Determining Optimum Oil Separator Size and Optimum Operating Pressure

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stage for Jambur field less incremental liquid recovery achieved and this will not cover the cost of adding an extra stage.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three

... Show More
Crossref
View Publication Preview PDF
Publication Date
Thu Mar 18 2010
Journal Name
Spe Projects, Facilities & Construction
Correlating Optimum Stage Pressure for Sequential Separator Systems
Summary<p>A study to find the optimum separators pressures of separation stations has been performed. Stage separation of oil and gas is accomplished with a series of separators operating at sequentially reduced pressures. Liquid is discharged from a higher-pressure separator into the lower-pressure separator. The set of working separator pressures that yields maximum recovery of liquid hydrocarbon from the well fluid is the optimum set of pressures, which is the target of this work.</p><p>A computer model is used to find the optimum separator pressures. The model employs the Peng-Robinson equation of state (Peng and Robinson 1976) for volatile oil. The application of t</p> ... Show More
Scopus (15)
Crossref (13)
Scopus Crossref
View Publication
Publication Date
Sat Mar 30 2024
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Optimization of Separator Size and Operating Pressure for Three-phase Separators in the West Qurna1 Oil Field

An optimization study was conducted to determine the optimal operating pressure for the oil and gas separation vessels in the West Qurna 1 oil field. The ASPEN HYSYS software was employed as an effective tool to analyze the optimal pressure for the second and third-stage separators while maintaining a constant operating pressure for the first stage. The analysis involved 10 cases for each separation stage, revealing that the operating pressure of 3.0 Kg/cm2 and 0.7 Kg/cm2 for the second and third stages, respectively, yielded the optimum oil recovery to the flow tank. These pressure set points were selected based on serval factors including API gravity, oil formation volume factor, and gas-oil ratio from the flow tank.    To impro

... Show More
Crossref
Preview PDF
Publication Date
Wed Jun 30 2021
Journal Name
Journal Of Economics And Administrative Sciences
comparison Bennett's inequality and regression in determining the optimum sample size for estimating the Net Reclassification Index (NRI) using simulation

 Researchers have increased interest in recent years in determining the optimum sample size to obtain sufficient accuracy and estimation and to obtain high-precision parameters in order to evaluate a large number of tests in the field of diagnosis at the same time. In this research, two methods were used to determine the optimum sample size to estimate the parameters of high-dimensional data. These methods are the Bennett inequality method and the regression method. The nonlinear logistic regression model is estimated by the size of each sampling method in high-dimensional data using artificial intelligence, which is the method of artificial neural network (ANN) as it gives a high-precision estimate commensurate with the dat

... Show More
Crossref
View Publication Preview PDF
Publication Date
Tue Nov 19 2024
Journal Name
Al-nahrain Journal For Engineering Sciences
Optimum Height of Plate Stiffener under Pressure Effect

The economical design of plate loaded by pressure can be obtained by using stiffeners instead of increasing the thickness of plate. The main subject of this work is to obtain the effect of stiffener height on the maximum stress in the plate subjected to pressure load. Different plate-stiffener sets are selected to find the effects of stiffener thickness, plate dimensions and pressure, on the optimum stiffener height. The models under consideration are square plates clamped rigidly from four edges. Finite Element method is used to analyze 160 different models by using the Finite Element software package ANSYS version 11. Another analysis method based on maximum stress equation is used to analyze 30 models. The graphical comparison of results

... Show More
View Publication
Publication Date
Mon Nov 01 2010
Journal Name
All Days
Optimum Separation Pressure for Heavy Oils Sequential Separation
Abstract<p>The estimation of quantity of liquid that is collected from gas/oil separation system is a very complex task because it requires the application of the flash calculations which needs to solve the cubic equation of state and to use some numerical techniques. These difficulties can be overcome by a computer model which requires a lot of experimental data, long time, and experience.</p><p>This paper adopts a new technique to simplify this problem. It suggests new correlations for optimum separator pressure for separation station of heavy oils. The correlations have been achieved for two- and three- stage separation systems.</p><p>The co</p> ... Show More
Scopus (3)
Crossref (4)
Scopus Crossref
View Publication
Publication Date
Sat Dec 30 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Selecting Optimum Dimensions for a Three-Phase Horizontal Smart Separator for Khor Mor Gas-Condensate Processing Plant

      The Khor Mor gas-condensate processing plant in Iraq is currently facing operational challenges due to foaming issues in the sweetening tower caused by high-soluble hydrocarbon liquids entering the tower. The root cause of the problem could be liquid carry-over as the separation vessels within the plant fail to remove liquid droplets from the gas phase. This study employs Aspen HYSYS v.11 software to investigate the performance of the industrial three-phase horizontal separator, Bravo #2, located upstream of the Khor Mor sweetening tower, under both current and future operational conditions. The simulation results, regarding the size distribution of liquid droplets in the gas product and the efficiency gas/liquid separation, r

... Show More
Crossref (1)
Crossref
View Publication Preview PDF
Publication Date
Thu Dec 30 2010
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
DETERMINATION OF THE OPTIMUM OPERATING CONDITIONS IN THE GRANULATION OF GAMMA ALUMINA CATALYST SUPPORT

Granulation Technique for Gamma Alumina Catalyst Support was employed in inclined disk granulator (IDG), rotary drum granulator (RD) and extrusion – spheronization equipments .Product with wide size range can be produced with only few parameters like rpm of equipment, ratio of binder and angle of inclination. The investigation was conducted for determination the optimum operating conditions in the three above different granulation equipments.
Results reveal that the optimum operating conditions to get maximum granulation occurred at ( speed: 31rpm , Inclination:420 , binder ratio:225,300% ) for the IDG,( speed: 68rpm , Inclination: 12.50 , binder ratio: 300% ) for the RD and ( speed:1200rpm , time of rotation: 1-2min )for the Caleva

... Show More
View Publication Preview PDF
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
The Optimum Reservoir Performance of Nahr Umr/Ratawi Oil Field

Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with production rat

... Show More
Crossref
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
The The Optimum Reservoir Performance of Nahr Umr/Ratawi Oil Field

Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with pr

... Show More
Crossref
View Publication Preview PDF