The Prospective of Artificial Neural Network (ANN’s) Model Application to Ameliorate Management of Post Disaster Engineering Projects
...Show More Authors

Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practical solution for a problem occurring in a projects starting from individual self-development ending to the adaptation to information technology sector with a continuous posting in this world of information industry where as metaphor “needs is a cause of creativity”. This study focuses on the use of artificial neural networks ANN to find a solution to issues in projects delays and furthermore when there is no physical or mathematical solution found so far. ANN’s were used to build a model that helps in finding a solution for delays in some selected projects in Baghdad (as case study), and discussing the strategies of rebuilding plus delays in time and cost due to delay factors. 35 construction projects were chosen in Baghdad greater area, vary in sizes and types. Crew and laborers were targeted in sampling collection methodology basically throughout questionnaire forms of field survey as they were filled by them. ANN’s helped in modelling delays factors to help decision makers in an appropriate management of projects. External factors which includes disasters mentioning COVID-19 as the most important disaster ever happened in the last decades, were the most important factor that caused delay in time and cost of projects implementation processes where this factor was controlling the other major factors such as contractor failure, redesigning, changing orders, security issues, low prices, besides weather issues and owner failure.

Crossref
View Publication
Publication Date
Fri Mar 29 2024
Journal Name
Iraqi Journal Of Science
The Simulation Technique to Estimate the Parameters of Generalized Exponential Rayleigh Model
...Show More Authors

     The paper shows how to estimate the three parameters of the generalized exponential Rayleigh distribution by utilizing the three estimation methods, namely, the moment employing estimation method (MEM), ordinary least squares estimation method (OLSEM),  and maximum entropy estimation method (MEEM). The simulation technique is used for all these estimation methods to find the parameters for the generalized exponential Rayleigh distribution. In order to find the best method, we use the mean squares error criterion. Finally, in order to extract the experimental results, one of object oriented programming languages visual basic. net was used

View Publication Preview PDF
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Political Sciences Journal
The political dimension Engineering social characteristics and Alssayashllansan community
...Show More Authors

تستهدف هذه الدراسة وبشكل أساس، الكشف عن طبيعة وخصائص البعد السياسي لهندسة/صناعة الخصائص الاجتماعية والسياسية للإنسان والمجتمع، بوصفها العملية المسؤولة عن تصميم هذه الخصائص وصناعتها وتغييرها جزئيا أو كليا، دون أبعادها الأخرى المتعددة والمتنوعة، لا لمجرد الانسياق وراء دوافع الرغبة الذاتية، أو اعتبارات التخصص الدقيق وأحكامه، لأن معهما أيضا، بل وقبلهما أحيانا، دوافع واعتبارات أخرى موضوع

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Aug 01 2021
Journal Name
International Journal Of Mechanical Engineering And Robotics Research
International Journal of Mechanical Engineering and Robotics Research
...Show More Authors

This paper proposes feedback linearization control (FBLC) based on function approximation technique (FAT) to regulate the vibrational motion of a smart thin plate considering the effect of axial stretching. The FBLC includes designing a nonlinear control law for the stabilization of the target dynamic system while the closed-loop dynamics are linear with ensured stability. The objective of the FAT is to estimate the cubic nonlinear restoring force vector using the linear parameterization of weighting and orthogonal basis function matrices. Orthogonal Chebyshev polynomials are used as strong approximators for adaptive schemes. The proposed control architecture is applied to a thin plate with a large deflection that stimulates the axial loadi

... Show More
View Publication Preview PDF
Crossref (36)
Crossref
Publication Date
Thu Dec 01 2022
Journal Name
Kirkuk University Journal For Agricultural Sciences
Contributions of small income-generating projects to the empowerment of rural women socially and economically in Al-Hamdaniya District / Nineveh Governorate
...Show More Authors

The current research aims to identify the contributions of small income-generating projects in theempowerment of rural women in Nineveh Governorate ,Al-Hamdaniya district, as a simplerandom sample was drawn from the research community of 280 respondents , according to theRobert Mason equation at the level of significance 0.05, so the sample size was 162 respondents,i.e. a percentage 58% collected the necessary data using a questionnaire prepared as a basic toolfor data collection consisting of 20 items distributed on two axes ,and the results of the researchwere analyzed and presented using the spss statistical program, as well as manual analysis usingrepetitions, the weighted mean, the standard deviation, and the percentage weight. And the

