Preferred Language
Articles
/
hRZfSYcBVTCNdQwCq0JV
Estimation Pore and Fracture Pressure Based on Log Data; Case Study: Mishrif Formation/Buzurgan Oilfield at Iraq
...Show More Authors

Prediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressure gradient and clay volume, which were also established first, data such as gamma ray, density, resistivity, and sonic log data are also required. A key consideration in the design of certain wells is the forecasting of fracture pressure for wells drilled in the southern Iraqi oilfield of Buzurgan. The pressure abnormality is found in MA, MB21, MC1 and MC2 units by depending on pore pressures calculated from resistivity log. In these units, depths and its equivalent normal and abnormal pressure are detected for all sex selected wells; BUCS-47, BUCS-48, BUCS-49, BUCN-43, BUCN-51 and BBCN-52. For MA, MB21, MC1, and MC2 units, the highest difference in pore pressure values are 1698 psi @ 3750 m (BUCN-51), 3420 psi @ 3900 m (BUCN-51), 788 psi @ 3980 m (BUCS-49), and 5705 psi @ 4020 m (BUCN-52). On other hands, MB11 and MB12 units have normal pressure trend in all studied wells. Finally, the results show that the highest pore and fracture pressure values is existed in North dome, in comparison with that obtained in south dome of Mishrif reservoir at Buzurgan oilfield.

Crossref
Publication Date
Sun Mar 04 2012
Journal Name
Baghdad Science Journal
Oilfield Produced Water Management: Treatment, Reuse and Disposal
...Show More Authors

Produced water is accompanied with the production of oil and gas especially at the fields producing by water drive or water injection. The quantity of these waters is expected to be more complicated problem with an increasing in water cut which is expected to be 3-8 barrels water/produced barrel oil.Produced water may contain many constituents based on what is present in the subsurface at a particular location. Produced water contains dissolved solids and hydrocarbons (dissolved and suspended) and oxygen depletion. The most common dissolved solid is salt with concentrations range between a few parts per thousand to hundreds parts per thousand. In addition to salt, many produced waters also contain high levels of heavy metals like zinc, bari

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Environmental Earth Sciences
Urban geochemistry assessment using pollution indices: a case study of urban soil in Kirkuk, Iraq
...Show More Authors

View Publication
Crossref (6)
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Ieee Access
Total Dissolved Salt Prediction Using Neurocomputing Models: Case Study of Gypsum Soil Within Iraq Region
...Show More Authors

View Publication
Scopus (14)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management & Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (23)
Crossref (29)
Scopus Clarivate Crossref
Publication Date
Tue Sep 01 2020
Journal Name
International Journal Of Hydrogen Energy
Hydrogen gas sensing based on nanocrystalline SnO2 thin films operating at low temperatures
...Show More Authors

View Publication
Scopus (43)
Crossref (39)
Scopus Clarivate Crossref
Publication Date
Mon Jul 01 2019
Journal Name
Iop Conference Series: Materials Science And Engineering
Study of different geostatistical methods to model formation porosity (Cast study of Zubair formation in Luhais oil field)
...Show More Authors
Abstract<p>This study is concerned with making comparison in using different geostatistical methods for porosity distribution of upper shale member - Zubair formation in Luhais oil field which was chosen to study.</p><p>Kriging, Gaussian random function simulation and sequential Gaussian simulation geostatistical methods were adopted in this study. After preparing all needed data which are contour map, well heads of 12 wells, well tops and porosity from CPI log. Petrel software 2009 was used for porosity distribution of mentioned formation in methods that are showed above. Comparisons were made among these three methods in order to choose the best one, the comparing cri</p> ... Show More
View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Wed Sep 09 2015
Journal Name
Elixir
Effect Tiers Pressure and Speeds tractor on Performance Chisel and Disc Plows
...Show More Authors

Field experiment conducted to measured Slippage, Effective field capacity, Field Efficiency, Soil Volume Disturbed and Specific Productivity Tillage in silt clay loam soil with depth 18 cm in Baghdad- Iraq. Split – split plot design under randomized complete block design with three replications using Least Significant Design 5 % was used. Three factor used in this experiment included Two types of plows included Chisel and Disk plows which represented main plot , Three Tires Inflation Pressure was second factor included 1.1 ,1.8 and 2.7 Bar, and Three forward speeds of the tillage was third factor included 2.35 , 4.25 and 6.50 km/hr. Result show chisel plow recorded best parameters performance

Publication Date
Fri Nov 01 2019
Journal Name
Journal Of Physics: Conference Series
Data Processing, Storage, and Analysis: Applying Computational Procedures to the Case of a Falling Weight Deflectomer (FWD)
...Show More Authors

In the field of civil engineering, the adoption and use of Falling Weight Deflectometers (FWDs) is seen as a response to the ever changing and technology-driven world. Specifically, FWDs refer to devices that aid in evaluating the physical properties of a pavement. This paper has assessed the concepts of data processing, storage, and analysis via FWDs. The device has been found to play an important role in enabling the operators and field practitioners to understand vertical deflection responses upon subjecting pavements to impulse loads. In turn, the resultant data and its analysis outcomes lead to the backcalculation of the state of stiffness, with initial analyses of the deflection bowl occurring in conjunction with the measured or assum

... Show More
Scopus Crossref
Publication Date
Wed Oct 01 2008
Journal Name
2008 First International Conference On Distributed Framework And Applications
A strategy for Grid based t-way test data generation
...Show More Authors

View Publication
Scopus (22)
Crossref (17)
Scopus Crossref
Publication Date
Tue Feb 28 2023
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Development prediction algorithm of vehicle travel time based traffic data
...Show More Authors

This work bases on encouraging a generous and conceivable estimation for modified an algorithm for vehicle travel times on a highway from the eliminated traffic information using set aside camera image groupings. The strategy for the assessment of vehicle travel times relies upon the distinctive verification of traffic state. The particular vehicle velocities are gotten from acknowledged vehicle positions in two persistent images by working out the distance covered all through elapsed past time doing mollification between the removed traffic flow data and cultivating a plan to unequivocally predict vehicle travel times. Erbil road data base is used to recognize road locales around road segments which are projected into the commended camera

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Crossref