Plane cubics curves may be classified up to isomorphism or projective equivalence. In this paper, the inequivalent elliptic cubic curves which are non-singular plane cubic curves have been classified projectively over the finite field of order nineteen, and determined if they are complete or incomplete as arcs of degree three. Also, the maximum size of a complete elliptic curve that can be constructed from each incomplete elliptic curve are given.
In this article, a continuous terminal sliding mode control algorithm is proposed for servo motor systems. A novel full-order terminal sliding mode surface is proposed based on the bilimit homogeneous property, such that the sliding motion is finite-time stable independent of the system’s initial condition. A new continuous terminal sliding mode control algorithm is proposed to guarantee that the system states reach the sliding surface in finitetime. Not only the robustness is guaranteed by the proposed controller but also the continuity makes the control algorithm more suitable for the servo mechanical systems. Finally, a numerical example is presented to depict the advantages of the proposed control algorithm. An application in the rota
... Show MoreThe aim: In this study, we present and evaluate the vest-over-pants technique as a simple way to correct urethrocutaneous fistulas after hypospadias. Materials and methods: Between October 2018 and June 2020, twenty male patients aged 5 to 20 years came to us with post hypospadias repair fistula, these patients underwent vest-over-pant repair of their fistula. The size of fistula was ranging between 2.5-5 mm. The distribution of fistula was coronal (3 patients), distal penile (9 patients), midshaft (2 patients) and proximal penile (6 patients). In 14 patients there were single fistula and 6 patients had more than one fistula. Eleven of patients were exposed to a previous failed fistula repair procedure. Results: Six months after the operati
... Show MoreIn this study; a three-dimensional model was created to simulate groundwater in Al-Haydariyah area of the governorate of Al-Najaf. A solid model was created to utilize the cross sections of 25 boreholes in the research region, and it was made out of two layers: sand and clay. The steady-state calibration was employed in six observation wells to calibrate the model and establish the hydraulic conductivity, which was 17.49 m/d for sand and 1.042 m/d for clay, with a recharge rate of 0.00007 m/day. The wells in the research region were reallocated with a distance of 1500 m between each well, resulting in 140 wells evenly distributed throughout the study area and with a discharge of 5 l/s, and the scenarios were run for 1000
... Show Morein this paper fourth order kutta method has been used to find the numerical solution for different types of first liner
In this paper, the author established some new integral conditions for the oscillation of all solutions of nonlinear first order neutral delay differential equations. Examples are inserted to illustrate the results.
Background: Penetrating neck injuries are common problem in our country due to increasing violence, terrorist bombing and military operations.
These injuries are potentially life threating and need great attention and proper management.
Objective: The aim of this study is to focus on the importance of anatomical zonal classification of the neck in the management of penetrating injuries of the visceral compartment of the Neck.
Methods :70 patients with various injuries who were managed at causality unit and Otolaryngology department in Al-Kindy Teaching Hospital during aperiod from January 1st 2015 to October 31st 2015.
The study carried on those patient depending on proper clinical examination and their urgent management.
In this paper, a sufficient condition for stability of a system of nonlinear multi-fractional order differential equations on a finite time interval with an illustrative example, has been presented to demonstrate our result. Also, an idea to extend our result on such system on an infinite time interval is suggested.
The rapid reality of events in the information era, and the enormous pressure of forces market, competition, permanent movement of the markets and consumers and the large development unprecedented of technology in all areas make a lot of organizations find it difficult to keep up with this rapid developments .Here was the role of strategic vigilance closer organization to their environment ,and play an active role in providing the necessary information to make decisions and insurance companies are not far from those changes .On this basis the researcher offered studied(Over the awareness of managers of insurance companies for strategic vigilance).Choosing sample of 35 managers in the National Insurance Company to test th
... Show MoreMachine learning (ML) is a key component within the broader field of artificial intelligence (AI) that employs statistical methods to empower computers with the ability to learn and make decisions autonomously, without the need for explicit programming. It is founded on the concept that computers can acquire knowledge from data, identify patterns, and draw conclusions with minimal human intervention. The main categories of ML include supervised learning, unsupervised learning, semisupervised learning, and reinforcement learning. Supervised learning involves training models using labelled datasets and comprises two primary forms: classification and regression. Regression is used for continuous output, while classification is employed
... Show MoreProjects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo