In petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started in 1976. Reservoir exhibits heterogeneity in porosity and permeability throughout the field, therefore it’s a big challenge to control all reservoir properties during matching process. The historical matching process includes matching field and wells oil and water production rates, water injection rates, water cut, and reservoir static pressure. Finally, the results show that the good matching between simulated model and observed data; oil and water production rates, water injection rates, water cut, and static reservoir pressure which allow for implementing perfect future production forecasting strategies.
Abstract Iraq has an important place in the regional and international balance, and the competition among countries has increased in rapprochement with Iraq, not only for its geography or its privileged location, but because it has many other components that make regional and international countries want to strengthen their relations with it (Regional and international powers). In addition to that, Iraq has become increasingly important for these international and regional powers after its victory over the terrorist organization (ISIS), which proved an important fact that Iraq represents the most important pillars in the international balance.
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreIndicative supervision represents the comparison between direct intervention (acquisition, nationalism) and participation through rules.
The last financial crisis reflected our needs for different approaches of supervision consist with our goals, but the crisis reveals also number of sounds requested and pressured toward direct control (Intervention via forces) through government acquisition and nationalization.
This study attempts to deal with crisis lessons, in the field of choice between indicative and direct supervision which government authorities used to reduce the bad effect on the monetary firms.
Iraqi banks suffered from high levels of direct co
... Show MoreElectronic banking services appeared as a result of laying the foundations for the application of electronic automation in the banking field, and despite the clear expansion in its adoption and implementation as an inevitable necessity imposed by international and national developments, its application was not ideal according to the level that was expected to occur after the abandonment of traditional banking services, which produced some risks Which is evident in the absence of a legal system, whether at the level of proving and authoritative electronic banking services such as electronic signature, Or at the level of protecting the confidentiality of these services and ensuring that they are not exp
... Show MorePermeability determination in Carbonate reservoir is a complex problem, due to their capability to be tight and heterogeneous, also core samples are usually only available for few wells therefore predicting permeability with low cost and reliable accuracy is an important issue, for this reason permeability predictive models become very desirable.
This paper will try to develop the permeability predictive model for one of Iraqi carbonate reservoir from core and well log data using the principle of Hydraulic Flow Units (HFUs). HFU is a function of Flow Zone Indicator (FZI) which is a good parameter to determine (HFUs).
Histogram analysis, probability analysis and Log-Log plot of Reservoir Qua
... Show MoreLow salinity (LS) water flooding is a promising EOR method which has been examined by many experimental studies and field pilots for a variety of reservoirs and oils. This paper investigates applying LS flooding to a heavy oil. Increasing the LS water temperature improves heavy oil recovery by achieving higher sweep efficiency and improving oil mobility by lowering its viscosity. Steam flooding projects have reported many problems such as steam gravity override, but override can be lessened if the steam is is alternated with hot LS water. In this study, a series of reservoir sandstone cores were obtained from Bartlesville Sandstone (in Eastern Kansas) and aged with heavy crude oil (from the same reservoir) at 95°C for 45 days. Five reservo
... Show MoreThe downhole flow profiles of the wells with single production tubes and mixed flow from more than one layer can be complicated, making it challenging to obtain the average pressure of each layer independently. Production log data can be used to monitor the impacts of pressure depletion over time and to determine average pressure with the use of Selective Inflow Performance (SIP). The SIP technique provides a method of determining the steady state of inflow relationship for each individual layer. The well flows at different stabilized surface rates, and for each rate, a production log is run throughout the producing interval to record both downhole flow rates and flowing pressure. PVT data can be used to convert measured in-situ r
... Show MoreThe downhole flow profiles of the wells with single production tubes and mixed flow from more than one layer can be complicated, making it challenging to obtain the average pressure of each layer independently. Production log data can be used to monitor the impacts of pressure depletion over time and to determine average pressure with the use of Selective Inflow Performance (SIP). The SIP technique provides a method of determining the steady state of inflow relationship for each individual layer. The well flows at different stabilized surface rates, and for each rate, a production log is run throughout the producing interval to record both downhole flow rates and flowing pressure. PVT data can be used to convert measured in-situ rates
... Show More