Empirical equations for estimating thickening time and compressive strength of bentonitic - class "G" cement slurries were derived as a function of water to cement ratio and apparent viscosity (for any ratios). How the presence of such an equations easily extract the thickening time and compressive strength values of the oil field saves time without reference to the untreated control laboratory tests such as pressurized consistometer for thickening time test and Hydraulic Cement Mortars including water bath ( 24 hours ) for compressive strength test those may have more than one day.
The study aimed to compare the expression of miR-126-3p and miR-423-5p in patients and normal subjects, and correlate their expression with response to induction therapy. Circulating miR-126-3p and miR-423-5p were measured in the plasma of 43 adult AML patients and 35 age- and sex-matched controls by real time PCR. The foldchange in differential expression for each gene was calculated using the comparative cycle threshold (CT) method (also known as the 2−CT method). For statistical purposes, the fold change was calculated using DDCT (or 2–∆∆Ct) method to find the relative expression of miRNAs. The expression fold change of miR-126-3p was 1.73-fold increase in patients than controls (p= 0.010). The expression fold change of miR-423-5
... Show MoreFunctional strength is one of the most important elements of physical preparation and an important physical characteristic in our daily life in general and sports training in particular, as it is the most influential characteristic in all sporting events, which the athlete must possess in order to reach the highest levels and achieve the best results. The research aimed to prepare functional strength training exercises According to the gradual increase in load in the development of some physical abilities and achievement for men's 100 meter competition runners , And to identify the effect of functional strength training according to the gradual increase in load in developing some physical abilities and achievement for men’s 100-
... Show MoreArtificial Neural networks (ANN) are powerful and effective tools in time-series applications. The first aim of this paper is to diagnose better and more efficient ANN models (Back Propagation, Radial Basis Function Neural networks (RBF), and Recurrent neural networks) in solving the linear and nonlinear time-series behavior. The second aim is dealing with finding accurate estimators as the convergence sometimes is stack in the local minima. It is one of the problems that can bias the test of the robustness of the ANN in time series forecasting. To determine the best or the optimal ANN models, forecast Skill (SS) employed to measure the efficiency of the performance of ANN models. The mean square error and
... Show MoreThe aim of study To purify GPCR from a local strain of S. cerevisiae using Ion exchange and gel filtration chromatography techniques , by packing materials for columns which will be chosen of low cost comparing to the already used in published researches, which depend on the costly affinity chromatography and other expensive methods of purification. Local strain of S. cerevisiae chosen for extraction and purification of G-protein coupled receptor (GPCR) .The strains were obtained from biology department in Al- Mosul University, Iraq. The isolated colony was activated on Yeast Extract Pepton Dextrose Broth (YEPDB) and incubated at 30 C˚ for 24 h .Loop fully of the yeast culture was transferred to (10ml) of yeast extract peptone glucose
... Show MoreThis paper is concerned with introducing and studying the new approximation operators based on a finite family of d. g. 'swhich are the core concept in this paper. In addition, we study generalization of some Pawlak's concepts and we offer generalize the definition of accuracy measure of approximations by using a finite family of d. g. 's.
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Reduce the required time for measuring the permeability of clayey soils by using new manufactured cell