Preferred Language
Articles
/
ThhNdZUBVTCNdQwCrC6T
Determination of Pollutants in Water Treatment for Petroleum Refinery
...Show More Authors

Dora petroleum refinery waste water is the one of the important source of pollution by priority pollutant aromatic compound discharged to Tigris river in Iraq. the station has waste water treatment unit contains many treatment subunits The most important sub units is :skimmer units ,physiochemical unit ,daf unit, biological unit. The aim of research project is to study the ability of unit to remove the priority pollutant aromatic compound and follow up these compounds in river to study ability of river to self removal. A solid phase extraction (SPE) followed by high performance liquid chromatography-ultra violet (HPLC-UV) technique is depicted for the quantitative estimation of benzidines and phenols. Experimental studies were performed to detect the optimum oxidation conditions for benzidine and phenol. The enzymatic method and the use of soybean peroxidase enzyme for the continuous removal of the molecules enable to provide simple and alternative method to the traditional methods used for removal of hazardous aromatic compounds including the phenol and benzidine studied here.

Publication Date
Fri Apr 01 2016
Journal Name
Water
The Effect of UV and Combined Chlorine/UV Treatment on Coliphages in Drinking Water Disinfection
...Show More Authors

View Publication
Scopus (40)
Crossref (31)
Scopus Clarivate Crossref
Publication Date
Wed Mar 30 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Crystallization Process as a Final Part of Zero Liquid Discharge System for Treatment of East Baghdad Oilfield Produced Water
...Show More Authors

This study investigated the application of the crystallization process for oilfield produced water from the East Baghdad oilfield affiliated to the Midland Oil Company (Iraq). Zero liquid discharge system (ZLD) consists of several parts such as oil skimming, coagulation/flocculation, forward osmosis, and crystallization, the crystallization process is a final part of a zero liquid discharge system. The laboratory-scale simple evaporation system was used to evaluate the performance of the crystallization process. In this work, sodium chloride solution and East Baghdad oilfield produced water were used as a feed solution with a concentration of 177 and 220 g/l. The impact of temperature (70, 80, and 90 °C), mixing speed (300, 400, and 500

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Mar 30 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Crystallization Process as a Final Part of Zero Liquid Discharge System for Treatment of East Baghdad Oilfield Produced Water
...Show More Authors

This study investigated the application of the crystallization process for oilfield produced water from the East Baghdad oilfield affiliated to the Midland Oil Company (Iraq). Zero liquid discharge system (ZLD) consists of several parts such as oil skimming, coagulation/flocculation, forward osmosis, and crystallization, the crystallization process is a final part of a zero liquid discharge system. The laboratory-scale simple evaporation system was used to evaluate the performance of the crystallization process. In this work, sodium chloride solution and East Baghdad oilfield produced water were used as a feed solution with a concentration of 177 and 220 g/l. The impact of temperature (70, 80, and 90 °C), mixing speed (300, 400, and 500 rp

... Show More
Preview PDF
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Evaluation the turbidity removal efficiency in Al-Wahda water treatment plant using statistical indicators
...Show More Authors
Abstract<p>Most of drinking water consuming all over the world has been treated at the water treatment plant (WTP) where raw water is abstracted from reservoirs and rivers. The turbidity removal efficiency is very important to supply safe drinking water. This study is focusing on the use of multiple linear regression (MLR) and artificial neural network (ANN) models to predict the turbidity removal efficiency of Al-Wahda WTP in Baghdad city. The measured physico-chemical parameters were used to determine their effect on turbidity removal efficiency in various processes. The suitable formulation of the ANN model is examined throughout many preparations, trials, and steps of evaluation. The predict</p> ... Show More
View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sun Dec 04 2011
Journal Name
Baghdad Science Journal
Effect of Magnetic Treatment of water for irrigation and seed Qualities of the Plant vegetative growth corundum oriandrum sativum of
...Show More Authors

