Preferred Language
Articles
/
VRZfR4gBVTCNdQwCJ3Zd
Six Sigma & Construction Safety
...Show More Authors

Publication Date
Mon Mar 07 2022
Journal Name
Construction Research Congress 2022
Impact of Green Construction on Safety Performance in the Built Environment
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Advances In Informatics And Computing In Civil And Construction Engineering: Proceedings Of The 35th Cib W78 2018 Conference: It In Design, Construction, And Management
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Sat Aug 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Case Study to Evaluate Work-Zone Safety Technologies in Highway Construction
...Show More Authors

View Publication
Scopus (15)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Applied Mechanics And Materials
Measure and Analyze the Problems of Concrete Mixture Production via Six Sigma DMAIC Tools: Central Concrete Mix Plant as a Case Study
...Show More Authors

The aims of this study are to measure the defect rate and analyze the problems of production of ready concrete mixture plant by using Six Sigma methodology which is a business strategy for operations improvement depending basically on the application of its sub-methodology DMAIC improvement cycle and the basic statistical tools where the process sigma level of concrete production in the case study was 2.41 σ.

View Publication
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Shift
Construction Safety Personnel Qualifications: The Impact of Education, Experience, and Certificate Programs
...Show More Authors

Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Construction Engineering And Management
Developing a Decision-Making Framework to Select Safety Technologies for Highway Construction
...Show More Authors

View Publication
Scopus (50)
Crossref (47)
Scopus Clarivate Crossref
Publication Date
Sun Jul 01 2018
Journal Name
Journal Of Construction Engineering And Management
Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach
...Show More Authors

View Publication
Scopus (66)
Crossref (51)
Scopus Clarivate Crossref
Publication Date
Tue May 09 2023
Journal Name
Buildings
Identification of Desired Qualifications for Construction Safety Personnel in the United States
...Show More Authors

Construction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio

... Show More
View Publication
Scopus (4)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Construction Research Congress
Exploratory Study of Potential Negative Safety Outcomes Associated with UAV-Assisted Construction Management
...Show More Authors

Scopus (9)
Scopus
Publication Date
Fri Apr 12 2019
Journal Name
Journal Of Economics And Administrative Sciences
Balanced Scorecard (BSC) role And Six Sigma in improving strategic performance A sample study of the members of the General Company for Northern Cement
...Show More Authors

Assessing performance efficiency is critical to the management need for oversight, planning, and continuous periodic evaluation of the multiple activities of Northern Cement State Company in order to determine the level of achievement of the objectives set, and to correct the deviations and delays that the evaluation shows and limitation of liability. What cannot be measured cannot be managed. The aim of this research is to highlight the impact of using BSC, financial and non-financial, to give comprehensive and clear picture of the company's performance and to measure the quality of its performance by using six-sigma and the level of deviations in achieving the planned goals. Therefore, four-key hypotheses were formulated for th

... Show More
View Publication Preview PDF
Crossref (1)
Crossref