The optimization of artificial gas lift techniques plays a crucial role in the advancement of oil field development. This study focuses on investigating the impact of gas lift design and optimization on production outcomes within the Mishrif formation of the Halfaya oil field. A comprehensive production network nodal analysis model was formulated using a PIPESIM Optimizer-based Genetic Algorithm and meticulously calibrated utilizing field-collected data from a network comprising seven wells. This well group encompasses three directional wells currently employing gas lift and four naturally producing vertical wells. To augment productivity and optimize network performance, a novel gas lift design strategy was proposed. The optimization of gas allocation was executed to maximize oil production rates while minimizing the injected gas volume, thus achieving optimal oil production levels at the most effective gas injection volume for the designated network. The utilization of the PIPESIM Optimizer, founded on genetic algorithm principles, facilitated the attainment of these optimal parameters. The culmination of this study yielded an optimal oil production rate of 18,814 STB/d, accompanied by a gas lift injection rate of 7.56 MMscf/d. This research underscores the significance of strategic gas lift design and optimization in enhancing oil recovery and operational efficiency in complex reservoir systems like the Mishrif formation within the Halfaya oil field.
In this paper, a new class of non-convex functions called semi strongly (
This study involved the treatment of textile wastewater contaminated with direct blue 15 dye (DB15) using a heterogeneous photo-Fenton-like process. Bimetallic iron/copper nanoparticles loaded on bentonite clay were used as heterogeneous catalysts and prepared via liquid-phase reduction method using eucalyptus leaves extract (E-Fe/Cu@BNPs). Characterization methods were applied to resultant particles (NPs), including SEM, BET, and FTIR techniques. The prepared NPs were found with porous and spherical shapes with a specific surface area of particles was 28.589 m2/g. The effect of main parameters on the photo-Fenton-like degradation of DB15 was investigated through batch and continuous fixed-bed systems. In batch mode, pH, H2O2 dosage, DB15 c
... Show MoreAbstract
The purpose of the present paper is to light on the relationship between jobs design, analysis and its reflections on reinforcing workers' vocational adjustment. The present paper aims to accomplish cognitive and applied goals, top of which, test of functional analysis ability to have effect upon workers' vocational adjustment via job design directly and indirectly owning to the virtual factor practiced by these practices on the sought organization. The problem of the present paper comes with many, the most important is the of how to bolster and back up worker's technical adjustment through good and accurate design for the job.
Based on this problem and goals as to expla
... Show MoreDealing with this study to find a link principle in the construction of the system and disorder to the promise of the principles and concepts of intellectual and philosophical form and content in the act of interior design of the halls education in the Ministry of Labor and Social Affairs , which leads to a reaction design objective and functionally and to increase the strength of the effect on users of the coaches and trainers . As it informs the side cognitive and developmental study of the design of the interior spaces . So it was the goal of research in the detection of the nature of the system and disorder with Focus indicators and the type of regulations and privacy and what constitutes the framework of knowledge in order to explai
... Show MoreThe research dealt with the topic ' the aesthetics of design shape of interior spaces for the syndicate of physicians' as it reflects visions evolving to the level of tasting and positive interpretation for the space of work to be on a high design level.The research consisting of four chapters as follow; The first chapter examined the problem of the research contracted in the following question: Have the design shapes any role in achieving and showing the aesthetic side for the syndicate of physicians? so the goal of the research was showing the aesthetics of design shape of interior spaces for the syndicate of physicians, The chapter also included the objective spatial and temporal limits of research .Finally the terms were specified. T
... Show Moreole in all sta Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and fluids associated with
... Show MoreThe optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stag
... Show MoreOften there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of
... Show More