<span lang="EN-US">The fundamental of a downlink massive multiple-input multiple-output (MIMO) energy- issue efficiency strategy is known as minimum mean squared error (MMSE) implementation degrades the performance of a downlink massive MIMO energy-efficiency scheme, so some improvements are adding for this precoding scheme to improve its workthat is called our proposal solution as a proposed improved MMSE precoder (PIMP). The energy efficiency (EE) study has also taken into mind drastically lowering radiated power while maintaining high throughput and minimizing interference issues. We further find the tradeoff between spectral efficiency (SE) and EE although they coincide at the beginning but later their interests become conflicting and divergent then leading EE to decrease so gradually while SE continues increasing logarithmically. The results achieved that for a single-cellular massive MU-MIMO downlink model, our PIMP scheme is the appropriate scenario to achieve higher precoding performance system. Furthermore, both maximum ratio transmission (MRT) and PIMP are suitable for performance improvement in massive MIMO results of EE and SE. So, the main contribution comes with this work that highest EE and SE are belong to use a PIMP which performs better appreciably than MRT at bigger ratio of number of antennas to the number of the users. </span>
Priority of road maintenance can be viewed as a process influenced by decision-makers with varying decision-making power. Each decision-maker may have their view and judgment depending on their function and responsibilities. Therefore, determining the priority of road maintenance can be thought of as a process of MCDM. Regarding the priority of road maintenance, this is a difficult MCDM problem involving uncertainty, qualitative criteria, and possible causal relationships between choice criteria. This paper aims to examine the applicability of multiple MCDM techniques, which are used for assessing the priority of road maintenance, by adapting them to this sector. Priority of road maintenance problems subject to internal
... Show MoreThe current research aims to identify the multiple intelligences in the fourth students’ acquisition of the literary processes of Arabic grammar and to identify the differences in multiple intelligence according to gender (males - females). The study was determined for students of the fourth literary preparatory Al-Hakim Preparatory (for males) and Rabat Preparatory (for females) of the Second Karkh Education Directorate, topics from the Arabic grammar subject (past tense, present tense, imperative, subject, and object) for the first semester of the academic year 2019-2020. The results showed that there were no statistically significant differences at the significance level (0.05) between the average scores of the students who were tau
... Show MoreThe aim of the research is to examine the multiple intelligence test item selection based on Howard Gardner's MI model using the Generalized Partial Estimation Form, generalized intelligence. The researcher adopted the scale of multiple intelligences by Kardner, it consists of (102) items with eight sub-scales. The sample consisted of (550) students from Baghdad universities, Technology University, al-Mustansiriyah university, and Iraqi University for the academic year (2019/2020). It was verified assumptions theory response to a single (one-dimensional, local autonomy, the curve of individual characteristics, speed factor and application), and analysis of the data according to specimen partial appreciation of the generalized, and limits
... Show MoreThe study aimed to investigate the relationship between the multiple intelligence and the numerical sense. The chosen population of the study was the 4th secondary stage students. The sample consisted of 400 female and male student. The researcher utilized two test; multiple intelligence test which include three categories of intelligence (logical-mathematical, spatial, and linguistics) consisted of (36) item, and the numerical sense test that consisted of (44) item. The two tests were constructed by the researcher himself. The psychometric properties of the test were also verified. The results showed that there was a correlation between the multiple intelligence and the numerical sense as well as the students’ means scores
... Show MoreMultiple sclerosis (MS) is a neuro-inflammatory disorder in which the Epstein-Barr virus (EBV) is proposed to have a pathogenic role. Therefore, a case-control study was performed (93 patients with relapsing-remitting MS and 113 healthy controls (HC) to analyze the prevalence and viral load of EBV infection using real time-polymerase chain reaction. Prevalence of EBV infection was lower in patients compared to HC but the difference was not significant (12.9 vs. 21.2%; probability [p] = 0.187). EBV-positive MS cases were more common in females than in males (83.3 vs. 16.7%), while an opposite distribution was observed in HC (37.5 vs. 62.5%), and the difference was significant (p = 0.041). Blood group O frequency was higher in EBV-p
... Show MoreThe provision of openings in serviceable reinforced concrete beams may result in a substantial decline in the beam's capacity and integrity, indicating the necessity of opening strengthening. The present study investigates the experimental response of reinforced concrete T-beams with multiple web-strengthened openings disposed in shear span to static and impact loads. Fourteen RC T-beams were tested in two groups, each of seven beams. The first group was tested under static loading up to failure, while the second group was tested under repeated impact loading until the width of shear cracks reached 0.3 mm. The residual static strengths of the beams subjected to impact loading were then determined. The test variables considered were
... Show MoreThe provision of openings in serviceable reinforced concrete beams may result in a substantial decline in the beam's capacity and integrity, indicating the necessity of opening strengthening. The present study investigates the experimental response of reinforced concrete T-beams with multiple web-strengthened openings disposed in shear span to static and impact loads. Fourteen RC T-beams were tested in two groups, each of seven beams. The first group was tested under static loading up to failure, while the second group was tested under repeated impact loading until the width of shear cracks reached 0.3 mm. The residual static strengths of the beams subjected to impact loading were then determined. The test variables considered were
... Show More