The distribution of chilled water flow rate in terminal unit is a major factor used to evaluate the performance of central air conditioning unit. In this work, a theoretical chilled water distribution in the terminal units has been studied to predict the optimum heat performance of terminal unit. The central Air-conditioning unit model consists of cooling/ heating coil (three units), chilled water source (chiller), three-way and two-way valve with bypass, piping network, and pump. The term of optimization in terminal unit ingredient has two categories, the first is the uniform of the water flow rate representing in statically permanents standard deviation (minimum value) and the second category is the maximum heat transfer rate from all terminal units. The hydraulic and energy equations governing the performance of unit solved with the aid of FORTRAN code with considering the following parameters: total water flow rate, chilled water supply temperature, and variable valve opening. It was found that the optimum solution of three-way valve case at 8°C water supply temperature, 0.12 kg/s total water flow rate and valve opening order (valve 1: 100%, valve 2: 100% and valve 3: 75%) with total heat rate (987.92 Watt) and standard deviation (1.181E-3). Also, for the two-way valve case the results showed that the optimum condition at 8°C water supply temperature, 0.12 kg/s total water flow rate and valve opening order (valve 1: 75%, valve 2: 75% and valve 3: 50%) with total heat rate and standard deviation (717Watt) and (5.69E-4) respectively.
Permeability estimation is a vital step in reservoir engineering due to its effect on reservoir's characterization, planning for perforations, and economic efficiency of the reservoirs. The core and well-logging data are the main sources of permeability measuring and calculating respectively. There are multiple methods to predict permeability such as classic, empirical, and geostatistical methods. In this research, two statistical approaches have been applied and compared for permeability prediction: Multiple Linear Regression and Random Forest, given the (M) reservoir interval in the (BH) Oil Field in the northern part of Iraq. The dataset was separated into two subsets: Training and Testing in order to cross-validate the accuracy
... Show MoreFlow-production systems whose pieces are connected in a row may not have maintenance scheduling procedures fixed because problems occur at different times (electricity plants, cement plants, water desalination plants). Contemporary software and artificial intelligence (AI) technologies are used to fulfill the research objectives by developing a predictive maintenance program. The data of the fifth thermal unit of the power station for the electricity of Al Dora/Baghdad are used in this study. Three stages of research were conducted. First, missing data without temporal sequences were processed. The data were filled using time series hour after hour and the times were filled as system working hours, making the volume of the data relativel
... Show MoreThe evaluation of residual stresses (RS) induced by the friction stir welding (FSW) process is crucial in anticipating the performance of the welded structure. The existence of such residual stresses within a friction stir welded structure may lead to excessive distortion and weakness to afford the applied external loads. To assess quantitatively the effect of these residual stresses generated by FSW process, the current paper implements a Coupled Eulerian–Lagrangian (CEL) finite element simulation to analyze both thermal and subsequent resulted remaining stress environments in dissimilar friction stir welding of AA6061-T6 and AA2024-T3 alloys. The thermal analysis step was conducted first and followed by a mechanical analysis step in whi
... Show MoreA group of acceptance sampling to testing the products was designed when the life time of an item follows a log-logistics distribution. The minimum number of groups (k) required for a given group size and acceptance number is determined when various values of Consumer’s Risk and test termination time are specified. All the results about these sampling plan and probability of acceptance were explained with tables.
The Estimation Of The Reliability Function Depends On The Accuracy Of The Data Used To Estimate The Parameters Of The Probability distribution, and Because Some Data Suffer from a Skew in their Data to Estimate the Parameters and Calculate the Reliability Function in light of the Presence of Some Skew in the Data, there must be a Distribution that has flexibility in dealing with that Data. As in the data of Diyala Company for Electrical Industries, as it was observed that there was a positive twisting in the data collected from the Power and Machinery Department, which required distribution that deals with those data and searches for methods that accommodate this problem and lead to accurate estimates of the reliability function,
... Show MoreIn this research, the focus was placed on estimating the parameters of the Hypoexponential distribution function using the maximum likelihood method and genetic algorithm. More than one standard, including MSE, has been adopted for comparison by Using the simulation method
In this research study theory to find the stress and emotion gases in the glass as a result of exposure to pulses of the laser beam has been the study using vehicles three major on-system axes cylindrical (r, 0, z), where I took three models of glass silica glass soda glass fused and shedtwo types of lasers where the study showed that the thermal stresses and emotions ...
ENGLISH