Preferred Language
Articles
/
RYYBLoYBIXToZYALsX5I
Feasibility of Gas Lift to Increase Oil Production in an Iraqi Giant Oil Field
...Show More Authors
Abstract<p>Gas lift is one of the artificial lift techniques which it is frequently implemented to raise oil production. Conventionally, the oil wells produce depending on the energy of reservoir pressure and solution gas which declines due to continuous production. Therefore, many oil wells after a certain production time become unable to lift oil to the surface. Thus, the continuity of production requires implementation of gas lift which works to decrease the average fluid density in the tubing by injection gas through the annulus into the tubing. This paper aims to get maximum oil production of an Iraqi giant oil field at optimum injected gas rate. The field is located in south of Iraq and includes 67 wells.</p><p>In this paper, new model is designed to matching PVT data, matching vertical pressure drop calculations, making sensitivity analysis of wellhead temperature variation, making sensitivity analysis of productivity index variation, achievement of optimum design of gas lift and finding optimum values of oil production and injected gas rate.</p><p>The gas lift design is implemented within two cases. The first case aims to get the maximum oil production using flowing bottom hole pressure cut off as 50 psi above the bubble point pressure at certain depth. Whereas in the second plan, the same cut off value is maintained while keeping the injected gas oil ratio below or equals 350 SCF/STB. The two constraints are applied according to the policy of the operating company for the field under study.</p><p>This results show the implementation of the gas lift technique can increase oil production from 64379 STB/D to 302712 STB/D in the first case and to 272359 STB/D in the second case. In addition, 45 ceased wells were brought to production by implementation of the gas lift. The model predicts that the required injected gas rates to produce the new production are 186.3 MMSCF/D and 74.606 MMSCF/D in the first and second cases respectively. The main conclusions lead to the application of gas lift technique for this reservoir can increase the oil production volume significantly.</p>
Scopus Crossref
Publication Date
Sun Jan 01 2017
Journal Name
Spe
SPE-188966-MS: Drilling problems detection in Basrah oil fields using smartphones
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sun Oct 20 2024
Journal Name
Chemical Papers
Response surface methodology for optimizing crude oil desalting unit performance in iraq
...Show More Authors

View Publication
Scopus (2)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Materials Today: Proceedings
Investigating the use of lean manufacturing techniques in liquid batteries production: A field research in Babylon plants
...Show More Authors

View Publication
Scopus (4)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Educational And Psychological Researches
Obstacles to development in the field of education
...Show More Authors

Education is the most powerful and important weapon in fighting poverty and unemployment because it provides students with new skills that appropriate the new market requirements and fair distribution of natural resources. It also transfers knowledge, skills, and ethics over generations. Education aims to create effective leaders who go under training and rehabilitation process, create a new human and instill faith, generate the creativity and innovation, and keep abreast with scientific process, updating curriculum, and finally, applying the technical education

View Publication Preview PDF
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Gas Flow Formation in the Inertial Filtering (IF) Gas Separators Curvilinear Channels
...Show More Authors

This paper deals with an up to date problem for oil and gas industry- separation of the gas -fluid fogs. Here is described the worked out physical model of the gas movement process in the sections of the inertial filtering (IF) gas separators. One can find the mathematical model for research of the fields of velocities and pressures in the inertial curvilinear channel. The main simplifications and assumptions are explained. This mathematical model has been made using mathematical program Maple and it is received the 3-d graphic of the distribution componential speed parts in the channel and also 2-d graphics at the channel sectional view when the flow is flat. The new method for gas - fluid systems separation is suggested.

View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Sustainability in the design of liquefied petroleum gas systems used in buildings
...Show More Authors
Abstract<p>With the spread of the use of liquefied petroleum gas (LPG) in developing countries for use in domestic cooking with the increase in the expansion and distribution of gas pipelines for residential buildings, the 2002 World Summit focused on sustainable development in clean energy for natural gas (NG) and LPG. The research aims to focus on the important aspects of design sustainability from an environmental point of view to reduce gas leakage, accidents, and explosions that occur socially to expand the distribution of LPG and motivate the consumers to use it instead of natural gas and other fuels, and from an economic point of view to take into account the annual cost and aesthetic imp</p> ... Show More
View Publication
Scopus Clarivate Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Introduction and Investigation into Oil Well Logging Operations (Review)
...Show More Authors

ole in all sta Oil well logging, also known as wireline logging, is a method of collecting data from the well environment to determine subterranean physical properties and reservoir parameters. Measurements are collected against depth along the well's length, and many types of wire cabling tools depend on the physical property of interest. Well probes generally has a dynamic respon to changes in rock layers and fluid composition. These probes or well logs are legal documents that record the history of a well during the drilling stages until its completion. Well probes record the physical properties of the well, which must then be interpreted in petrographic terms to obtain the characteristics of the rocks and fluids associated with

... Show More
View Publication
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three-stag

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of

... Show More
View Publication
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determining Optimum Oil Separator Size and Optimum Operating Pressure
...Show More Authors

The optimum separators operating pressure is determined by using flash calculations and equilibrium ratios. In this study, the optimum separator size for Jambur field is calculated by using equations introduced by Arnold and Stewart and API12J Specification [1]. Because Jambur field has a high production rate two conditions are taken in the study to determine separator size, first based on production rate 80,000 bbl/day and second based on split the production between two banks A and B (40,000 bbl/day for each bank). The calculation resulted in optimum separator pressure for the first stage of 700 psi, and the second stage of 300 psi, and the third stage of 120 psi. The results show that as the number of stages increased above three

... Show More
View Publication Preview PDF
Crossref