Cultured fruits of theCorundum Coriandrum sativum were sown On 11/11 / 2008 in basins containing 15 kg of soil (Silty Loam) .Fruits were divided into two parts the first was soaked in normanl water and the second was magnetized for a period of 24 hours Irrigation was up to (75% of capacity field.Two types of water (normal water and magnetized water)with three repetitions were used the access to magnetic water was supplied from a special electric device. Recorded measurements were plant height the number of stems / plant, weight of plant, number of flowers, 1000 seed weight) during the cultivation period, which ended on 11/5/2009. Results indicated the absence of any effect of magnetic water on plant growth of Fenugreek while seeds tre

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Sep 30 2008
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Impact of Tigris River Pollution on the Performance of Water Treatment Plants Efficiencies in Baghdad City
...Show More Authors

The determination of river pollution impact on the performance of water treatment plants is achieved by two main objectives. The first is to study raw and treated water qualities and comparing them with standards and the second is to evaluate the treatment plants efficiency. The analyzed data were those water quality parameters in relation to physical, chemical and bacteriological characteristics for river water and produced water by seven water treatment plants located on Tigris River passing through Baghdad City.
The results of this study indicated that all raw water characteristic are within the surface water standards established by Iraqi and USA criteria except Bacterial Counts.
Tigris River water is of good quality to be trea

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Engineering
Upgrading of Alum Preparation and Dosing Unit for Sharq Dijla Water Treatment Plant by Using Programmable Logic Controller System
...Show More Authors

One of the important units in Sharq Dijla Water Treatment Plant (WTP) first and second extensions are the alum solution preparation and dosing unit. The existing operation of this unit accomplished manually starting from unloading the powder alum in the preparation basin and ending by controlling the alum dosage addition through the dosing pumps to the flash mix chambers. Because of the modern trend of monitoring and control the automatic operation of WTPs due to the great benefits that could be gain from optimum equipment operation, reducing the operating costs and human errors. This study deals with how to transform the conventional operation to an automatic monitoring and controlling system depending on a Programmable

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 01 2022
Journal Name
Journal Of Engineering
Performance Evaluation the Turbidity Removal Efficiency of AL-Muthana Water Treatment Plant
...Show More Authors

Turbidity is a visual property of water that expresses the amount of suspended substances in the water. Its presence in quantities more significant than the permissible limit makes the water undrinkable and reduces the effectiveness of disinfectants in treating pathogens. On this basis, turbidity is used as a basic indicator for measuring water quality. This study aims to evaluate the removal efficiency of AL- Muthanna WTP. Water turbidity was used as a basic parameter in the evaluation, using performance improvement evaluation and data from previous years (2016 to 2020). The average raw water turbidity was 26.7 NTU, with a minimum of 14 NTU, with a maximum of 48 NTU. Water turbidity value for 95% of settling daily reading data was

... Show More
Crossref (5)
Crossref
Publication Date
Tue Mar 01 2022
Journal Name
Journal Of Engineering
Performance Evaluation the Turbidity Removal Efficiency of AL-Muthana Water Treatment Plant
...Show More Authors

Turbidity is a visual property of water that expresses the amount of suspended substances in the water. Its presence in quantities more significant than the permissible limit makes the water undrinkable and reduces the effectiveness of disinfectants in treating pathogens. On this basis, turbidity is used as a basic indicator for measuring water quality. This study aims to evaluate the removal efficiency of AL- Muthanna WTP. Water turbidity was used as a basic parameter in the evaluation, using performance improvement evaluation and data from previous years (2016 to 2020). The average raw water turbidity was 26.7 NTU, with a minimum of 14 NTU, with a maximum of 48 NTU. Water turbidity value for 95% of settling daily readi

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Wed Aug 01 2018
Journal Name
Ecotoxicology And Environmental Safety
Biochemical and molecular alterations in freshwater mollusks as biomarkers for petroleum product, domestic heating oil
...Show More Authors

View Publication
Scopus (6)
Crossref (7)
Scopus Clarivate Crossref