The design, construction and investigation of experimental study of two compound parabolic concentrators (CPCs) with tubular absorber have been presented. The performance of CPCs have been evaluated by using outdoor experimental measurements including the instantaneous thermal efficiency. The two CPCs are tested instantly by holding them on a common structure. Many tests are conducted in the present work by truncating one of them in three different levels. For each truncation the acceptance half angle (θc) was changed. Geometrically, the acceptance half angle for standard CPC is (26o). For the truncation levels for the other CPC 1, 2 and 3 the acceptance half angle were 20o, 26o and 59o, consequently. A significant difference between the instantaneous thermal efficiency of 3.86× CPC (θc=20o) and 2.32× CPC (θc=26o), and between that for 3.61× CPC (θc=26o) and 2.32× CPC (θc=26o). It's noticed that the difference between the instantaneous thermal efficiency of 2.32× CPC (θc=59o) and 2.32× CPC (θc=26o) is small compared with the difference of the first and second cases, the instantaneous thermal efficiency of 2.32× CPC (26o) was higher than those for other three CPCs. The experimental results show that the maximum thermal efficiency of the full 2.32×CPC (26o) is 0.708, the maximum thermal efficiency of the 3.93×CPC (15o), when it's truncated to 3.84× CPC (20o), 3.61× CPC (26o) and 2.32× CPC (59o) are 0.51, 0.52 and 0.66, respectively. As the concentration ratio decreases from (3.93× to 1×), the thermal efficiency, energy losses and optical efficiency increase from (0.47 to 63), (1.58 to 7.2 K.m2/W) and (0.494 to 0.797), respectively.
Abstract
The research aims to diagnose the reality of applying the eighth requirement (operation) of the business continuity management system according to the international standard (ISO 22301: 2019), in the General Tax Authority, which is related to planning, implementing and controlling specific processes and procedures to address risks and opportunities, and the research adopted the checklist of the standard ( ISO 22301: 2019), in obtaining information, to measure the extent of application and documentation, the percentages and the weighted arithmetic mean were relied upon, and the research reached a set of result
... Show MoreAbstract:
Since the railway transport sector is very important in many countries of the world, we have tried through this research to study the production function of this sector and to indicate the level of productivity under which it operates.
It was found through the estimation and analysis of the production function Kub - Duglas that the railway transport sector in Iraq suffers from a decline in the level of productivity, which was reflected in the deterioration of the level of services provided for the transport of passengers and goods. This led to the loss of the sector of importance in supporting the national economy and the reluctance of most passengers an
... Show MoreResearch includes evaluation of projects implemented and which entered into trial operation period in accordance with the evaluation criteria and of (cost, quality and time) to determine the size deviations gap for the sample of projects during the years of assessment (2011-2012-2013-2014) of each of the three evaluation criteria, and then followed by a calculation the size of the overall gap to the problem based on the research problem to determine deviations from the specific implementation of each project by answering several questions to answer turns out the reasons for these deviations occur.
The importance of research Focus on the evaluation of received projects from contractors executing the projec
... Show MoreThe research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreDiabetes mellitus type II is a disorder of metabolism and complex diseases affected by genetic environmental factors and associated with inflammation. The symptoms of type II diabetes develop gradually, which are associated with increased blood concentration of marker of the endothelial inflammatory factors. The expression of adhesion molecules, including E-selectin, intracellular adhesion molecule-1(ICAM-1) and vascular cell adhesion molecule-1 (VCAM-1) on the surface of vascular endothelial cells to help leukocyte stick to other surrounding tissues. Many researchers have made attempts to determine the significance of particular ABO phenotype for the susceptibility to diseases. Many reports show a strong association with the ABO blood grou
... Show MoreMedication safety is an important part of the comprehensive patient safety term. Medication safety is gaining more attention as the World Health Organization set the goal of decreasing medication harm by (50%) for the next 5 years when launching the third global challenge. Studying medication safety in the risk groups such as young ages, children are crucial to learn more about the effect of medicines in this risk group since they are not included in the clinical trials. Adverse drug reaction is defined as any harm resulted from the drug itself during medical process journey, while medication errors are any harm resulted from the treatment process rather than the drug or it is the result of the failure in a step of the treatment process
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show More