Preferred Language
Articles
/
NhY-IIcBVTCNdQwCnjmN
Geological Modeling and Resource Estimation for Mishrif Formation in Nasiriyah Oilfield
...Show More Authors

Resource estimation is an essential part of reservoir evaluation and development planning which highly affects the decision-making process. The available conventional logs for 30 wells in Nasiriyah oilfield were used in this study to model the petrophysical properties of the reservoir and produce a 3D static geological reservoir model that mimics petrophysical properties distribution to estimate the stock tank oil originally in place (STOOIP) for Mishrif reservoir by volumetric method. Computer processed porosity and water saturation and a structural 2D map were utilized to construct the model which was discretized by 537840 grid blocks. These properties were distributed in 3D Space using sequential Gaussian simulation and the variation in OWC depth was represented by 3 initialization regions for better characterization. The total STOOIP of Mishrif reservoir in Nasiriyah oilfield was estimated to be 8951 MMSTB which is divided between two reservoir units: MB1 and MB2 in which the first contains approximately 75% of total STOOIP and the latter has the remaining 25%.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Oct 22 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
4D Finite element modeling of stress distribution in depleted reservoir of south Iraq oilfield
...Show More Authors
Abstract<p>The harvest of hydrocarbon from the depleted reservoir is crucial during field development. Therefore, drilling operations in the depleted reservoir faced several problems like partial and total lost circulation. Continuing production without an active water drive or water injection to support reservoir pressure will decrease the pore and fracture pressure. Moreover, this depletion will affect the distribution of stress and change the mud weight window. This study focused on vertical stress, maximum and minimum horizontal stress redistributions in the depleted reservoirs due to decreases in pore pressure and, consequently, the effect on the mud weight window. 1D and 4D robust geomechanical models are</p> ... Show More
View Publication
Scopus (19)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Thu Jun 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Evaluation of the Mishrif Formation Using an Advanced Method of Interpretation
...Show More Authors

The Mishrif Formation is one of the most important geological formations in Iraq consisting of limestone, marl, and shale layers since it is one of the main oil producing reservoirs in the country, which contain a significant portion of Iraq's oil reserves. The formation has been extensively explored and developed by the Iraqi government and international oil companies, with many oil fields being developed within it. The accurate evaluation of the Mishrif formation is key to the successful exploitation of this field. However, its geological complexity poses significant challenges for oil production, requiring advanced techniques to accurately evaluate its petrophysical properties.

   This study used advanced well-logging analysi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Mar 31 2023
Journal Name
Iraqi Geological Journal
History Matching of Reservoir Simulation Model: a Case Study from the Mishrif Reservoir, Buzurgan Oilfield, Iraq
...Show More Authors

In petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
International Journal Of Agricultural And Statistical Sciences
DYNAMIC MODELING OF TIME-VARYING ESTIMATION FOR DISCRETE SURVIVAL ANALYSIS FOR DIALYSIS PATIENTS IN BASRAH, IRAQ
...Show More Authors

Survival analysis is widely applied to data that described by the length of time until the occurrence of an event under interest such as death or other important events. The purpose of this paper is to use the dynamic methodology which provides a flexible method, especially in the analysis of discrete survival time, to estimate the effect of covariate variables through time in the survival analysis on dialysis patients with kidney failure until death occurs. Where the estimations process is completely based on the Bayes approach by using two estimation methods: the maximum A Posterior (MAP) involved with Iteratively Weighted Kalman Filter Smoothing (IWKFS) and in combination with the Expectation Maximization (EM) algorithm. While the other

... Show More
View Publication Preview PDF
Scopus (2)
Scopus
Publication Date
Tue Sep 07 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
Wellbore instability management using geomechanical modeling and wellbore stability analysis for Zubair shale formation in Southern Iraq
...Show More Authors
Abstract<p>Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie</p> ... Show More
View Publication
Scopus (45)
Crossref (42)
Scopus Clarivate Crossref
Publication Date
Wed Dec 11 2013
Journal Name
Proceeding Of The 2nd International Conference On Iraq Oil Studies
Diagnosing Complex Flow Characteristics of Mishrif Formation in Stimulated Well Using Production Logging Tool
...Show More Authors

Production logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af

... Show More
Publication Date
Wed Dec 11 2013
Journal Name
Iraqi Journal Of Science
Diagnosing Complex Flow Characteristics of Mishrif Formation in Stimulated Well Using Production Logging Tool
...Show More Authors

Production logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af

... Show More
View Publication
Publication Date
Thu Nov 12 2020
Journal Name
Journal Of Petroleum Research And Studies
Production Optimization for Natural Flow and ESP Well A Case Study on Well NS-5 Mishrif Formation-Nasriya Oil Field
...Show More Authors

As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Jul 31 2019
Journal Name
Journal Of Engineering
Asphaltene Precipitation Modeling of Sadi Formation in Halfaya Iraqi Oil Field
...Show More Authors

Asphaltene is a component class that may precipitate from petroleum as a highly viscous and sticky material that is likely to cause deposition problems in a reservoir, in production well, transportation, and in process plants. It is more important to locate the asphaltene precipitation conditions (precipitation pressure and temperature) before the occurring problem of asphaltene deposition to prevent it and eliminate the burden of high treatment costs of this problem if it happens. There are different models which are used in this flow assurance problem (asphaltene precipitation and deposition problem) and these models depend on experimental testing of asphaltene properties. In this study, the used model was equation of

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Jan 31 2019
Journal Name
Journal Of Engineering
Estimation of Cutoff Values by Using Regression Lines Method in Mishrif Reservoir/ Missan oil Fields
...Show More Authors

Net pay is one of the most important parameters used in determining initial oil in place of a reservoir. It can be delineated through the using of limiting values of the petrophysical properties of the reservoir. Those limiting values are named as the cutoff. This paper provides an insight into the application of regression line method in estimating porosity, clay volume and water saturation cutoff values in Mishrif reservoir/ Missan oil fields. The study included 29 wells distributed in seven oilfields of Halfaya, Buzurgan, Dujaila, Noor, Fauqi, Amara and Kumait.

This study is carried out by applying two types of linear regressions: Least square and Reduce Major Axis Regression.

The Mishrif formation was

... Show More
View Publication Preview PDF
Crossref (4)
Crossref