DEMs, thus, simply regular grids of elevation measurements over the land surface.The aim of the present work is to produce high resolution DEM for certain investigated region (i.e. Baghdad University Campus\ college of science). The easting and northing of 90 locations, including the ground-base and buildings of the studied area, have been obtained by field survey using global positioning system (GPS). The image of the investigated area has been extracted from Quick-Bird satellite sensor (with spatial resolution of 0.6 m). It has been geo-referenced and rectified using 1st order polynomial transformation. many interpolation methods have been used to estimate the elevation such as ordinary Kriging, inverse distance weighted (IDW) and natural neighbor methods. The mosaic algorithm has then been applied between the base and building layers of studied area in order to perform the final DEM. The accuracy assessments of the interpolation methods have been calculated using the root-mean-square-error (RMSE) criterion. Finally, the estimated DEMs have been used to constructing 3-D views of the original image.
The hydraulic conditions of a flow previously proved to be changed when placing large-scale geometric roughness elements on the bed of an open channel. These elements impose more resistance to the flow. The geometry of the roughness elements, the numbers used, and the configuration are parameters that can affect the hydraulic flow characteristics. The target is to use inclined block elements to control the salt wedge propagation pointed in most estuaries to prevent its negative effects. The Computational Fluid Dynamics CFD Software was used to simulate the two-phase flow in an estuary model. In this model, the used block elements are 2 cm by 3 cm cross-sections with an inclined face in the flow direction, with a length
... Show MoreThe study aims to identify the effect of training with weight added to different parts of the body in improving the biomechanical variables of the last step and upgrading the high jump for young people, the research was applied to one of the elite high jumpers for young people, and video imaging and kinetic analysis were conducted to extract the variables under study, and then the jumper underwent For the proposed exercises by 3 training units per week for a period of (8) weeks, in which emphasis was placed on improving the rotational forces (moments) of these parts, and then the post-tests were conducted, and the researcher concluded that the exercises applied and the added weights for all parts of the body (leg, thigh, trunk, and arms) le
... Show MoreIn this work, radius of shock wave of plasma plume (R) and speed of plasma (U) have been calculated theoretically using Matlab program.
Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
It is considered as one of the statistical methods used to describe and estimate the relationship between randomness (Y) and explanatory variables (X). The second is the homogeneity of the variance, in which the dependent variable is a binary response takes two values (One when a specific event occurred and zero when that event did not happen) such as (injured and uninjured, married and unmarried) and that a large number of explanatory variables led to the emergence of the problem of linear multiplicity that makes the estimates inaccurate, and the method of greatest possibility and the method of declination of the letter was used in estimating A double-response logistic regression model by adopting the Jackna
... Show More
It is considered as one of the statistical methods used to describe and estimate the relationship between randomness (Y) and explanatory variables (X). The second is the homogeneity of the variance, in which the dependent variable is a binary response takes two values (One when a specific event occurred and zero when that event did not happen) such as (injured and uninjured, married and unmarried) and that a large number of explanatory variables led to the emergence of the problem of linear multiplicity that makes the estimates inaccurate, and the method of greatest possibility and the method of declination of the letter was used in estimating A double-response logistic regression model by adopting the Jackna
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More