A stochastic process {Xk, k = 1, 2, ...} is a doubly geometric stochastic process if there exists the ratio (a > 0) and the positive function (h(k) > 0), so that {α 1 h-k }; k ak X k = 1, 2, ... is a generalization of a geometric stochastic process. This process is stochastically monotone and can be used to model a point process with multiple trends. In this paper, we use nonparametric methods to investigate statistical inference for doubly geometric stochastic processes. A graphical technique for determining whether a process is in agreement with a doubly geometric stochastic process is proposed. Further, we can estimate the parameters a, b, μ and σ2 of the doubly geometric stochastic process by using the least squares estimate for Xk and ln Xk, as well as the linear regression method, where μ and σ2 are the mean and variance of X1, respectively. A real-world example is used to demonstrate the process. Furthermore, the estimators' output is evaluated using a real-world example. © 2021 DAV College. All rights reserved.
In this research we assumed that the number of emissions by time (𝑡) of radiation particles is distributed poisson distribution with parameter (𝑡), where < 0 is the intensity of radiation. We conclude that the time of the first emission is distributed exponentially with parameter 𝜃, while the time of the k-th emission (𝑘 = 2,3,4, … . . ) is gamma distributed with parameters (𝑘, 𝜃), we used a real data to show that the Bayes estimator 𝜃 ∗ for 𝜃 is more efficient than 𝜃̂, the maximum likelihood estimator for 𝜃 by using the derived variances of both estimators as a statistical indicator for efficiency
The heterogeneity nature of carbonate reservoirs shows sever scattering of the data, therefore, one has to be cautious in using the permeability- porosity correlation for calculating permeability unless a good correlation coefficient is available. In addition, a permeability- porosity correlation technique is not enough by itself since simulation studies also require more accurate tools for reservoir description and diagnosis of flow and non-flow units. Evaluation of reservoir characterization was conducted by this paper for Mishrif Formation in south Iraqi oil field (heterogeneous carbonate reservoir), namely the permeability-porosity correlation, the hydraulic units (HU’s) and global hydraulic elements (GHE
... Show MoreThis paper deals with constructing mixed probability distribution from mixing exponential
Evaporation from water bodies is important and considered a major problem in dry and semi-dry regions, in this research the evaporation has been analyzed from two approaches: engineeringly and statistically. The engineering approach deals with the calculation of evaporation rates of Mosul Dam Lake. Three methods were used: pan evaporation class A, the combined and the mass-transfer. It was found that the values obtained by pan evaporation class A method was the highest among the other, while the mass transfer method achieved the lowest results. The evaporation rates during the year ranged according to the first method (0.9–5.5) mm/day, second (0.7–11.5) mm/day and the last method (1.0039×106) m3/year, whi
... Show MoreThere many methods for estimation of permeability. In this Paper, permeability has been estimated by two methods. The conventional and modified methods are used to calculate flow zone indicator (FZI). The hydraulic flow unit (HU) was identified by FZI technique. This technique is effective in predicting the permeability in un-cored intervals/wells. HU is related with FZI and rock quality index (RQI). All available cores from 7 wells (Su -4, Su -5, Su -7, Su -8, Su -9, Su -12, and Su -14) were used to be database for HU classification. The plot of probability cumulative of FZI is used. The plot of core-derived probability FZI for both modified and conventional method which indicates 4 Hu (A, B, C and D) for Nahr Umr forma
... Show MoreIn this paper, the method of estimating the variation of Zenith Path Delay (ZPD) estimation method will be illustrate and evaluate using Real Time Kinematic Differential Global Positioning System (RTK-DGPS). The GPS provides a relative method to remotely sense atmospheric water vapor in any weather condition. The GPS signal delay in the atmosphere can be expressed as ZPD. In order to evaluate the results, four points had been chosen in the university of Baghdad campus to be rover ones, with a fixed Base point. For each rover position a 155 day of coordinates measurements was collected to overcome the results. Many models and mathematic calculations were used to extract the ZPD using the Matlab environment. The result shows that the ZPD valu
... Show MoreThe charge transfer at C23H17F8N8O2PRu, C44H30BF4N5O4Ru, C56H52CL5N5OOsP2 and C76H88F80N24O11P10Ru4 nitrosyl complexes are investigation and studies theoretically using the quantum consideration. Charge transfer behavior largely rely to the electric properties of nitrosyl complexes system whose depending on the main important parameters for the transmission rate constant such that: orientation transition energy, overlapping coupling coefficient, driving force energy, height barrier and Temperature T (K). Data results have been evaluated using a MATLAB program. Results show that rate of charge transfer increases due to increases the orientation transition energy.
In this study the design and installation of evaporative air cooler was carried out using completely outdoor air (fresh air) according to two stage evaporative cooling principle. The laboratory equipment was installed by designing and manufacturing a cross flow plate heat exchanger, where aluminum plates used for this purpose with dimensions (50 × 30 × 40 cm). The surfaces of heat exchanger were covered by sawdust from wetted channels side, to increase the percentage of wetting these surfaces and hence improve the performance and efficiency of air cooler.
An experimental study was carried out to estimate the performance of cooling system, where som
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show More