Excessive torque and drag can be critical limitation during drilling highly deviated oil wells. Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems. Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage. Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string. In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for analyses the effect of friction factor on torque and effective `tension of the drill string along well depth, moreover the effect of well bore problems such as; mud losses, accumulation of cutting bed in the well bore, stuck pipe, caving, sloughing, high torque and drag values on drill string components and well trajectory. Wells data which include hole section size, mud properties, well profile survey, casing string depth, rig specification, drill string components, drilling parameters like weight on bit, rotary speed and flow rate were used to compare between planning and drilling stages for these wells and identify the reasons of difference between these stages. The results showed a difference for the drilling phase and increasable in effective tension, torque, pick up and slack off drag, measured string weight, and possibility to occur the buckling if compare with planning phase. Wellbore instability, high friction factor, high tortuosity, high flow rate ,stuck pipe , excessive drag spot, partial to total losses, increase of drilling parameters, hard formations and bad hole cleaning, all these factors yield to this difference between planning and actual phases. When drilling hole section 8.5", the main causes of varying were drilling fluid losses, high value of friction factor, stuck pipe and friction forces when the maximum torque was (16 to 20 klb-ft) and pick up weight (20-40 klb)
This paper investigates a new approach to the rapid control of an upper limb exoskeleton actuator. We used a mathematical model and motion measurements of a human arm to estimate joint torque as a means to control the exoskeleton’s actuator. The proposed arm model is based on a two-pendulum configuration and is used to obtain instantaneous joint torques which are then passed into control law to regulate the actuator torque. Nine subjects volunteered to take part in the experimental protocol, in which inertial measurement units (IMUs) and a digital goniometer were used to measure and estimate the torque profiles. To validate the control law, a Simscape model was developed to simulate the arm model and control law in which measurem
... Show MoreAll-optical canonical logic units at 40 Gb/s using bidirectional four-wave mixing (FWM) in highly nonlinear fiber are proposed and experimentally demonstrated. Clear temporal waveforms and correct pattern streams are successfully observed in the experiment. This scheme can reduce the amount of nonlinear devices and enlarge the computing capacity compared with general ones. The numerical simulations are made to analyze the relationship between the FWM efficiency and the position of two interactional signals. © 2015 Chinese Laser Press
Wellbore instability is a significant problem faced during drilling operations and causes loss of circulation, caving, stuck pipe, and well kick or blowout. These problems take extra time to treat and increase the Nonproductive Time (NPT). This paper aims to review the factors that influence the stability of wellbores and know the methods that have been reached to reduce them. Based on a current survey, the factors that affect the stability of the wellbore are far-field stress, rock mechanical properties, natural fractures, pore pressure, wellbore trajectory, drilling fluid chemicals, mobile formations, naturally over-pressured shale collapse, mud weight, temperature, and time. Also, the most suitable ways to reduce well
... Show MoreThere Are Many Communities Suffering Of Unemployment Due To Has Great Social And Economic Impact, As Well As The Psychological Effects Devastating And Serious And That May Threaten States With Collapse And Leading Human Displacement And Loss And Crime, And Often Derive Unemployed People To Practice Bad Habits Such As Gambling, Alcohol And Drug Abuse To Escape From Their Reality To Their Concerns And Problems.
It Should Be Noted, That The Largest Percentage Of Unemployment In Developing Societies Represented By The Educated Class Of University Graduates, And This Is Something Painful.
The Unemployed Know That (Each Capable Of Working And Who Want To Look For And Accept Prevailing Bricks) Is Th
... Show MoreOptimization of well placement plays a considerable role in the production and maximizing the net present value of the investment of oil field developments. However, the application of the optimization techniques in well placement developments is so complicated because many decision variables, objective functions, and constraints are involved in the well placement optimization case. Furthermore, many computational techniques; conventional and non-conventional, have been utilized to optimize well placement operations. This study displays the advancement of the optimization methods applied in the well placement. Subsequently, the study assorted the applied optimization methods, and it demonstrates the restriction and the range of implementati
... Show MoreThe maximization of the net present value of the investment in oil field improvements is greatly aided by the optimization of well location, which plays a significant role in the production of oil. However, using of optimization methods in well placement developments is exceedingly difficult since the well placement optimization scenario involves a large number of choice variables, objective functions, and restrictions. In addition, a wide variety of computational approaches, both traditional and unconventional, have been applied in order to maximize the efficiency of well installation operations. This research demonstrates how optimization approaches used in well placement have progressed since the last time they were examined. Fol
... Show MoreConstitute the relationship between the director and actor mainstay chock done to show art in film and television , both of which occupy what a big role in the mission accomplishment . The leadership of the director of the artwork in various joints require two features two important ( creativity and administration ) , The capabilities director of creative serves as an added intellectual and aesthetic saturated sensation that leaves its impact on all the technical elements involved in done. Either trait administration and leadership it is what requires multiple skills in dealing on according to technical standards and moral and humanitarian allow the transfer of ideas , concepts and visions to those elements to embody and implement the ki
... Show More