A cut-off low is a closed low with a low value of geopotential height at the upper atmospheric levels that has been fully detached (cut-off) from the westerly flow and move independently. A cut-off low causes extreme rainfall events in the mid-latitudes regions. The main aim of this paper is to investigate the cut-off low at 500 hPa over Iraq from a synoptic point of view and the behavior of geopotential height at 500 hPa. To examine the association of the cut-off low at 500 hPa with rainfall events across Iraq, two case studies of heavy rainfall events from different times were conducted. The results showed that the cut-off low at 500 hPa with a low value of geopotential height will strengthen the low-pressure system at the surface, leading to a case of atmospheric instability over Iraq and a significant amount of rain will fall if the moisture is available.
Heat transfer process and fluid flow in a solar chimney used for natural ventilation are investigated numerically and experimentally her in. Solar chimney was designed, manufactured and tested by selecting different positions of air entrance namely: bottom entrance, side entrance, and both side and bottom entrances. The effect of integrating the chimney with paraffin (phase change material) on its thermal behavior has been also investigated. CFD analysis based on finite volume method is used to predict the thermal performance, and fluid flow in two-dimensional solar chimney under unsteady state condition, to identify the effect of different parameters such as solar radiation, and inclination angle. Experimental results show that a solar chi
... Show MoreViscosities (η) and densities (ρ) of atenolol and propranolol hydrochloride in water and in concentrations (0.05 M) and (0.1 M) aqueous solution of threonine have been used to reform different important thermodynamic parameters like apparent molal volumes fv partial molal volumes at infinite dilution fvo , transfer volume fvo (tr), the slop Sv , Gibbs free energy of activation for viscous flow of solution ΔG*1,2 and the B-coefficient have been calculated using Jones-Dole equation. These thermodynamic parameters have been predicted in terms of solute-solute and solute-solvent interaction.
Reservoir quality assessment is important for detecting hydrocarbon-bearing zones and guiding future enhancement strategies. This study presents a detailed petrophysical evaluation of the Mishrif Formation in the Buzurgan Oilfield, which was selected due to its strategic value through its significant remaining reserves which making it an ideal candidate for advanced evaluation techniques. This study aims for shale content, porosity, permeability, water saturation, net to gross, and lithology determination. Well log and core data were used together to establish accurate property estimations. Permeability prediction through conventional methods, like core permeability-porosity correlations, was highly dispersive due to the heterogenei
... Show MoreThe Iraqi sports journalism has paid great attention to sports events through press coverage of all its forms and arts, especially the coverage of the World Cup of football which is one of the most watched events in the world. Thousands of journals are preparing for the immediate coverage of such event which is a daunting task in itself. Newspapers have devoted a wider space to this great event in its pages as well as the weakly sports newspapers work on issuing a daily special issue. The importance of this research sheds light on the coverage of major events such as World Cup in Iraqi newspapers. The topic is new
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More