The remediation oil production by matrix acidizing method on the well named "X" (for confidential reasons) is scrutinized in this paper. Initial production of 1150 bpd, production index of 2.8 STB/Psi/d and permeability of 150md, in 2018 two years down the lane this dropped to 450 bpd, production index 0.7 STB/Psi/d. The declined observed on the production index is trouble shouted and after elimination of (no completion damage/perforation damage), the skin is calculated by carrying out a well test (build-up test) whose extrapolation in excel over times gave us a skin of 40.The reservoir heterogeneity, containing >20% of feldspar, carbonates and paraffin’s guided thematrix acidizing design and treatment proposition to remedy this problem. A positive displacement pump (HT400), boosted by a centrifugal pump were used to pump the acid treatment through high pressure treating line downhole. Halliburton insite for stimulation the (IFS) software monitored treating pressure and surface flow rate, keeping injection rate below fracturing pressure. PipeSim software is used to run the nodal analysis before and after treatment this helped to forecast optimal production rates and pressure after treatments. Matrix acidizing method applied on the well X increased the production to 850 bpd with production index of 2 STD/psi/d, skin - 1.5. The economic benefit to the company stood at (profit oil 21,699,500 USD.) over a two years period of production. Meanwhile uncertainties in demand and supply of crude oil at the international market cause constant fluctuation in oil prices, this should be strongly considered upon execution of this project. Overall applications of this acidizing treatment can be carried out on reservoirs with similar mineralogy. HCl/HF blend dissolves sandstone, mud stone and calcite minerals thus reservoir porosity and permeability can be enhanced in regions extending several meters around the injection well.
This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th
... Show MoreAbstract
This research aims to analyze the reality of the production process in an assembly line Cars (RUNNA) in the public company for the automotive industry / Alexandria through the use of some Lean production tools, and data were collected through permanence in the company to identify the problems of the line in order to find appropriate to adopt some Lean production tools solutions, and results showed the presence of Lead time in some stations, which is reflected on the customer's waiting time to get the car, as well as some of the problems existing in the car produced such as high temperature of the car, as the company does not take into account customer preferences,
... Show MoreIn this paper a system is designed and implemented using a Field Programmable Gate Array (FPGA) to move objects from a pick up location to a delivery location. This transportation of objects is done via a vehicle equipped with a robot arm and an FPGA. The path between the two locations is followed by recognizing a black line between them. The black line is sensed by Infrared sensors (IR) located on the front and on the back of the vehicle. The Robot was successfully implemented by programming the Field Programmable Gate Array with the designed system that was described as a state diagram and the robot operated properly.
The aim of this work presents the analytical studies of both the magnetohydrodynamic (MHD) flux and flow of the non-magnetohydro dynamic (MHD) for a fluid of generalized Burgers’ (GB) withinan annular pipe submitted under Sinusoidal Pressure (SP)gradient. Closed beginning velocity's' solutions are taken by performing the finite Hankel transform (FHT) and Laplace transform (LT) of the successivefraction derivatives. Lastly, the figures were planned to exhibition the transformations effects of different fractional parameters (DFP) on the profile of velocity of both flows.
The goal of this research to identify a set of criteria that can be measured on the basis of which the effectiveness of the application of the Balanced Scorecard in the Jordanian Public Institutions in order to identify the basic requirements to ensure the application of balanced performance measures. The study population consisted of the staff of the Public Institution for Social Security - Irbid of directors of departments and heads of departments and administrative staff, was the use of a random sample of (50) an employee and the employee. The questionnaire was used as a tool to collect data, and as a result of subjecting these standards for the field test and the use of statistical analysis tools to the results of the study c
... Show MoreThis study aims to identify the role of forensic accounting in resolving banking disputes in the Iraqi environment, and to achieve this goal, the fiel
d survey method was used, as it is the most appropriate for studying the phenomenon in question and achieving its objectives. A sample of (50) male and female employees was selected, distributed among five banks listed on the Iraq Stock Exchange in the Baghdad governorate. The questionnaire tool prepared for this purpose was applied to them, which consisted of two main axes. The first axis included paragraphs of questions related to the importance of forensic accounting. The second axis relates to disputes At the end of the research, we reached a set of conclusions, the most import
... Show More