The paper presents the design of a system consisting of a solar panel with Single Input/Multiple Outputs (DC-DC) Buck Converter by using Simulink dialogue box tools in MATLAB software package for simulation the system. Maximum Power Point Tracking (MPPT) technique depending on Perturb and Observe (P&O) algorithm is used to control the output power of the converter and increase the efficiency of the system. The characteristics of the MSX-60 PV module is chosen in design of the system, whereas the electrical characteristics (P-V, I-V and P-I curves) for the module are achieved, that is affected by the solar radiation and temperature variations. The proposed design module has been found to be stable for any change in atmospheric temperature and solar radiation. The maximum power is achieved at voltage 17V and current 3.5A when using MPPT controller, and approximate results for multiple outputs voltages and current (9V:2A, 5V:1A, 2.2V:0.5A) are obtained. The proposed model is very useful for engineers, researchers and experts to design their systems which require a simple and accurate PV cells model.
This research deals with unusual approach for analyzing the Simple Linear Regression via Linear Programming by Two - phase method, which is known in Operations Research: “O.R.”. The estimation here is found by solving optimization problem when adding artificial variables: Ri. Another method to analyze the Simple Linear Regression is introduced in this research, where the conditional Median of (y) was taken under consideration by minimizing the Sum of Absolute Residuals instead of finding the conditional Mean of (y) which depends on minimizing the Sum of Squared Residuals, that is called: “Median Regression”. Also, an Iterative Reweighted Least Squared based on the Absolute Residuals as weights is performed here as another method to
... Show MoreDesign and build a center basins new p-type four mirrors were studied its effect on all parameters evaluating the performance of the solar cell silicon in the absence of a cooling system is switched on and noted that the efficiency of the performance Hzzh cell increased from 11.94 to 21 without cooling either with cooling has increased the efficiency of the
The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha
... Show MoreThis article proposes a new technique for determining the rate of contamination. First, a generative adversarial neural network (ANN) parallel processing technique is constructed and trained using real and secret images. Then, after the model is stabilized, the real image is passed to the generator. Finally, the generator creates an image that is visually similar to the secret image, thus achieving the same effect as the secret image transmission. Experimental results show that this technique has a good effect on the security of secret information transmission and increases the capacity of information hiding. The metric signal of noise, a structural similarity index measure, was used to determine the success of colour image-hiding t
... Show MoreThe study is dealing with an application reengineering process clean solar cells in the Ministry of electricity, as aimed at the possibility of the applicability and impact of re-engineering to achieve the level of performance of the Ministry's operations, with the application of the cleaning process solar cells, developed, improved and found a correlation, statistically significant effect between variable re-engineering and performance as well as the application of process reengineering clean solar cells:1- Before the re-engineering process the total time for cleaning up and solar cell 20 minutes and number of columns performed per day 24 columns and total columns750 which were completed per month that re
... Show MoreThe administration on the basis of the activities designed to evaluate the performance of activities in terms of cost, time and quality by identifying activities that add value and those that are no add value and enables the administration of making up their own continuous improvement in production, through lower costs and reduce the time and improve the quality and reduce the incidence of spoilage and waste, y based search Ally premise that (the continuous improvement of the adoption of management style on the basis of the activities helps management in decision-making wise to reduce costs) to prove the hypothesis has sought research to achieve its goal of Alkadivh and Alkoppelan &nb
... Show More