One of the most important and common problems in petroleum engineering; reservoir, and production engineering is coning; either water or gas coning. Almost 75% of the drilled wells worldwide contains this problem, and in Iraq water coning problem is much wider than the gas coning problem thus in this paper we try to clarify most of the reasons causing water coning and some of applicable solutions to avoid it using the simulation program (CMG Builder) to build a single well model considering an Iraqi well in north of Iraq black oil field with a bottom water drive, Coning was decreased by 57% by dividing into sub-layers (8) layers rather than (4) layers, also it was decreased (Coning) by 45% when perforation numbers and positions was changed.
The purpose of this paper is to study the properties of the
partial level density ( ) l g and the total level density g ( ),
numerically obtained as a l sum of ( ) l g up to 34 max l , for
a Harmonic – Oscillator potential well. This method applied the
quantum – mechanical phase shift technique and concentrated
on the continuum region. Also a discussion of peculiarities of
quantal calculation for single particle level density of energy –
dependent potential
Gas coning is one of the most serious problems in oil wells. Gas will reach the perforations and be produced with oil. Anyhow there is a certain production rate called critical production rate. The daily production rate should not exceed the critical production rate. In this research ten oil wells have been tested for problem of gas coning for a period of time of eighteen months. The production rates of these Ten oil wells are tabulated in a table exist in this research.
These production rates are considered as critical production rate because no gas coning has been observed in these wells. The critical production rates of these wells don't concide with those obtained from (Meyer, Gardiner, Pirson) method and also they don’t concide
Real life scheduling problems require the decision maker to consider a number of criteria before arriving at any decision. In this paper, we consider the multi-criteria scheduling problem of n jobs on single machine to minimize a function of five criteria denoted by total completion times (∑), total tardiness (∑), total earliness (∑), maximum tardiness () and maximum earliness (). The single machine total tardiness problem and total earliness problem are already NP-hard, so the considered problem is strongly NP-hard.
We apply two local search algorithms (LSAs) descent method (DM) and simulated annealing method (SM) for the 1// (∑∑∑
... Show MorePraise be to God, who created people from one soul, and made her husband, and prayers and peace be upon His Messenger, Mercy given and the grace given, and on a machine and companions pure. Divorce cases have increased in recent years in a worrying manner, especially since divorce has unforeseen consequences at the individual and social levels. The source of concern stems from the fact that the cohesion and integrity of society starts from a family as it is the cornerstone of the social structure, which is the foundation upon which the large society is based. Marital life may suffer from problems and obstacles that are difficult to solve, so the man presents the divorce of his wife and that the phenomenon of divorce is not a result of it, b
... Show MoreAims to find out the (Extent of mathematics teachers' appreciation of the mathematical problem `multiple solutions) Research sample consisted of (100) mathematics teachers distributed on the General Directorates of Education in Baghdad (Rusafa 1/2/3) and (Karkh 1/2/ 3) There was two research approach which are: The first - two different answers of students to the same issue where teachers must assess each answer and explain which one the teacher will accept and why? The second - Different solutions of students' to the same issue, including wrong answers , Teachers should correct the answers and give them final grades (0-10). Descriptive and analytical Approch was used in this research methodology And zero hypotheses, which are as f
... Show MoreIn this paper, one of the Machine Scheduling Problems is studied, which is the problem of scheduling a number of products (n-jobs) on one (single) machine with the multi-criteria objective function. These functions are (completion time, the tardiness, the earliness, and the late work) which formulated as . The branch and bound (BAB) method are used as the main method for solving the problem, where four upper bounds and one lower bound are proposed and a number of dominance rules are considered to reduce the number of branches in the search tree. The genetic algorithm (GA) and the particle swarm optimization (PSO) are used to obtain two of the upper bounds. The computational results are calculated by coding (progr
... Show MoreIn this paper, the bi-criteria machine scheduling problems (BMSP) are solved, where the discussed problem is represented by the sum of completion and the sum of late work times simultaneously. In order to solve the suggested BMSP, some metaheurisitc methods are suggested which produce good results. The suggested local search methods are simulated annulling and bees algorithm. The results of the new metaheurisitc methods are compared with the complete enumeration method, which is considered an exact method, then compared results of the heuristics with each other to obtain the most efficient method.
This study examined >140 relevant publications from the last few years (2018–2021). In this study, classification was reviewed depending on the operation's progress. Electrocoagulation (EC), electrooxidation (EO), electroflotation (EF), electrodialysis (ED), and electro-Fenton (EFN) processes have received considerable attention. The type of action (individual or hybrid) for each electrochemical procedure was evaluated, and statistical analysis was performed to compare them as a new manner of reviewing cited papers providing a massive amount of information efficiently to the readers. Individual or hybrid operation progress of the electrochemical techniques is critical issues. Their design, operation, and maintenance costs vary depending o
... Show MoreThis article proposes a new strategy based on a hybrid method that combines the gravitational search algorithm (GSA) with the bat algorithm (BAT) to solve a single-objective optimization problem. It first runs GSA, followed by BAT as the second step. The proposed approach relies on a parameter between 0 and 1 to address the problem of falling into local research because the lack of a local search mechanism increases intensity search, whereas diversity remains high and easily falls into the local optimum. The improvement is equivalent to the speed of the original BAT. Access speed is increased for the best solution. All solutions in the population are updated before the end of the operation of the proposed algorithm. The diversification f
... Show MoreParticulate matter (PM) emitted from diesel engine exhaust have been measured in terms of mass, using
99.98 % pure ethanol blended directly, without additives, with conventional diesel fuel (gas – oil),to
get 10 % , 15 %, 20 % ethanol emulsions . The resulting PM collected has been compared with those
from straight diesel. The engine used is a stationary single cylinder, variable compression ratio Ricardo
E6/US. This engine is fully instrumented and could run as a compression or spark ignition.
Observations showed that particulate matter (PM) emissions decrease with increasing oxygenate
content in the fuel, with some increase of fuel consumption, which is due to the lower heating value of
ethanol. The reduction in