The seismic can be threatened the stability of the flexible body of the earth dam and can cause completely damaged or deformation on their embankment. Therefore, a geotechnical engineer needs to know the effect of earthquakes on earth structures. The change in the seismic zone that recently Iraq affected is the reason for this research, in general, in 2017, the whole of Iraq, and in particular the region, where the Al-Wand earth dam (the subject of the study) is located, was exposed to several earthquakes. This research project mainly aims to study the behavior of Al-Wand earth dam under seismic load in different conditions by simulating Al-Wand earth dam through numerical modeling and study the influence of water reservoir level, earthquake peak acceleration, and duration. This paper includes an analytical study of the effect of this earthquake on Al-wand earth dam, using the quake/w program, which is a sub-program of geo-studio, also the stability of the dam was studied under the influence of earthquakes of different intensity, and a review of the impact of different water levels on the stability of the body dam. Where the response of the Al-wand dam was analyzed to earthquakes at the normal and the maximum water level, and by using a quake that may have been exposed to Iraq in 2017 and used the time of 100 seconds and using an acceleration of 0.02g, 0.03g, 0.05g measured by units of ground acceleration to identify the behavior of displacements, effective stress and pore water pressure during the earthquake.
The EMERGE application from Hampsson-Russell suite programs was used in the present study. It is an interesting domain for seismic attributes that predict some of reservoir three dimensional or two dimensional properties, as well as their combination. The objective of this study is to differentiate reservoir/non reservoir units with well data in the Yamama Formation by using seismic tools. P-impedance volume (density x velocity of P-wave) was used in this research to perform a three dimensional seismic model on the oilfield of Nasiriya by using post-stack data of 5 wells. The data (training and application) were utilized in the EMERGE analysis for estimating the reservoir properties of P-wave ve
... Show MoreA geoelectrical investigation is carried out for a geological consideration in the Shewasoor dam site, which is situated 40 km northeast Kirkuk city. Symmetrical Schlumberger array were applied for fifteen electrical sounding (VES) points, with a maximum spread distance (120-200) meters. Seven vertical electric sounding (VES) points were surveyed in the main valley. Two (VES) points were taken at the area behind the dam, and two other points at the right side of the dam body. Additional four (VES) points measured at the left side within the spillway area. In order to achieve the qualitative and quantitative interpretations manual partial matching technique and (IPI2 WIN) (ID) software are used. The results show that the surface is compri
... Show MoreThe twelve samples of agricultural soils from four regions in Al-Najaf governorate with sampling plant with soil. Physical properties of the soil where studied, such as electrical conductivity ranged from (136.33-1070.00)μS/cm-3, and moisture which ranged between the values (0.39-36.48)%. The chemical analysis of the soil have included the proportion of calcium carbonate the ratio between (44.00-48.00%) has been observed increasing amounts of calcium carbonate in surface models. The pH where results indicate that pH values were close to study models ranged between (6.88-7.42) these values generally within the normal range for the measured pH values of the Iraqi soil. The amount of gypsum ranged betwe
... Show MoreThree Seismic Attributes are used to enhance or delineate geologic feature that cannot be detected within seismic resolution limit. These are Instantaneous Amplitude, Instantaneous Phase and Instantaneous Frequency Attributes. These are applied along two defined picked surface horizons within 3D seismic data for an area in southern Iraq. Two geologic features are deduced, the first represents complex channel system at the top of Saadi Formation and the second represents submarine fan within Mishrif Formation. The semblances of these ancient geological features are dramatically enhanced by using flattening technique.
Many problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented
... Show MoreLiquefied petroleum gases (LPG) consist of hydrocarbons obtained by refining crude oil, either from propane or butane or a mixture of the two. There are often other components such as propylene, butylene or other hydrocarbons, but they are not the main component. The study aims to review previous studies dealing with designing an LPG system to deliver gas to residential campuses and buildings. LPG is extracted from natural gas NG by several processes, passing through fractionation towers and then pressuring into CNG storage tanks. Gas contains several problems, including gas leakage through the pipes and leads to fires or explosions in LPG storage and distribution tanks, so safety conditions were taken in the design and implementation. T
... Show MoreThis paper proposes a novel finite-time generalized proportional integral observer (FTGPIO) based a sliding mode control (SMC) scheme for the tracking control problem of high order uncertain systems subject to fast time-varying disturbances. For this purpose, the construction of the controller consists of two consecutive steps. First, the novel FTGPIO is designed to observe unmeasurable plant dynamics states and disturbance with its higher time derivatives in finite time rather than infinite time as in the standard GPIO. In the FTGPO estimator, the finite time convergence rate of estimations is well achieved, whereas the convergence rate of estimations by classical GPIO is asymptotic and slow. Secondly, on the basis of the finite and fast e
... Show MoreThe thermal and electrical performance of different designs of air based hybrid photovoltaic/thermal collectors is investigated experimentally and theoretically. The circulating air is used to cool PV panels and to collect the absorbed energy to improve their performance. Four different collectors have been designed, manufactured and instrumented namely; double PV panels without cooling (model I), single duct double pass collector (model II), double duct single pass (model III), and single duct single pass (model IV) . Each collector consists of: channel duct, glass cover, axial fan to circulate air and two PV panel in parallel connection. The temperature of the upper and
... Show MoreAccelerates operating managements in the facilities contemporary business environment toward redefining processes and strategies that you need to perform tasks of guaranteeing them continue in an environment performance dominated by economic globalization and the circumstances of uncertainty attempt the creation of a new structure through multiple pages seek to improve profitability and sustainable growth in performance in a climatefocuses on the development of institutional processes, reduce costs and achieve customer satisfaction to meet their demands and expectations are constantly changing. The research was presented structural matrix performance combines methodology Alsigma in order to improve customer satisfaction significantly bet
... Show MoreIraq, home of the Tigris and Euphrates rivers, has survived an extreme deficiency of surface water assets over the years. The gap is due to the decline of the Iraqi water share every year, as well as a high demand for water use from different sectors, particularly agriculture.
Dam development has long given significant economic benefits to Iraq in circulating low‐priced electricity and supporting low‐income farmers by supplying them with a free irrigation system (Zakaria et al, 2012). This encouraged domestic consumption and investment.
Despite the fact that numerous advantages are expected from dam construction, it should be painstakingly assessed, utilizing cost