Preferred Language
Articles
/
alkej-26
Removal of Oil From Wastewater Using Walnut-Shell
...Show More Authors

 

The ability of pulverized walnut-shell to remove oil from aqueous solutions has been studied. It involves two-phase process which consists of using walnut-shell as a filtering bed for the accumulation and adsorption of oil onto its surface. Up to 96% oil removal from synthetic wastewater samples was achieved while tests results showed that 75% of oil can be removed from the actual wastewater discharged from Al- Duara refinery in the south of Baghdad.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Vertical Stress Prediction for Zubair Oil Field/ Case Study
...Show More Authors

Predicting vertical stress was indeed useful for controlling geomechanical issues since it allowed for the computation of pore pressure for the formation and the classification of fault regimes. This study provides an in-depth observation of vertical stress prediction utilizing numerous approaches using the Techlog 2015 software. Gardner's method results in incorrect vertical stress values with a problem that this method doesn't start from the surface and instead relies only on sound log data. Whereas the Amoco, Wendt non-acoustic, Traugott, average technique simply needed density log as input and used a straight line as the observed density, this was incorrect for vertical computing stress. The results of these methods

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Oil Sector in Iraq (Reality and Prospects) Economic Analysis
...Show More Authors

   The oil sector in Iraq suffered from several difficulties led to the decline and reduction of oil production and the deterioration of refineries and transport pipeline status in addition to the weakness of the technology side and the prevalence of financial and administrative corruption besides the high costs of rehabilitation of the oil sector and also administrative and institutional problems still ongoing. 

 In spite of Iraq's possession of vast oil wealth allows him to play an important role in the international energy market، he is still under the level. The production of oil doesn'<

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Introduction and Investigation into Oil Well Logging Operations (Review)
...Show More Authors

ole in all sta Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and fluids associated with

... Show More
View Publication
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stag

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of

... Show More
View Publication
Crossref
Publication Date
Sun Nov 26 2017
Journal Name
Journal Of Engineering
Experimental Investigation of Nano Alumina and Nano Silica on Strength and Consistency of Oil Well Cement
...Show More Authors

In oil and gas well cementing, a strong cement sheath is wanted to insure long-term safety of the wells. Successful completion of cementing job has become more complex, as drilling is being done in highly deviated and high pressure-high temperature wells. Use of nano materials in enhanced oil recovery, drilling fluid, oil well cementing and other applications is being investigated. This study is an attempt to investigate the effect of nano materials on oil well cement properties. Two types of nano materials were investigated, which are Nano silica (>40 nm) and Nano Alumina (80 nm) and high sulfate-resistant glass G cement is used. The investigated properties of oil well cement included compressive strength, thickening

... Show More
View Publication Preview PDF
Publication Date
Thu Jun 10 2021
Journal Name
Neuroquantology
Direct Yellow 8 Azo Removal by Bentonite Clay Solution: Experimental and Theoretical Studies
...Show More Authors

In the theoretical part, removal of direct yellow 8 (DY8) from water solution was accomplished using Bentonite Clay as an adsorbent. Under batch adsorption, the adsorption was observed as a function of contact time, adsorbent dosage, pH, and temperature. The equilibrium data were fitted with the Langmuir and Freundlich adsorption models, and the linear regression coefficient R2 was used to determine the best fitting isotherm model. thermodynamic parameters of the ongoing adsorption mechanism, such as Gibb's free energy, enthalpy, and entropy, have also been measured. The batch method was also used for the kinetic calculations, and the day's adsorption assumes first-order rate kinetics. The kinetic studies also show that the intrapar

... Show More
View Publication
Scopus Crossref
Publication Date
Thu Oct 28 2021
Journal Name
Albahith Alalami
The image of foreign oil companies operating in Iraq tothe public of Basra city / survey study
...Show More Authors

The research seeks to identify the image of foreign oil companies operating in Iraq among the public of Basra, and the research aims to clarify the mental image of foreign oil companies among the Iraqi public, and to identify the extent to which the Iraqi public benefit from the social responsibility programs offered by foreign oil companies and their contribution to improving the standard of living and services for the population. Nearby areas and society as a whole, the research is classified within descriptive research, and the researcher used the survey method for the Iraqi public in Basra governorate, which includes the areas in which these companies are located, and he used the scale tool to find out, so he distributed 600 que

... Show More
Publication Date
Fri Feb 28 2025
Journal Name
Iraqi Geological Journal
Assessing Acid Fracturing for Low-Permeability Carbonate Formation to Improve Oil Production
...Show More Authors

This study investigates the application of hydraulic acid fracturing to enhance oil production in the Mishrif Formation of the Al-Fakkah oilfield due to declining flow rates and wellhead pressures resulting from asphaltene deposition and inadequate permeability. Implementing acid fracturing, an established technique for low-permeability carbonate reserves, was essential due to the inadequacy of prior solvent cleaning and acidizing efforts. The document outlines the protocols established prior to and following the treatment, emphasizing the importance of careful oversight to guarantee safety and efficacy. In the MiniFrac treatment, 150 barrels of #30 cross-linked gel were injected at 25 barrels per minute, followed by an overflush wi

... Show More
View Publication Preview PDF
Scopus Crossref