To track scientific developments and achievements, for example, that (achieved) after the Second World War until this moment, make each of us in absolute amazement. He invented the computer, discovered the genetic factor (DNA), and discovered the drawing of the human genetic map, going up to the moon, penetrating outer space by satellites, getting close to distant planets, producing jet planes, microprocessors, and lasers, in addition to enabling a person to create a layer of The material is extremely thin and extremely imaginative. It has also become possible for a person to "dig lines that do not exceed 20 billion meters of thickness." The human being was also able to collect things an atom and build an efficient and high-precision con
... Show MoreThis work was conducted to study the treatment of industrial waste water, and more particularly those in the General Company of Electrical Industries.This waste water, has zinc ion with maximum concentration in solution of 90 ppm.
The reuse of such effluent can be made possible via appropriate treatments, such as chemical coagulation, Na2S is used as coagulant.
The parameters that influenced the waste water treatment are: temperature, pH, dose of coagulant and settling time.
It was found that the best condition for zinc removal, within the range of operation used ,were a temperature of 20C a pH value of 13 , a coagulant dose of 15 g Na2S /400ml solution and a settling time of 7 days. Under these conditions the zinc concentrat
Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie
This work was conducted to study the recovery of catalyst and desirable components from tar formed in phenol production unit and more particularly relates to such a method whereby better recovery of copper salts, phenol, benzoic acid and benzoate salts from tar by aqueous acid solution was accomplished.
The effect of solvent type, solvent concentration (5, 10, 15, 20, 25 and 30 wt%), agitation speed (100, 200, 300 and 400 rpm), agitation time (5, 10, 15, 20 and 25 min), temperature (90, 100, 110, 120, 130 and 140 oC) , phase ratio (1/1, 2/1, 3/1, 4/1 and 5/1) and number of extraction (1, 2, 3, 4, and 5) were examined in order to increase the catalyst and desirable components extraction.
Four types of solvent were used; hydrochloric
The aim of the research is to identify both the re-engineering of management processes and the strategic decision-making process in the research community and determine the nature of the correlation between the two variables and know the relationship between them to achieve the research goal. The researcher used a descriptive and analytical method. The research community consists of a group of professors and staff of the College of Education affiliated to the University of Mustansiriya in Baghdad, which their number were (45), the researcher has distributed the forms to all members of the sample, only (3) forms were excluded for invalidity and thus the number of forms approved in the analysis were (42) forms. The rese
... Show MoreThe research aims to evaluate the selected projects from the water Department of Baghdad, according to a standard for total quality management and to achieve this goal , adopted the case study method to get to know how close or turn away those projects in the management of Standard Malcolm Baldrige Award for Excellence in Quality Management its comprehensive one scales the world's most famous in this area , in order to draw a general framework to evaluate how project management can benefit from this approach to modern management , input from the entrances of the comprehensive management reform and development.
Be standard Malcolm Baldrige Award of several elements: - leadership , strategic planning , foc
... Show MoreA Geographic Information System (GIS) is a computerized database management system for accumulating, storage, retrieval, analysis, and display spatial data. In general, GIS contains two broad categories of information, geo-referenced spatial data and attribute data. Geo-referenced spatial data define objects that have an orientation and relationship in two or three-dimensional space, while attribute data is qualitative data that can be counted for recording and analysis. The main aim of this research is to reveal the role of GIS technology in the enhancement of bridge maintenance management system components such as the output results, and make it more interpretable through dynamic colour coding and more sophisticated visualization
... Show MoreAbstract
The hydrometallurgical method was used to platinum and palladium leaching with aqua regia solution (3HCl: HNO3). The leaching experiments were designed to obtain the optimum conditions by using Taguchi method with 16 experiments at three different factors (time, temperature and solid to liquid ratio), and each factor has four different levels. In this study, leaching the powder sample of catalytic converter that contains platinum and palladium was conducted on the basis of the formation of chloro complexes platinum and palladium (PtCl62-, PdCl42-) with different concentrations in the acidic solution. The optimum condi
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show More