This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing i
... Show Moreالصيغة العامة للمعقدات الجديدة [M2(BDS)Cl4] الناتجة من تفاعل الليكاند الجديد] ن1,ن4-ثنائي(1أ –بنزو]د[ اميدازول-2-يل)-ن1,ن4-ثنائي(4-ثنائي مثيل امينو) بنزيل) سكسنمايد[ (BDS) مع الايونات الفلزية الكادميوم, الكوبلت, الزئبق, النحاس والنيكل. تم اشتقاق هذا الليكاند من تفاعل المواد الثلاث 4-(ثنائي ميثيل أمينو) بنزالدهيد، 2-أمينو بنزيميدازول، وكلوريد السكسينيل. تم تشخيص المركبات باستخدام مطيافية طيف الاشعة تحت الحمراء وطيف الرن
... Show More: The terrestrial snail Eobania vermiculata (O. F. Müller, 1774) were collected from three station in Baghdad Al- Karkh, Iraq between the period from June 2016 to July 2017. Then we studied the life cycle from the egg to maturity. We studied and photographed the external morphology of it’s shell to identified the species. This species was recorded for the first time in Baghdad.
The current study focuses on utilizing artificial intelligence (AI) techniques to identify the optimal locations of production wells and types for achieving the production company’s primary objective, which is to increase oil production from the Sa’di carbonate reservoir of the Halfaya oil field in southeast Iraq, with the determination of the optimal scenario of various designs for production wells, which include vertical, horizontal, multi-horizontal, and fishbone lateral wells, for all reservoir production layers. Artificial neural network tool was used to identify the optimal locations for obtaining the highest production from the reservoir layers and the optimal well type. Fo
n this study new derivatives of Schiff bases (5-10) were synthesized from the new starting material 1 . Which has been synthesized by the reaction of (1 mol.) of dichloroacetic acid with two moles of morpholine, in the presence of potassium hydroxide, Ester derivatives 2 and 3 were synthesized by the reaction of 1 with methanol or ethanol respectively in the presence of sulphuric acid as catalyst . Compound 2 was also prepared from dimethylsulphate with high yield , 2 and 3 was used to synthesized 2,2-dimorpholinylacetohydrazide 4 via reaction with NH2NH2.H2O 80% .Imines (5-10) were synthesized via the reaction of 4 with appropriate aromatic aldehydes in the presence of G.A.A as a catalyst . Derivatives compounds (1-10) were identifie
... Show MoreFreshwater mussels are a guild of stationary, suspended-feeding species; they perform significant ecological functions like nitrogen cycling, bioturbation that gives oxygen and habitat that other creatures need to survive, and increasing water clearance by filtration. Knowledge of the freshwater mussel Unio tigridis Bourguignat, 1852, distribution, and molecular study in Iraq was inadequate. In the current study, this species of freshwater Mussels belonging to the family Unionidae was collected from different locations in the Greater Zab River, from April 2022 to November 2022. The average water temperature of the site was arranged between (17.8 to 36.1 C°). All previous studies in the Kurdistan Region and Iraq were based on morphologic
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe
... Show More