Today many people suffering from health problems like dysfunction in lungs and cardiac. These problems often require surveillance and follow up to save a patient's health, besides control diseases before progression. For that, this work has been proposed to design and developed a remote patient surveillance system, which deals with 4 medical signs (temperature, SPO2, heart rate, and Electrocardiogram ECG. An adaptive filter has been used to remove any noise from the signal, also, a simple and fast search algorithm has been designed to find the features of ECG signal such as Q,R,S, and T waves. The system performs analysis for medical signs that are used to detected abnormal values. Besides, it sends data to the Base-Station with a data block (ECG signals) that contains the problem. In addition, it generates an alarm to the physicians via ringing up mobile and SMS to overcome the internet disconnected. Also, the system has been designed to achieve precision, low cost, and low energy consumption. Three types of sensors has been used in this work, ECG, SPo2, and temperature sensors. Also, a sim800L GSM module has been used for communications, the main controller in this work is ESP32 unit.
The research acquires its importance by motivating the behavioural side of the employees to apply modern technology in the work, because of its great importance in increasing the efficiency of employees’ performance and excellence. The research was based on two main hypotheses to show the relationship and impact between the variables through the adoption of a questionnaire to collect data and information related to the research, which consisted of (50) people from administrators working at different levels, based on personal interviews and field visits to collect research data. The data collection process was subjected to statistical analysis using the statistical program (SPSS) (Statistical package for social science) to reach
... Show MoreThe present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation costs
... Show MoreAzo dyes like methyl orange (MO) are very toxic components due to their recalcitrant properties which makes their removal from wastewater of textile industries a significant issue. The present study aimed to study their removal by utilizing aluminum and Ni foam (NiF) as anodes besides Fe foam electrodes as cathodes in an electrocoagulation (EC) system. Primary experiments were conducted using two Al anodes, two NiF anodes, or Al-NiF anodes to predict their advantages and drawbacks. It was concluded that the Al-NiF anodes were very effective in removing MO dye without long time of treatment or Ni leaching at in the case of adopting the Al-Al or NiF-NiF anodes, respectively. The structure and surface morphology of the NiF electrode were inves
... Show Morepaid recent developments in the information and communications technology and the accompanying developments in the global market to pay particular accounting information users to demand more sophistication in terms of corporate financial reporting systems, which led to the emergence of a new type of reporting (financial reporting in real time). where is the information and communications technology mainstay Nations for the development and progress, thanks to the development of technology that have made the transmission of information easily conducted and high speed to all who need it, communication is instantaneous and the flow of information via the internet dramatically exceeded the border temporal and spatial anywhere in the w
... Show MoreThe present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation c
... Show MoreDisasters, crises and wars are a serious and unforeseen threat. The capacity of the early warning system to monitor such crises is therefore crucial. The ability to make quick decisions in a short time is necessary to prevent crises from occurring. Here, the role and effectiveness of the early warning system emerges through its ability to monitor, record and analyze signals. It can also be evidenced by its ability to immediately convey these indicators to the concerned authorities to take measures that ensure these conflicts and disasters do not worsen. The system’s ability to detect disasters and crises, identify the crisis and its type, and use the scientific method and common sense to deal with it is something that contributes to findi
... Show MoreBackground: The appointment system is a common practice in primary health care clinics in developed countries. The patients and health care providers in the primary health care setting perceived the appointment system as an indicator of good quality service.
Objective: The aim of this study was to survey patients’ and health care providers’ attitudes towards the introduction of an appointment system and their satisfaction with the existing ‘walk-in’ system in the primary health care setting.
Subjects and Methods: A questionnaire survey was conducted included a convenient sample of 234 patients as well as 76 health care providers from two primary health care center
... Show MoreThe research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreThe present work presents design and implementation of an automated two-axis solar tracking system using local materials with minimum cost, light weight and reliable structure. The tracking system consists of two parts, mechanical units (fixed and moving parts) and control units (four LDR sensors and Arduino UNO microcontroller to control two DC servomotors). The tracking system was fitted and assembled together with a parabolic trough solar concentrator (PTSC) system to move it according to information come from the sensors so as to keep the PTSC always perpendicular to sun rays. The experimental tests have been done on the PTSC system to investigate its thermal performance in two cases, with tracking system (case 1) and without trackin
... Show MoreNumerical simulations have been carried out on the solar chimney power plant systems. This paper gives the flow field analysis for a solar chimney power generation project located in Baghdad. The continuity, Naver-stockes, energy and radiation transfer equations have been solved and carried out by Fluent software. The governing equations are solved for incompressible, 3-D, steady state, turbulent is approximated by a standard k - model with Boussiuesq approximation to study and evaluate the performance of solar chimney power plant in Baghdad city of Iraq. The different geometric parameters of project are assumed such as collector diameter and chimney height at different working conditions of solar radiation intensity (300,450,600,750
... Show More