Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreHadiths Fasting volunteer in the six books
The main aim of this study is to evaluate the remaining oil in previously produced zones, locate the water productive zone and look for any bypassed oil behind casing in not previously perforated intervals. Initial water saturation was calculated from digitized open hole logs using a cut-off value of 10% for irreducible water saturation. The integrated analysis of the thermal capture cross section, Sigma and Carbon/oxygen ratio was conducted and summarized under well shut-in and flowing conditions. The logging pass zone run through sandstone Zubair formation at north Rumaila oil field. The zones where both the Sigma and the C/O analysis show high remaining oil saturation similar to the open hole oil saturation, could be good oil zones that
... Show More