The aim of this paper is to propose an efficient three steps iterative method for finding the zeros of the nonlinear equation f(x)=0 . Starting with a suitably chosen , the method generates a sequence of iterates converging to the root. The convergence analysis is proved to establish its five order of convergence. Several examples are given to illustrate the efficiency of the proposed new method and its comparison with other methods.
Estimating multivariate location and scatter with both affine equivariance and positive break down has always been difficult. Awell-known estimator which satisfies both properties is the Minimum volume Ellipsoid Estimator (MVE) Computing the exact (MVE) is often not feasible, so one usually resorts to an approximate Algorithm. In the regression setup, algorithm for positive-break down estimators like Least Median of squares typically recomputed the intercept at each step, to improve the result. This approach is called intercept adjustment. In this paper we show that a similar technique, called location adjustment, Can be applied to the (MVE). For this purpose we use the Minimum Volume Ball (MVB). In order
... Show MoreIn this paper, the computational complexity will be reduced using a revised version of the selected mapping (SLM) algorithm. Where a partial SLM is achieved to reduce the mathematical operations around 50%. Although the peak to average power ratio (PAPR) reduction gain has been slightly degraded, the dramatic reduction in the computational complexity is an outshining achievement. Matlab simulation is used to evaluate the results, where the PAPR result shows the capability of the proposed method.
Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholder needs , However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance , but many worldwide construction projects appear to give insufficient attention to effective management and definition of project planning, including pre planning stages . Indeed, some planning issues indeed, some planning issues have been completely ove
... Show MoreLeaching scheduling techniques are one of the suggested solutions for water scarcity problems .The aim of the study is to show the possibility of using leaching scheduling, when applying the irrigation scheduling program for a certain irrigation project, which was prepare by Water Resources Engineering –University of Baghdad with some modifications to generalized it and it make applicable to various climatic zone and different soil types.
The objectives of this research is to build a system that concerns the prediction of the leaching scheduling (depth and date of leaching water), illustrating the main problems (soil salinity, save the amount of leaching requirement, and to maintain crops growth).The other objective is to compare be
This study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for ntasks on a single machine involves minimizing a function of three criteria: total completion time (C_j),maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic thenhighlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. Whilein the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applyingthe Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) upto n=100 jobs. The BAB appro
... Show MoreAbstract\
In this research we built a mathematical model of the transportation problem for data of General Company for Grain Under the environment of variable demand ,and situations of incapableness to determining the supply required quantities as a result of economic and commercial reasons, also restrict flow of grain amounts was specified to a known level by the decision makers to ensure that the stock of reserves for emergency situations that face the company from decrease, or non-arrival of the amount of grain to silos , also it took the capabilities of the tanker into consideration and the grain have been restricted to avoid shortages and lack of processing capability, Function has been adopted
... Show MoreThe demands of professional, scientific, and academic life have made it necessary to identify the various difficulties faced by postgraduate female students, which lead to problems that hinder their achievement of the required goals. This necessitates directing efforts toward finding solutions to confront and solve problems through appropriate cognitive behavior. Therefore, this study aimed to identify information processing styles and problem-solving and their relationship with metamotivation and perceived control among postgraduate female students (PhD/Master's). To achieve this aim, the descriptive approach using the survey method was adopted due to its suitability to the nature of the research problem. The population was defined
... Show MoreAsmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement inside the reser
... Show More