that differ in their degrees from other sports. Regular training in air rifle shooting leads to physiological changes in most of the body's internal systems, and changes and responses can be identified. The functional accompanying physical activity through the presence of body components that reflect these physiological changes in the form of changes in some components, and the importance of research lies in studying the physiological changes accompanying the maximum physical effort and the consequent development of the level of achievement in the effectiveness of shooting with air rifle and body
... Show MoreThe presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two
... Show MoreThe Indonesian language is used as a means of communication, including written communication. Unfortunately, many mistakes are found in Indonesian language writing, such as the writing of active verbs with the prefix mem- followed by the letter P. This problem can be addressed with the spell-checking method. Spell checking is a process in computer programs to check the spelling of each word in electronic text or documents in the correct order. To better the active verb this study used the Jaro-Winkler Distance algorithm. Meanwhile, for system development, the Iterative Waterfall method was used. The system output is active verbs of mem- + P which is standardized according to the Great Dictionary of the In
... Show MoreIn this work, the relationship between the ionospheric parameters (Maximum Usable Frequency (MUF), Lowest Usable Frequency (LUF) and Optimum working Frequency (OWF)) has been studied for the ionosphere layer over the Iraqi zone. The capital Baghdad (44.42oE, 33.32oN) has been selected to represent the transmitter station and many other cities that spread over Iraqi region have represented as receiver stations. The REC533 communication model considered as one of the modern radio broadcasting version of ITU has been used to calculate the LUF parameter, while the MUF and OWF ionospheric parameters have been generated using ASAPS international communication model which represents one of the most advanced and accurate HF sky wave prop
... Show MoreA (k,n)-arc A in a finite projective plane PG(2,q) over Galois field GF(q), q=p⿠for same prime number p and some integer n≥2, is a set of k points, no n+1 of which are collinear. A (k,n)-arc is complete if it is not contained in a(k+1,n)-arc. In this paper, the maximum complete (k,n)-arcs, n=2,3 in PG(2,4) can be constructed from the equation of the conic.