Preferred Language
Articles
/
XxZvR4gBVTCNdQwCf3Zf
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Sat Jun 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Requirements of stress tests model and the possibility to apply in Iraqi banks exploratory study of the views of a sample of staff in the central Bank of Iraq .
...Show More Authors

Abstract

This research attempt to explain the essential aspects of one important model in management of Bank risks , that is (stress testing) , which increase the concentrate on it resulting the negative affects of Global financial crisis that it accuar in 2008 to study the application possibilities in iraqian banks to enhancing the safety and financial soundness Becuase the classical tools  in Risk management don’t give clear image on Banks ability  in facing risks, hence the Basel committee on Banking supervision focusing in agreement of Basel 2,3 on stress testing when it doing the internal capital adequacy assessment process (ICAAP) .

To achieving the reseach obje

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Aug 29 2014
Journal Name
American Journal Of Pharmacological Sciences
Efficacy and Safety of Ranibizumab Intravitreal Injections versus Laser Photocoagulation in Patients with Diabetic Macular Edema
...Show More Authors

View Publication
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Mon Mar 01 2021
Journal Name
Journal Of Management In Engineering
Identifying Pertinent Indicators for Assessing and Fostering Diversity, Equity, and Inclusion of the Construction Workforce
...Show More Authors

View Publication
Scopus (65)
Crossref (64)
Scopus Clarivate Crossref
Publication Date
Fri Jun 03 2022
Journal Name
International Journal Of Health Sciences
Corrosion risk assessment of the oil flow line in Southern Iraq
...Show More Authors

The risk assessment for three pipelines belonging to the Basra Oil Company (X1, X2, X3), to develop an appropriate risk mitigation plan for each pipeline to address all high risks. Corrosion risks were assessed using a 5 * 5 matrix. Now, the risk assessment for X1 showed that the POF for internal corrosion is 5, which means that its risk is high due to salinity and the presence of CO, H2S and POF for external corrosion is 1 less than the corrosion, while for Flowline X2 the probability of internal corrosion is 4 and external is 4 because there is no Cathodic protection applied due to CO2, H2S and Flowline X3 have 8 leaks due to internal corrosion so the hazard rating was very high 5 and could be due to salinity, CO2, fluid flow rate

... Show More
Preview PDF
Crossref
Publication Date
Thu Dec 13 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Assessment of Risk Factors among Renal FailurePatients in Baghdad Teaching Hospital
...Show More Authors

Objective(s): To identify the relationship between demographic characteristics of patients with renal
failure and to find out the relationship between some risk factors like (family history, alcohol drinking,
smoking and chronic disease) with renal failure patients.
Methodology: Case control study design was carried out in order to achieve the objectives of the
study by using the assessment technique in Baghdad teaching hospital from March 5
th, 2017 to October
10th
, 2017, The sample was (cases & control) sample, present study include 200 cases, 100 was case
study the patient who entered in Baghdad teaching hospital, while another 100 was control study. The
data was collected by interview questionnaire inc

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 29 2022
Journal Name
Current Trends In Geotechnical Engineering And Construction
Identify the Critical Risk Factors at the Tendering Phase in Iraq
...Show More Authors

Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Oct 29 2022
Journal Name
Current Trends In Geotechnical Engineering And Construction
Identify the Critical Risk Factors at the Tendering Phase in Iraq
...Show More Authors

Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has

... Show More
View Publication
Scopus Crossref
Publication Date
Mon Feb 25 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Impact of Using the Information Technology on The Audit Profession: A Study of the Sample of Auditor Viewpoints in Selected Arab Countries
...Show More Authors

This study aims to clarify areas of using information technology in accounting and its impact on the profession of auditors by reviewing the concept, types, areas and the importance of information technology and its implications on the audit profession as well as to clarify the extent of contribution of information technology in  developing of procedures of the audit profession and what its requirement, also this study aims to enhance the theoretical side by identifying the views of a sample of auditors in  Arab countries selected (Iraq, Syria, Jordan), for the extent of using of information technology in their work and level of their perception for the importance of that

View Publication Preview PDF
Crossref
Publication Date
Fri Dec 01 2023
Journal Name
Al-khwarizmi Engineering Journal
Secure Seaport Management System using Blockchain Technology
...Show More Authors

Worldwide, shipping documents are still primarily created and handled in the traditional paper manner. Processes taking place in shipping ports as a result are time-consuming and heavily dependent on paper. Shipping documents are particularly susceptible to paperwork fraud because they involve numerous parties with competing interests. With the aid of smart contracts, a distributed, shared, and append-only ledger provided by blockchain technology allows for the addition of new records. In order to increase maritime transport and port efficiency and promote economic development, this paper examines current maritime sector developments in Iraq and offers a paradigm to secure the management system based on a hyper-ledger fabric blockchain p

... Show More
View Publication Preview PDF
Scopus Crossref