Preferred Language
Articles
/
MhdzCo4BVTCNdQwC9zDF
Fundamental Challenges and Management Opportunities in Post Disaster Reconstruction Project
...Show More Authors

The study examines the root causes of delays that the project manager is unable to resolve or how the decision-maker can identify the best opportunities to get over these obstacles by considering the project constraints defined as the project triangle (cost, time, and quality) in post-disaster reconstruction projects to review the real challenges to overcome these obstacles. The methodology relied on the exploratory description and qualitative data examined. 43 valid questionnaires were distributed to qualified experienced engineers. A list of 49 factors causes was collected from previous international and local studies. A Relative Important Index (RII) is adapted to determine the level of importance of each sub-criterion in the four main criteria (scope, time, cost, and quality) to represent the causing changes in projects. The concluded 13 important factors represent the challenges faced by managers. This process requires active participation in the management role to overcome potential delays that face a great challenge and cause huge waves of displacement that affect the Iraqi economy and lead to social and environmental modifications. Reconstruction projects create jobs, improve the quality of life, and encourage people to return to their homes and rebuild their cities. So, unlocking local potential is the key to sustainable rebuilding in Iraq. Doi: 10.28991/CEJ-2023-09-09-05 Full Text: PDF

Scopus Clarivate Crossref
View Publication
Publication Date
Sun Apr 19 2015
Journal Name
Wireless Networks
Design and evaluation of distributed and dynamic mobility management approach based on PMIPv6 and MIH protocols
...Show More Authors

View Publication
Scopus (18)
Crossref (12)
Scopus Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 07 2019
Journal Name
Iraqi Journal Of Laser
Acne Scar Management by Fractional CO2 Laser
...Show More Authors

Acne scars are one of the most common problems following acne vulgaris. Despite the extensive list of available treatment modalities, their effectiveness depends upon the nature of the scar. Ablative lasers had been used to treat acne scars; one of them is the fractional CO2 laser. The aim of this study is to evaluate the outcome of fractional CO2 laser in the treatment of acne scars. Methods: Since January 2010 to June 2013, using 10600 nm fractional CO2 laser beams, the acne scar of 400 patients, 188 males and 212 females, mean age of 34 years, have been treated and classified according to severity into four grades following Goodman and Baron classification. Each patient underwent 3-5 sessions once monthly. The mean laser exposure time

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 30 2012
Journal Name
Al-kindy College Medical Journal
Evaluation of Management of Closed Spinal Injury
...Show More Authors

Objectives: to evaluate the role of conservative, decompression, spine fixation in management of closed spinal injury.
Methods: The study was conducted at Specialized Surgical hospital and Al-Kadhemayia Teaching Hospital, in the period between July 2003 and July 2005.The study included 61 patients categorized Into many groups according level of vertebral injury (cervical, cervicodorsal, dorsal, dorsolumbar, Lumbar and lumbosacral), type of injury (compressed fracture, burst fracture and fracture dislocation) And according the severity into three groups as G1( complete motor paralysis and sensory loss ) G2 ( complete motor paralysis and incomplete sensory loss) and G3 ( incomplete motor paralysis And incomplete sensory loss ).The metho

... Show More
View Publication Preview PDF
Publication Date
Mon Apr 01 2019
Journal Name
Journal Of Educational And Psychological Researches
Life Management Strategies among Mosul University Academics
...Show More Authors

The study aims to measure life management (in its various approaches) among   university academics and to identify the differences among life management strategies (in its various approaches) in regard of gender (male, female), field of education (scientific, humanitarian) and title (assistant lecturer, lecturer, assistant professor, and professor). The study sample consisted of (246) male and female academics from four colleges (Arts, Science, Science education, and Humanitarian Science Education). To achieve the goals of the study, the researchers used the Freund & Baltes (2002) life-management strategies scale after translating it and determining its parameters of reliability and validity. The statistical analysis of the

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 30 2021
Journal Name
Baghdad Science Journal
Delivery Route Management based on Dijkstra Algorithm
...Show More Authors

For businesses that provide delivery services, the efficiency of the delivery process in terms of punctuality is very important. In addition to increasing customer trust, efficient route management, and selection are required to reduce vehicle fuel costs and expedite delivery. Some small and medium businesses still use conventional methods to manage delivery routes. Decisions to manage delivery schedules and routes do not use any specific methods to expedite the delivery settlement process. This process is inefficient, takes a long time, increases costs and is prone to errors. Therefore, the Dijkstra algorithm has been used to improve the delivery management process. A delivery management system was developed to help managers and drivers

... Show More
View Publication Preview PDF
Scopus (4)
Scopus Clarivate Crossref
Publication Date
Fri Dec 01 2023
Journal Name
Al-khwarizmi Engineering Journal
Secure Seaport Management System using Blockchain Technology
...Show More Authors

Worldwide, shipping documents are still primarily created and handled in the traditional paper manner. Processes taking place in shipping ports as a result are time-consuming and heavily dependent on paper. Shipping documents are particularly susceptible to paperwork fraud because they involve numerous parties with competing interests. With the aid of smart contracts, a distributed, shared, and append-only ledger provided by blockchain technology allows for the addition of new records. In order to increase maritime transport and port efficiency and promote economic development, this paper examines current maritime sector developments in Iraq and offers a paradigm to secure the management system based on a hyper-ledger fabric blockchain p

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences 318, 03006 (2021)
Effect of External Post-Tensioning Strengthening Technique on Flexural Capacity of Simple Supported Composite Castellated Beam
...Show More Authors

This research is carried out to study the effect of the external post-tensioning technique on the flexural capacity of simply supported composite castellated beam experimentally. In this research, seven composite castellated beams having the same dimensions and material properties were cast and tested up to failure by applied two concentrated loads at 700 mm from each end. Two external strands of 12.7 mm diameter were fixed at each side of the web of strengthening beams and located at depth 180 mm from top fiber of the section (dps) at each end of the beam. The strands have been tensioned by using a hydraulic jack with a constant stress of 100 MPa. This research aims to study the effect of the strengthening by different shapes of st

... Show More
Scopus (2)
Scopus Crossref
Publication Date
Mon Dec 30 2002
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Thermal Conductivity Characteristics of Polymer composites Based on Polyethylene Wastes Filled with Post-Industry Wood Wastes
...Show More Authors

View Publication Preview PDF
Publication Date
Fri Mar 01 2013
Journal Name
مجلة ميسان لعلوم التربية البدنية
Consistent determinants of post-stroke health-related quality of life across diverse cultures: Berlin-Ibadan study
...Show More Authors

View Publication