The regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the full-field model on the basis of time-consuming and computational analysis. The sector model was neighboring by extra grid blocks and three pseudo wells as injector wells to realize the pressure on the sector boundary, which attained an acceptable history matching. The fluid model and physics model were introduced by using Pressure Volume Temperature data of well involved in the study area and two relative permeability curves. Fourteen wells were utilized in this work, four wells are injectors, and the rest are producer. The development scenarios were implemented by setting various targets of oil production and different water injection rates required for pressure maintenance operations. Optimization of water cut has been applied by adjustment of production and injection rates and shut off the high water cut intervals. The results obtained from this study showed that the inverted 9-spot has a good recovery which is illustrated in the case_2C, the production rate was (49,000 STB/D) with minimum water cut (27.5%) as compared with a five-spot pattern.
A survey statistician for cholera in Iraq for 1980 and until 2003 show that cholera is endemic in Iraq and that the highest number of casualties recorded in the years 1998-1999 and increasing spread of the disease during the wars in hot climates, wet a study bacteriological used where circles selective and tests Alkouhaoah examinations serological system
Vaccine hesitancy poses a significant risk to global recovery from COVID-19. To date however, there is little research exploring the psychological factors associated with vaccine acceptability and hesitancy in Iraq.
To explore attitudes towards COVID-19 vaccination in Iraq. To establish the predictors of vaccine uptake and vaccine hesitancy in an Iraqi population.
Using a cross-sectional design, 7,778 participants completed an online questionnaire exploring their vaccination status, likelihood of infection, perc
A survey and revised checklist of the species belonging to the family of Compositae for the specimens which are collected and deposited previously at the herbarium of the Iraq Natural History Research Center and Museum, in addition to the current specimens collected for the period 2016-2021. A total of 85 species belonging to 49 genera and 16 tribes are revised with their synonyms, locality, and distributions, flowering and fruiting period.
The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stag
... Show MoreThe optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three
... Show MoreOften there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of
... Show Moreole in all sta
Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and flui
... Show Moreole in all sta Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and fluids associated with
... Show MoreThe study aims to identify the reality of the use of educational technology in the teaching of mathematics from the point of view of mathematics teachers in Amman, where the researcher used the descriptive survey method. The sample included (67) female teachers working in public schools in Amman. In order to achieve the objectives of the study, the researcher used the questionnaire as a tool to collect data. The study concluded that many educational techniques are not available from the point of view of the study sample. Mathematics teachers also found that there are many obstacles that prevent the use of educational techniques in schools, most notably the lack of courses offered to teachers on the use of teaching techniques in teaching
... Show MoreMottos Of Opposition Movements In iraq during the umayyad period and their religious and political indications - al shia and al khawarij