This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are in line with findings from similar studies in other countries and regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. While many studies have examined factors causing delays and cost overruns, this study offers unique insights into factors that need to be considered when implementing projects for post disaster emergency reconstruction in areas impacted by wars and terrorism.
The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five
... Show MoreTotal quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show MoreThis Research aim to identify the factors affecting the strategic implementation of sewage projects and to seek to activate the real follow-up of projects to identify the factors that accompany their implementation, The study included a sample of the projects of the investment plan implemented for the Directorate General of sewage in the governorates of Iraq, which was completed during the six years period (2010-2016). The sample of the research was four projects: The project of implementation and processing of the treatment plant and the lifting station and the conveyor line for the project of IMARA/The third stage/Al-Sanaf marshland , The project of the processing and implementation of the treatment plant with the
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreThe avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi
... Show MoreThe climate parameters of rainfall, and average of maximum and minimum temperature were investigated for the period of 2000-2019 in three stations in central and eastern Iraq (Baghdad, Diyala, and Kut provinces). Evidence of climate change was noticed from the results, reflected by decreased mean values of annual rainfall with increased mean of maximum and minimum temperature. In addition, the water balance and the climatic conditions were determined for Khanaqin station for the years 1981-2019. The analysis of Khanaqin climate parameters demonstrated total annual mean values of rainfall of 260.86mm and evaporation of 3119.59mm. The mean monthly relative humidity was 46.65%, sunshine was 8.39h/day, temperature was 23.36C
... Show More