Experimental and numerical analysis of piled raft foundation with different length of piles under static loads
...Show More Authors

In order to understand the effect of (length of pile / diameter of pile) ratio on the load carrying capacity and settlement reduction behavior of piled raft resting on loose sand, laboratory model tests were conducted on small-scale models. The parameters studied were the effect of pile length and the number of piles. The load settlement behavior obtained from the tests has been validated by using 3-D finite element in ABAQUS program, was adopted to understand the load carrying response of piled raft and settlement reduction. The results of experimental work show that the increase in (Lp/dp) ratio led to increase in load carrying capacity by piled raft from (19.75 to 29.35%), (14.18 to 28.87%) and (0 to 16.49%) , the maximum load carried by piles decrease from (9.1 to 22.72%), (15.79 to 47.37%) and (44 to 81.05%) and the response of settlement piled raft decrease from (16.67 to 23.33%), (9.09 to 39.39%) and (30%) with increase the number of piles from 4 to (6 and 9) and (length of pile / diameter of pile) ratio increase to (14.14 and 21.2), respectively. The numerical and model test results are found to be in a good agreement

Publication Date
Tue Oct 24 2023
Journal Name
Chemical Engineering & Technology
Electrodeposition of Manganese Dioxide under Different Conditions: Application of MnO<sub>2</sub>/Carbon Fibers in the Electrosorption Process
...Show More Authors
Abstract<p>Anodic electrodeposition was used to synthesize a composite electrode of nanostructured manganese dioxide/carbon fiber (CF) galvanostatically. Different characterization results of the nanostructured MnO<sub>2</sub> were obtained by varying the H<sub>2</sub>SO<sub>4</sub> concentration and the current density. Field emission scanning electron microscopy, X‐ray diffraction, and atomic force microscopy were utilized to characterize the prepared composite electrodes. The best conditions were: 0.3 mA cm<sup>−2</sup> current density and 0.64 M H<sub>2</sub>SO<sub>4</sub> concentration. The electrosorption performance of the MnO<sub></sub></p> ... Show More
View Publication
Scopus (3)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Engineering
Experimental Study on Tribological Characteristics of AA 6061 Alloy Reinforced with Al2O3 and B4C Particles
...Show More Authors

Two different composite materials were prepared by stir casting method of AA 6061 alloy as a matrix reinforced with two addition different ceramic materials Al2O3 and B4C of grain size   20 µm by 2.5, 5, 7.5 and10% in weight. The composite material with aluminum alloy as a matrix possesses a unique mechanical properties such as: high specific strength and hardness, low density, and high resistance to corrosion and friction wear. This composite is widely used in automotive parts space and marine applications.

Pin-on-disc technique was used to calculate the wear rate for each addition of Al2O3 and B4C particles. Rockwell hardness test and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Materials Today: Proceedings
Experimental and theoretical investigations of seepage reduction through zoned earth dam material with special core
...Show More Authors

View Publication
Scopus (24)
Crossref (13)
Scopus Clarivate Crossref
Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Engineering
Correction Factor for Methods of Installation of Piles Group in Sandy Iraqi Soils
...Show More Authors

Many problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying ca

... Show More
View Publication Preview PDF
Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Engineering | University Of Baghdad
Correction Factor for Methods of Installation of Piles Group in Sandy Iraqi Soils
...Show More Authors

Many problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying capacity of piled raft

... Show More
Publication Date
Mon May 01 2023
Journal Name
Journal Of Engineering
Evaluation the behavior of Ring Footing on Gypseous Soil Subjected to Eccentric and Inclined Loads
...Show More Authors

An extensive program of laboratory testing was conducted on ring footing rested on gypseous soil brought from the north of Iraq (Salah El-Deen governorate) with a gypsum content of 59%. There are limited researches available, and even fewer have been done experimentally to understand how to ring footings behave; almost all the previous works only concern the behavior of ring footing under vertical loads, Moreover, relatively few studies have examined the impact of eccentric load and inclined load on such footing. In this study, a series of tests, including dry and wet tests, were carried out using a steel container (600×600×600) mm, metal ring footing (100 mm outer diameter and 40 mm inner diameter) was placed in the m

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Serviceability of Post-fire RC Rafters with Openings of Different Sizes and Shapes
...Show More Authors

This study deals with the serviceability of reinforced concrete solid and perforated rafters with openings of different shapes and sizes based on an experimental study that includes 12 post-fire non-prismatic reinforced concrete beams (solid and perforated). Three groups were formed based on heating temperature (room temperature, 400 °C, and 700 °C), each group consisting of four rafters (solid, rafters with 6 and 8 trapezoidal openings, and rafter with eight circular openings) under static loading. A developed unified calculation technique for deflection and crack widths under static loading at the service stage has been provided, which comprises non-prismatic beams with or without opening exposed to flexure concentra

... Show More
View Publication Preview PDF
Scopus (18)
Crossref (8)
Scopus Crossref
Publication Date
Sun May 01 2016
Journal Name
Istanbul Bridge Conference.- Turkey
Strengthening and Load Testing for Short Span Steel Bridge for Abnormal Loads
...Show More Authors

The steel jetty selected for strengthening is in Baghdad city, over Tigris River, consists of 55 short spans, each of approximately 4 meters and one naviga-tional opening of 12 m. The bridge is 224 meters length and 8 meters in width. The strengthening system was designed to remove overstresses that occurred when the bridge was subjected to abnormal loads of 380 tons. A strengthening system which installed in spring 2008 was used where the main concept is to depend on added side supporting elements which impose reversal forces on the bridge to counteract most of the loads expected from the abnormal heavy loads. The bridge was load tested before and after the strengthening system was activated. The load test results indicate that the strengt

... Show More
Publication Date
Thu Sep 01 2022
Journal Name
Civil Engineering And Architecture
Strengthening AL-Kadhimin Tilted Minaret by Using a System of Micro-piles
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Thu Sep 24 2026
Journal Name
Modern Sport
relationship between explosive power and length accurately by the performance of weavy sending skill in volleyball
...Show More Authors

View Publication