Near-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot
In this research a study process to calculate the factor accumulation of gamma rays for aluminum and exporters cobalt 60 Mika Atktron volts and actively radiation Vdrh 1.406 Mika Bq been studying the effect of the angle of reimbursement and the distance between the shield and detector In measurements factor accumulation Adhrt results in line with the theoretical results published
The present work aims to investigate approaches, measures and detection of indoor radon level in buildings of the department of physics in college of science of Baghdad University. CR-39 solid state nuclear track detectors were used to measure the radon concentrations inside the rooms, including five laboratories and five workplace rooms in ground and first storey of the department. The average radon concentration at first storey was found to be 43.1±13.2 Bq/m3 and 40.1±13.4 Bq/m3 at the ground storey. The highest level of radon concentration at the first storey in the radioactive sources store was 87.5±29 Bq/m3 while at the ground storey in room(2) was 70.2±24 Bq/m3 which is due to the existence radioactive sources in some selected
... Show MoreObjective : To study the effect of some risk factors like age, smoking and Diabetes mellitus (DM) among patients with
certain cardiovascular diseases (Angina pectoris and Myocardial infarction), in addition to the assessment of the Creactive
protein (CRP) in the sera of those patients.
Methodology: The study was carried out on (100) subjects who were hospitalized in the Iraqi Center of heart Diseases
in Baghdad city and were suffering from Myocardial InfarcƟon (MI) (16) and Angina Pectoris (AP) (79) or from both (5)
over a period from September 2009 to June 2010. The results of paƟents were compared with those of (30) healthy
and age-matched individuals as a control group. Data were obtained from patients who were alr
Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreThe spread of novel coronavirus disease (COVID-19) has resulted in chaos around the globe. The infected cases are still increasing, with many countries still showing a trend of growing daily cases. To forecast the trend of active cases, a mathematical model, namely the SIR model was used, to visualize the spread of COVID-19. For this article, the forecast of the spread of the virus in Malaysia has been made, assuming that all Malaysian will eventually be susceptible. With no vaccine and antiviral drug currently developed, the visualization of how the peak of infection (namely flattening the curve) can be reduced to minimize the effect of COVID-19 disease. For Malaysians, let’s ensure to follow the rules and obey the SOP to lower the