Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
The risk assessment for three pipelines belonging to the Basra Oil Company (X1, X2, X3), to develop an appropriate risk mitigation plan for each pipeline to address all high risks. Corrosion risks were assessed using a 5 * 5 matrix. Now, the risk assessment for X1 showed that the POF for internal corrosion is 5, which means that its risk is high due to salinity and the presence of CO, H2S and POF for external corrosion is 1 less than the corrosion, while for Flowline X2 the probability of internal corrosion is 4 and external is 4 because there is no Cathodic protection applied due to CO2, H2S and Flowline X3 have 8 leaks due to internal corrosion so the hazard rating was very high 5 and could be due to salinity, CO2, fluid flow rate
... Show MoreRisk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show MoreCardiovascular disease (CVD) remains the leading cause of mortality in women. Estimating cardiovascular risk using prediction models is essential for guiding preventive strategies. Despite progress, conventional risk models still omit critical women-specific factors, limiting their accuracy. Precision medicine, supported by artificial intelligence, provides a framework to integrate these overlooked determinants. This approach may help close existing gaps in cardiovascular risk prediction. Sex-specific biomarkers that contribute to overall cardiovascular risk can be incorporated into risk assessment tools to improve prevention strategies, early detection, and personalized intervention. The integration of imaging-derived variables enh
... Show MoreObjective(s): To identify the relationship between demographic characteristics of patients with renal
failure and to find out the relationship between some risk factors like (family history, alcohol drinking,
smoking and chronic disease) with renal failure patients.
Methodology: Case control study design was carried out in order to achieve the objectives of the
study by using the assessment technique in Baghdad teaching hospital from March 5
th, 2017 to October
10th
, 2017, The sample was (cases & control) sample, present study include 200 cases, 100 was case
study the patient who entered in Baghdad teaching hospital, while another 100 was control study. The
data was collected by interview questionnaire inc
Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show MoreThe concept of training is no longer traditionally understood Limited organize traditional training courses, but has become a strategic choice in the investment and development of human resources system, attic trying to find the answer to the core problem of the study which
is the extent to which the training process, the traditional form that meets the needs of the company the development of intellectual capital.This research aimstostatementof the impact dimensions the training process(training role, support or top management , training programs, modern technology)of the in components Intellectual Capital(Human Capital, Structural Capital, Customer Capital) and provide the top management of the Company for the development of sci
... Show More