... Show More
View Publication Preview PDF
Publication Date
Fri May 01 2020
Journal Name
Civil Engineering Journal
Post-Fire Behavior of Post-Tensioned Segmental Concrete Beams under Monotonic Static Loading
...Show More Authors

This paper presents a study to investigate the behavior of post-tensioned segmental concrete beams that exposed to high-temperature. The experimental program included fabricating and testing twelve simply supported beams that divided into three groups depending on the number of precasting concrete segments. All specimens were prepared with an identical length of 3150 mm and differed in the number of the incorporated segments of the beam (9, 7, or 5 segments). To simulate the genuine fire disasters, nine out of twelve beams were exposed to a high-temperature flame for one hour. Based on the standard fire curve (ASTM – E119), the temperatures of 300◦C (572◦F), 500◦C (932◦F), and 700◦C (1292◦F) were adopted. Consequently,

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Fri May 01 2020
Journal Name
Civil Engineering Journal
Post-Fire Behavior of Post-Tensioned Segmental Concrete Beams under Monotonic Static Loading
...Show More Authors

This paper presents a study to investigate the behavior of post-tensioned segmental concrete beams that exposed to high-temperature. The experimental program included fabricating and testing twelve simply supported beams that divided into three groups depending on the number of precasting concrete segments. All specimens were prepared with an identical length of 3150 mm and differed in the number of the incorporated segments of the beam (9, 7, or 5 segments). To simulate the genuine fire disasters, nine out of twelve beams were exposed to a high-temperature flame for one hour. Based on the standard fire curve (ASTM – E119), the temperatures of 300◦C (572◦F), 500◦C (932◦F), and 700◦C (1292◦F) were adopted. Consequently,

... Show More
Crossref (1)
Crossref
Publication Date
Tue Jan 19 2021
Journal Name
Sn Applied Sciences
Post-fire serviceability and residual strength of composite post-tensioned concrete T-beams
...Show More Authors
Abstract<p>In this study, the response of ten composite post-tensioned concrete beams topped by a reinforced concrete deck with adequate reinforcing shear connectors is investigated. Depending on the concrete compressive strength of the deck slab (20, 30, and 40 MPa), beams are grouped into three categories. Seven of these beams are exposed to a fire attack of 700 and 800 °C temperature simultaneously with or without the presence of a uniformly distributed sustained static loading. After cooling back to ambient temperature, these composite beams are loaded up to failure, using a force control module, by monotonic static loading in a four-point-bending setup with two symmetrical concentrated loads applied in </p> ... Show More
View Publication Preview PDF
Scopus (8)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Tue Jan 19 2021
Journal Name
Sn Applied Sciences
Post-fire serviceability and residual strength of composite post-tensioned concrete T-beams
...Show More Authors
Abstract<p>In this study, the response of ten composite post-tensioned concrete beams topped by a reinforced concrete deck with adequate reinforcing shear connectors is investigated. Depending on the concrete compressive strength of the deck slab (20, 30, and 40 MPa), beams are grouped into three categories. Seven of these beams are exposed to a fire attack of 700 and 800 °C temperature simultaneously with or without the presence of a uniformly distributed sustained static loading. After cooling back to ambient temperature, these composite beams are loaded up to failure, using a force control module, by monotonic static loading in a four-point-bending setup with two symmetrical concentrated loads applied in </p> ... Show More
Crossref (6)
Crossref
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Measurement of economic returns and environmental and social for green sector trade A prospective study in institutions of Basra to focus on the electricity sector
...Show More Authors

        Environmental risk growing Become challenge "and a matter of controversy and concern to many of those concerned with environment, social, economic, and the same happens with the administrative rather than in isolation for this movement, as the issues of climate change Disturbed and troubled him, especially after what caused the risk of destruction, and irresponsibility , chaos, and the futility of resources, crops, fields,  nature and homes and reactors, and after what happened in Japan from the scourge of "Hurricane tsunami " and earthquakes successive accompanied him and what became of him by surprise catastrophic affected the economy and the univ

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref