Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance parameters (cost, schedule, quality, leadership, and change management). At the same time, most project control systems are currently applied through software like Primavera P6 or MS Project. These look at a project’s cost and schedule status by following the earned value analysis for finding the performance. Based on decision makers’ preferences, the analytic hierarchy process (AHP) may be used to arrive at the optimum conclusion. AHP approaches are discussed, including AHP, grey-AHP, fuzzy-AHP, and SFAHP weights comparison. Calculation results showed that the spherical fuzzy approach differs significantly from the other approaches where it considers the decision maker’s hesitation when making linguistic multicriteria decisions and then, as a result, recommends applying periodically for performance measurement. This model can be viewed as a valuable way to help the decision-making stakeholders in the construction sector do the best job about critical issues at a suitable time.
The current study was conducted on irrigational project called (Beat Zwena River), located in Jadedat- alshat, within the province of Dyala, which is divided from the right side of the Tigris River, the project significant environmental importance was passed in several agricultural areas estimated about 1600 acres, and it is also used for the purposes of irrigation and drinking. One of the major drawback for the current study is the almost lack data about the physiochemical parameter, in addition to measure (chlorophyll a and phyophtin of the River under investigation, in five locations for the period of October 2013 until June 2014. The range of studied properties was: 10.83 -38.75°C and 9.17 -28.5°C for air and water temperature,
... Show MoreThe water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met du
... Show MoreThe water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not
... Show MoreIn this paper , some of lexical stylistic , syntactical stylistic devices , and one phonetic stylistic device are going to be illustrated in the study of the aphorisms of “life and death” . These stylistic devices are parallelism , hyperbole , alliteration , meiosis , irony , oxymoron , cliché , litotes , metalepsis , and loose sentences. This paper aims at identifying the functions and the frequencies of these devices. These stylistic devices make one speech and writing more interesting and help to get the attention of readers/ listeners
The present work represents a theoretical study for the correction of spherical aberration of an immersion lens of axial symmetry operating under the effect of space charge, represented by a second order function and preassigned magnification conditions in a focusing of high current ion beams. The space charge depends strongly on the value of the ionic beam current which is found to be very effective and represents an important factor effecting the value of spherical aberration .The distribution of the space charge was measured from knowing it's density .It is effect on the trajectory of the ion beam was studied. To obtain the trajectories of the charged particles which satisfy the preassined potential the axial electrostatic potential w
... Show MoreThe fuzzy assignment models (FAMs) have been explored by various literature to access classical values, which are more precise in our real-life accomplishment. The novelty of this paper contributed positively to a unique application of pentagonal fuzzy numbers for the evaluation of FAMs. The new method namely Pascal's triangle graded mean (PT-GM) has presented a new algorithm in accessing the critical path to solve the assignment problems (AP) based on the fuzzy objective function of minimising total cost. The results obtained have been compared to the existing methods such as, the centroid formula (CF) and centroid formula integration (CFI). It has been demonstrated that operational efficiency of this conducted method is exquisitely develo
... Show MoreThe fuzzy assignment models (FAMs) have been explored by various literature to access classical values, which are more precise in our real-life accomplishment. The novelty of this paper contributed positively to a unique application of pentagonal fuzzy numbers for the evaluation of FAMs. The new method namely Pascal’s triangle graded mean (PT-GM) has presented a new algorithm in accessing the critical path to solve the assignment problems (AP) based on the fuzzy objective function of minimising total cost. The results obtained have been compared to the existing methods such as, the centroid formula (CF) and centroid formula integration (CFI). It has been demonstrated that operational efficiency of this conducted method is exquisitely deve
... Show MoreA number of pulsed experiments have been carried out using a high-voltage circuit containing R,L, and C in certain arrangements. A spherical spark gap of steel electrodes was used as a high-current switch operated by a voltage of up to 8kV and triggered in both self-triggering and third-electrode triggering modes. Current measurements were carried out by using both current-viewing resistor and Rogowski coils designed for this purpose. Typical current waveforms have shown obvious dominating inductance effect of the circuit components in an underdamped oscillation. The behavior of the circuit impedance was studied by recording both pulsed current peaks and the charging voltages when currents of up to 2.5kA were recorded. The dur
... Show MoreIn project management process, the objective is to define and develop a model for planning, scheduling, controlling, and monitoring different activities of a particular project. Time scheduling plays an important role in successful implementation of various activities and general outcome of project. In practice, various factors cause projects to suffer from time delay in accomplishing the activities. One important reason is imprecise knowledge about time duration of activities. This study addresses the problem of project scheduling in uncertain resource environments, which are defined by uncertain activity durations. The study presents a solution of the levelling and allocation problems for projects that have some uncertain ac
... Show More